The invention relates to a method for manufacturing a 300 MW stage heavy fuel
machine nozzle swirler
assembly, solves the problem of low production efficiency of an existing method for manufacturing a300 MW stage heavy fuel
machine nozzle swirler
assembly, and belongs to the technical field of heavy fuel
machine manufacturing. The method comprises the following steps that 1, three tools are manufactured, the
assembly welding sequence of each part is determined, one end of a first tool with a large
radius and a second tool are used to assemble a swirler and a front joint, the swirler is coaxial with and makes contact with the front joint, and simultaneously the swirler and an outer ring are assembled, and contact positions of the swirler and the front joint are welded; 2, the swirler is overturned, one end of the first tool with a small
radius is used to make coaxially contact with a corrugated assembly with the swirler, and
welding is performed; 3, a rear joint sleeves the end of thefirst tool with the small
radius and penetrates through the corrugated
pipe assembly, the rear joint is coaxial with the swirler by using a third tool, and contact positions of the rear joint and theswirler are welded; 4, the outer ring and a front ring are welded to the swirler; and 5, a
welding positioning fixture is removed after the welding is completed.