The application provides a tunnel leakage water site rapid positioning and grouting effect real-time
evaluation system, and belongs to the technical field of
tunnel engineering monitoring. The
system comprises: an intelligent inspection and accurate positioning subsystem, which is used for automatically collecting multi-source
perception data on the lining surface and outputting three-dimensional coordinates of the leakage site through multi-
modal data fusion; a grouting process
dynamic monitoring and regulation subsystem, which is used for collecting grouting parameters and
physical field response signals in real time, performing state analysis and intelligent early warning; a grouting effect multi-sequential quantitative evaluation subsystem, which is used for repeatedly collecting
physical field information at different stages of
slurry setting to generate quantitative evaluation indexes; and a central
processing and decision platform, which is used for coordinating and scheduling the subsystems,
processing and fusing whole-process data, and generating decision instructions. The application realizes whole-process closed-loop
intelligent management of leakage diseases from accurate positioning, process
controllability to effect
verification, and significantly improves the accuracy, reliability and efficiency of treatment.