The invention discloses an intensive
seismic zone landslide prevention and treatment
engineering health assessment and maintaining method which comprises the steps of establishing of an assessment
system of a blocking wall, an anti-sliding
pile health diagnostic indicator
system and a pre-stressed anchor cable health diagnostic indicator
system. The assessment system of the blocking wall is subjected to assessment with a fuzzy comprehensive method and a grey
theory method. According to the anti-sliding
pile health diagnostic indicator system, lists are used for carrying out field investigation, deforming measuring, foundation
pile non-loss detecting and
drill core sampling verifying, and finally a conclusion is obtained. According to the pre-stressed anchor cable health diagnostic indicator system, a fuzzy comprehensive assessment method is used, assessment of sensitive factors (a damage range is larger than or equal to 60%) is carried out first, and when the damage range of anchor cable
engineering is limited, general factor assessment is carried out. The method has the advantages that through
health assessment of intensive
seismic zone (side)
landslide prevention and treatment
engineering, the health state of certain prevention and treatment engineering can be quickly and efficiently judged, a structure damage position, a damage type and the damage degree are obtained, and accordingly preventive measures are carried out in advance.