Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

60results about How to "Solve the problem of difficult installation" patented technology

Mounting method and device with acoustic emission sensor recycling capacity

The invention provides a mounting method and device with acoustic emission sensor recycling capacity. The method comprises the following steps: a, an acoustic emission sensor is fixed in a cavity of a recovery device by a fixing claw; b, the recovery device is mounted in a drill hole, and the front end of a waveguide rod arranged in the recovery device extends deeply into a coal-rock mass body in front of the hole bottom; and c, after monitoring, the sensor is taken out from the rear end of the cavity of the recovery device, and sensor recovery is finished. The specially designed acoustic emission sensor recovery device is used for fixing the sensor in the wall of the drill hole of the mine coal-rock mass body, the mounting method and device are applied to inside of drill holes with any angles in the coal-rock mass bodies with different hardness, can effectively solve the problems that the sensor is difficult to mount and is not mounted in place in depth due to hole collapse and the problems about recycling and the like, and has the advantages that the reliability is high, the signal monitoring precision is increased, noise interference is isolated, mounting is convenient and fast, the sensor can be recycled and the like; and further, the operation difficulty and economic cost are reduced, the mounting efficiency is increased, a better application effect is obtained, and field popularization and application are facilitated.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Portable communicated-hole numerically-controlled cutting machine

The invention discloses a portable communicated-hole numerically-controlled cutting machine comprising a support unit, a main machine unit and a control unit. The support unit comprises a first support, a second support, a third support and a fourth support. A strong magnetic base is arranged at the bottom of the first support, the third support is of a cantilever structure, one end of the third support is connected with the first support, and the second support is arranged between the first support and the third support. The main machine unit comprises a gas distributor, a cutting gun, an air pipe, a motor shell, a first stepping motor, a second stepping motor, a first shell, a second shell, a main machine junction box, an upright, a coupler, a height moving block, a positioning laser device and a connection device. The portable communicated-hole numerically-controlled cutting machine has the advantages that the strong magnetic attraction base is adopted to guarantee reliability of machining processes, the cutting machine is designed integrally and optimally, is simple and convenient to operate and substitutes for original heavy equipment of the same kind to be instrumentalized, operation is simplified, portability is achieved and use cost is reduced.
Owner:上海宣邦金属新材料科技有限公司

Smart home control system

The invention provides a smart home control system. The smart home control system comprises at least one electronic switch, a motherboard, a signal acquisition module, a communication module, a main control module and a man-machine interaction module; household electric appliances are connected with the bottom plate through the electronic switches; the electronic switches are in pluggable connection with the bottom plate; the signal acquisition module is connected with the bottom plate; the bottom plate, the communication module and the human-machine interface module are respectively connected with the main control module; the signal acquisition module transmits acquired working voltage, working current, electric leakage current, and the temperature value signals of wires to the main control module through the bottom plate, so that the working voltage, working current, electric leakage current, and the temperature value signals of the wires can be processed; the main control module transmits the processed signals to the human-computer interaction module for displaying the signals, and transmits switching-on and switching-off signals to the electronic switches through the bottom plate; and the main control module communicates with an external intelligent terminal through the communication module. The smart home control system of the invention can be fixedly installed in a concealed installation power distribution box or an air switch box, and therefore, the smart home control system will not occupy additional space, and room wiring is not required to be changed. The smart home control system has the advantages of simple installation, intuitive display and convenient operation.
Owner:沈德稳

Sleeve combined type embedded part for rebar dense part of high-temperature gas-cooled reactor containment building

The invention relates to a sleeve combined type embedded part for a rebar dense part of a high-temperature gas-cooled reactor containment building, and belongs to the technical field of nuclear powerengineering construction. The sleeve combined type embedded part comprises an anchor plate, a twistable anchor rib and a threaded connection sleeve. An internal thread is machined in the threaded connection sleeve. One end of the threaded connection sleeve is directly connected to the inner surface of the anchor plate through welding. An external thread is machined in one end of the twistable anchor rib. The end, with the external thread, of the twistable anchor rib is screwed into the internal thread of one end of the threaded connection sleeve and screwed down to form threaded connection. Bymeans of the sleeve combined type embedded part, the problem that conventional anchor plate-anchor rib welded type embedded parts especially some large embedded parts of a rebar dense part of a containment building are difficult to install in place is successfully solved, the installation quality and construction efficiency of the embedded part are greatly improved, the construction cycle of thecontainment building is shortened, and the sleeve combined type embedded part has application and popularization value for designing and installing of embedded parts of rebar dense parts in other nuclear reactor types and other engineering fields.
Owner:CHINERGY CO LTD

