Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

2results about How to "Reasonable pressure" patented technology

New energy base distributed energy storage configuration optimization method and device and electronic equipment

PendingCN122740201AImprove consumption levelreduce dependence
This application provides a method, apparatus, and electronic equipment for optimizing the distributed energy storage configuration in a new energy base. The method includes: determining a set of candidate distributed energy storage ratios for the new energy base to be configured with an energy storage system; acquiring operational data of the new energy base within a preset time period; constructing an energy storage configuration optimization model; for each candidate distributed energy storage ratio, solving the problem based on the operational data and the energy storage configuration optimization model to determine the total high-voltage side power supply and total operation and maintenance cost corresponding to that ratio; determining a target distributed energy storage ratio from the set of candidate distributed energy storage ratios based on the total high-voltage side power supply and total operation and maintenance cost corresponding to each candidate distributed energy storage ratio; and configuring energy storage in the new energy base based on the target distributed energy storage ratio. This application achieves a reasonable distributed energy storage configuration without changing the total planned energy storage capacity of the base, reducing dependence on high-voltage side power supply.
Owner:SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD

A gas-steam combined cycle unit

ActiveCN224550231Uimprove working conditionsGuaranteed uptimeThermodynamicsProcess engineering
The utility model discloses a kind of gas steam combined cycle units, comprising: first unit and second unit, respectively equipped with gas turbine system, form first gas turbine and second gas turbine;First gas turbine water supply pipeline, through first gas turbine shut first valve body and second valve body;Second gas turbine water supply pipeline, through second gas turbine shut third valve body and fourth valve body;First gas turbine water supply flow regulating valve, set on first gas turbine water supply pipeline;Second gas turbine water supply flow regulating valve, set on second gas turbine water supply pipeline, including second condenser side regulating valve and second waste heat boiler side regulating valve, the technical scheme of this gas steam combined cycle unit can improve FGH system start-up problem, optimize the FGH water supply system design of two sets of units, to ensure that under different operating conditions, FGH system can be normally put into operation, improve the efficiency of gas turbine and stabilize unit load.
Owner:DONGGUAN YUEWAN NEW ENERGY CO LTD