The invention discloses a strengthening construction process for a comprehensive pipe rack pre-embedded steel edge water-stop belt and a water-stop steel plate, and belongs to the field of architectural engineering. The strengthening construction process is characterized in that a plurality of positioning ribs are horizontally arranged on the bottom of the water-stop steel plate, a plurality of pairs of strengthening steel bars are mounted at the left side and the right side of the water-stop steel plate, and the water-stop steel plate is squeezed, so that the water-stop steel plate is prevented from longitudinally shifting and transversely shifting, and therefore, displacement deviation of the water-stop steel plate is greatly reduced, an accuracy rate and a qualification rate of the water-stop steel plate pre-embedding material are remarkably increased, construction efficiency is improved, construction quality is guaranteed, and specifications are met. According to the strengtheningconstruction process disclosed by the invention, a double-layer positioning box is adopted to integrally oppositely pull and strengthen the steel edge water-stop belt, so that a strengthening area between the positioning box and the water-stop belt is increased, a condition that the steel edge water-stop belt deviates when the concrete is vibrated as a result of strengthening the steel edge water-stop belt in the prior art is avoided, the accuracy rate and the qualification rate of the steel edge water-stop belt pre-embedding material are remarkably increased, construction efficiency is improved, construction quality is guaranteed, and the specifications are met.