Propeller installation technological method

The invention discloses a propeller installation technological method. The method is characterized by including the following steps that A, temporary eye plates for installation of a propeller are arranged in regions of a ship shell plate and a deck, and chain blocks used for installation and adjustment are hung on the temporary eye plates; B, a ship is dragged into a launch barge, and the launch barge berths to an assigned wharf region in a shifting manner; C, the propeller is placed on a scow through a tower crane, and the four corners of the propeller are fixed; D, the scow is moved to the edge of the launch barge, and the propeller is lifted through the tower crane and a caterpillar crane so as to be turned over; E, after the propeller is lifted to be in a vertical state, auxiliary lifting points of the caterpillar crane are detached; F, the chain block hung on a main deck is connected with the eye plate at the top of the propeller, a main tower crane lifting point on the propeller is removed after a belt is tightened, and the propeller is continuously lifted through the corresponding chain block; and G, the installation angle of the propeller is adjusted through the chain block hung on the ship shell plate. By the adoption of the propeller installation technological method, the problem that the propeller is difficult to install is solved, and the installation cost is reduced.
Owner:COSCO DALIAN SHIPYARD

Power transmission tower used on the basis of electric power transmission

The invention relates to the technical field of electric power transmission and discloses a power transmission tower used on the basis of electric power transmission. The power transmission tower usedon the basis of electric power transmission comprises a base; a tower main body is fixedly connected to the upper end of the base; clamping mechanisms are arranged on the two sides of the upper end of the tower main body; the clamping mechanisms comprise external frames; lead screws are arranged to run through the bottoms of the external frames; extruding plates are fixedly connected to the upperends of the lead screws; rotating discs are fixedly connected to the lower ends of the lead screws; and a protecting box is fixedly connected to the upper side of the interior of the tower main body.According to the power transmission tower used on the basis of electric power transmission, through skidproof grain structures at the upper ends of the extruding plates, electric wire connectors canbe more stably fixed between the external frames and the extruding plates to be unable to slide; and moreover, through natural fears of common birds to birds of prey, the nearby birds can be driven atvisual and aural levels, odour of faeces of the birds of prey can more rapidly emit to a wider range; and therefore, the birds in a coverage area do not dare to stay on electric wires.
Owner:胡晓霖

Automatic equipment vacuum chuck convenient to move

The invention discloses an automatic equipment vacuum chuck convenient to move. Comprising a first motor, a supporting rod, a hydraulic push rod, a vacuum generator, an adjusting disc, an extending plate, a moving plate, a base, a baffle, walking wheels, a control panel, a suction pad, a through hole, a sleeve, a connecting plate, an auxiliary plate, a sleeve plate, a lead screw, a connecting pipe, a suction cup sleeve, a suction cup hoop, a transverse rod, a second motor, a driving disc, a third motor and a gasket. A lead screw can adjust the position of a sucker at the bottom of the auxiliary plate, the sucker can make contact with workpieces conveniently, an adjusting disc can be rotationally adjusted, and the sucker can suck and move the workpieces placed at different positions conveniently; the hydraulic push rod can assist the sucker to adjust the height, the movable plate can move in the base, adjustment of the discharging position of the sucker is facilitated, the extension plate can be stretched for use, and the gasket can support and protect the bottom of a workpiece during discharging. The sucker hoop can reinforce the connection of the suction pad and the sleeve, the sucker sleeve can increase the contact area of the sucker and a workpiece, and the sucker is convenient to mount and dismount.
Owner:苏州精细铧智造科技有限公司

Hollow aerated concrete slab with reinforcing columns and processing method of hollow aerated concrete slab

The invention discloses a hollow aerated concrete slab with reinforcing columns, which comprises a base plate, a closed cavity is formed in the base plate, and a plurality of reinforcing columns are formed in the cavity; organic heat preservation layers and organic waterproof layers are formed on the inner walls of the cavities and the outer walls of the reinforcing columns; meanwhile, the invention further provides a processing method of the hollow aerated concrete slab with the reinforcing columns. According to the autoclaved aerated concrete slab, the structural form of the autoclaved aerated concrete slab is changed, a closed cavity is formed after the organic heat preservation board in the concrete slab is subjected to hot melting, air convection is effectively reduced, and the sound insulation effect and the heat preservation effect of the concrete slab are improved; and the hot-melted organic matters are perfectly attached to the surfaces of the cavities, so that the thermal insulation performance of the wallboard is further improved. The space structure reinforcing columns integrally formed on the base plate layer effectively improve the integral rigid strength of the concrete plate, so that the inner plate and the outer plate of the hollow plate are connected into a whole, and the problem of rigidity weakening caused by hollow arrangement is perfectly avoided.
Owner:翟贤明 +1

