The invention provides a control method of a power conversion circuit, power conversion equipment and a power supply
system. The control method comprises the following steps: acquiring a real-time alternating-
current voltage on a second end of the secondary
bridge circuit, and when the real-time alternating-
current voltage is in a preset transition region of a
voltage zero crossing point, controlling each switching tube in the secondary
bridge circuit to perform on-off action within secondary
switching time so as to enable the secondary
bridge circuit to perform power conversion; and when the real-time AC
voltage is in the preset transition region of the
voltage zero crossing point, controlling a part of switch tubes in the
secondary side bridge circuit to be switched on within the
secondary side dead zone time, so that the
secondary side bridge circuit and the secondary side of the
transformer form a follow
current loop. By means of the method, the power conversion circuit is not prone to generating current oscillation near the voltage
zero crossing point, and therefore overstress damage of a secondary side switch tube can be avoided, and the current waveform can be optimized.