Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

3results about How to "Extended preparation time" patented technology

Detection cable for ground joint test of aircraft penetration standard interface

The utility model provides a kind of detection cable for airplane standard interface real bullet ground joint test, belong to electronic equipment test technical field, including discrete signal line group, it is used to detect the signal interaction function of missile;Power line group, it is used to detect the power supply line of various components inside missile;Address line group, it is used to detect and feedback missile detection port insert position;Bandwidth line group, it is used to detect the satellite launch signal function inside missile;Bus line group, it is used to detect the data transmission function inside missile;The utility model can detect each function module of missile without disassembling missile, so as to avoid damage when missile is mounted.
Owner:CHINESE PEOPLES LIBERATION ARMY UNIT 94857

A prefabricated beam plate quick-release formwork support device

ActiveCN224689272Uincrease contact areaextended preparation time
The utility model discloses a prefabricated beam board quick detachable formwork supporting device relates to prefabricated beam board quick detachable formwork technical field, including stable mechanism, the stable mechanism is provided with two, two the stable mechanism includes stable board, push board, through groove and sliding assembly, the through groove is set up in the support seat left and right sides, push board outer surface sliding connection in through groove inner wall, the stable board opposite side fixed connection in push board opposite end, sliding assembly sets up in push board opposite end. The utility model discloses a stable mechanism is set up, has solved to the support of different prefabricated beam, needs to replan the plane layout of support column, repetitive handling, positioning and adjustment work, not only has greatly increased the preparation time before construction, and reduced the construction efficiency problem.
Owner:ZHEJIANG JINZHU TRANSPORTATION CONSTR