Dust removal device for zinc oxide powder production

The invention discloses a dust removal device for zinc oxide powder production. The dust removal device comprises a base, wherein a power supply box is arranged on one side of the front surface of thebase, a main shell is fixed at the top end of the base, and a feeding opening and a discharging opening are formed in the two sides of the main shell respectively. A mounting plate is arranged between the feeding hole of the main shell and the side wall of the discharging hole, a fixing groove is formed in the center of the top of the mounting plate, an upper sliding groove and a lower sliding groove which are fixed at the upper end and the lower end of the fixing groove are cooperatively used with the fixing groove, an inclined plate is arranged on the side wall of the bottom end of the inner part of the main shell, a first dust outlet arranged at the position of the inner top end of the base is cooperatively used with the inclined plate, and a dust collecting box is fixed below the first dust outlet through a sliding block installed on a sliding rail. An upper dust removal brush, a lower dust removal brush, the dust collection box, the sliding rail and a sliding block structure arearranged, so that the dust removal device has the advantages that the dust removal efficiency is high, dust is properly treated, and the device for treating the dust is convenient and fast to mount and dismount.
Owner:XINGHUA SANYUAN ZINC

Connecting structure of assembly type composite floor slab and cast-in-place beam

PendingCN114016649AQuick hoisting in placeIncrease productivityFloorsGirdersFloor slabRebar
The invention discloses a connecting structure of an assembly type composite floor slab and a cast-in-place beam. The connecting structure comprises the cast-in-place beam installed in a cast-in-place beam formwork and the composite floor slab connected with the cast-in-place beam in a pouring mode. The two sides of the cast-in-place beam extend outwards to form lifting lugs, and the lifting lugs are provided with annular stirrups used for being matched with the composite floor slab for use. According to the connecting structure of the technical scheme, the composite floor slab can be rapidly hoisted in place on a construction site, collision between reserved anchoring steel bars of the composite floor slab and cast-in-place beam longitudinal bars and stirrups is avoided, and the problem that the composite floor slab is not easy to install, and the longitudinal steel bars and the annular stirrups are arranged at the lifting lugs is solved, when the composite floor slabs are divided, corner cutting does not need to be carried out at the beam-column connecting positions, the composite floor slabs split through the method are all regular rectangles, the production and construction efficiency of the composite floor slabs is improved, and it is guaranteed that the stress performance of the connecting joints of the composite floor slabs and the cast-in-place beams is reliable.
Owner:CISDI ENG CO LTD

Thruster installation process

The invention discloses a propeller installation technological method. The method is characterized by including the following steps that A, temporary eye plates for installation of a propeller are arranged in regions of a ship shell plate and a deck, and chain blocks used for installation and adjustment are hung on the temporary eye plates; B, a ship is dragged into a launch barge, and the launch barge berths to an assigned wharf region in a shifting manner; C, the propeller is placed on a scow through a tower crane, and the four corners of the propeller are fixed; D, the scow is moved to the edge of the launch barge, and the propeller is lifted through the tower crane and a caterpillar crane so as to be turned over; E, after the propeller is lifted to be in a vertical state, auxiliary lifting points of the caterpillar crane are detached; F, the chain block hung on a main deck is connected with the eye plate at the top of the propeller, a main tower crane lifting point on the propeller is removed after a belt is tightened, and the propeller is continuously lifted through the corresponding chain block; and G, the installation angle of the propeller is adjusted through the chain block hung on the ship shell plate. By the adoption of the propeller installation technological method, the problem that the propeller is difficult to install is solved, and the installation cost is reduced.
Owner:COSCO DALIAN SHIPYARD

Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof

InactiveCN103541371BOvercome the shortcomings of traditional construction difficultySolve technical problems in construction safetyArtificial islandsUnderwater structuresSubway stationHeat pipe
The invention discloses a construction method of a bearing platform for heating pipe channels to stride a reserved subway station. The bearing platform comprises a platform plate and stand columns which support the platform plate; the bearing platform supports lower portions of heating pipes; guard piles and a waterproof curtain surround the periphery of the bearing platform; the height of the platform plate of the bearing platform coincides with that of a top mark of the reserved subway station; the stand columns which are steel structured lattice columns comprise portions which are reserved above a bottom line of a foundation ditch of the reserved subway station and portions which are reserved under the bottom line of the foundation ditch of the reserved subway station; the stand column portions which are reserved under the bottom line of the foundation ditch of the reserved subway station are inserted in reinforcement cages inside the piles and are combined into a whole through concrete pouring. The bearing platform is simple in structure and convenient to construct and enables later subway station construction to be normally operated under the platform due to the fact that the bearing platform is arranged under the heating pipes and the construction is not influenced by the front constructed heating pipes, does not influence safe quality of the heating pipes and provides favorable reference for similar intersection problem of underground engineering.
Owner:BEIJING URBAN CONSTR YATAI GRP

Ship deck crane steel wire rope installation process method

The invention discloses a ship deck crane steel wire rope installation process method. The method comprises the following steps that a, a traction nylon rope is installed; b, mounting a first traction steel wire rope; c, mounting a second traction steel wire rope; d, hoisting and placing the main steel wire rope transportation winding drum on the second rope winding machine by using a sea crane until a shaft of the second rope winding machine is completely inserted into a central hole of the main steel wire rope transportation winding drum, clamping and locking, switching on a power supply, debugging the second rope winding machine, and checking whether the second rope winding machine is normal or not; e, the PW125 connector is welded to the end of the main steel wire rope, and NDT flaw detection is conducted after welding; f, mounting a main steel wire rope; g, a main steel wire rope entering point is found, the end of the main steel wire rope is placed in a winding drum rope pressing end hole of the rope storage winch, and a bolt is screwed for fixing; h, loosening the main steel wire rope clamp, and continuously winding the main steel wire rope until the main steel wire rope on the main steel wire rope conveying drum is completely separated; i, pouring rope joints; and j, mounting a main hook. The method successfully solves the problem that the crane steel wire rope is difficult to install.
Owner:COSCO DALIAN SHIPYARD

Foldable operating hanging basket

The invention provides a foldable operating hanging basket. The foldable operating hanging basket includes an operating platform and a hanging basket main body, wherein the hanging basket main body isrotationally hinged on one side of the operating platform; the hanging basket main body includes a first hanging basket frame, a second hanging basket frame and a first support rod; the first hangingbasket frame and the second hanging basket frame are connected by the e first support rod; the first support rod includes a plurality of straight support rods, and at least two inclined support rods;the straight support rods are rotationally hinged between the first hanging basket frame and the second hanging basket frame; and one end of each inclined support rod is rotationally hinged on the first hanging basket frame, and the other end of each inclined support rod is detachably connected to the second hanging basket frame. According to the foldable operating hanging basket, one end of eachinclined support rod is rotationally hinged on the first hanging basket frame, and when the other end of the inclined support rod is free, the operating platform and the second hanging basket frame rotate and fold counterclockwise to obtain a foldable operating hanging basket that can be mass-produced and easy to install, so that the difficult installation and safety risks during on-site production are avoided.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Electric type soil sampling TRIME pipe mounting machine

The invention provides an electric type soil sampling TRIME pipe mounting machine. The electric type soil sampling TRIME pipe mounting machine comprises an oil pick, a connector, a steel pipe, a transparent resin pipe, a guide pipe, a balance bracket and a knife set, wherein an output shaft of the oil pick is connected with the upper end of the connector; the upper end of the steel pipe is connected with the lower end of the connector; the transparent resin pipe sleeves the steel pipe; a guide pipe through hole is formed in the upper end face of the balance bracket; the guide pipe is vertically arranged; the lower part of the guide pipe penetrates through the guide pipe through hole formed in the upper end face of the balance bracket and is fixedly connected with the upper end face of thebalance bracket; then the steel pipe and the transparent resin pipe are inserted into the guide pipe; the knife set is stuck on an inner wall of the transparent resin pipe and the lower end of the steel pipe is in contact with the knife set. The electric type soil sampling TRIME pipe mounting machine provided by the invention has the advantages of low construction cost, convenience for carrying and easiness for mounting TRIME; the TRIME pipe mounting efficiency is improved and the problem that the TRIME pipe is difficult to mount, which troubles scientific research personnel for a long period,is solved.
Owner:辽宁省水利水电科学研究院有限责任公司

Installation device and installation method for high temperature gas-cooled reactor containment sealing support

The invention relates to an installation apparatus and installation method for a high-temperature gas cooled reactor safety shell sealing seat, which belongs to the technical field of construction ofnuclear power project. The installation apparatus for a safety shell sealing support disclosed in the invention utilizes an internal space of the structure to avoid the influence of various inner items such as reinforcing steel bars, shielded cooling water pipes, nuclear measurement pores and the like; by virtue of the installation, adjustment and fixation of a fine adjustment mechanism and boltsfor a fixing mechanism, the high precision installation requirement can be met, and the stability and firmness of the sealing support can be ensured not to be disturbed by the later concrete pouring;and a method for installing and adjusting the sealing seat by virtue of parts and blocks is provided, so that the problem that the structure is complicated and the dense reinforcing steel bars are difficult to install can be solved. The installation apparatus and the installation method of the invention are simple in operation, convenient and feasible, the installation quality of the safety shellsealing seat can be ensured, the installation efficiency can be improved, and the installation apparatus and the installation method can be popularized and applied to the installation of large-sized horizontal buried parts in other project fields.
Owner:CHINERGY CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products