Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

44 results about "Total work" patented technology

Work allocation method and work allocation program

To level work volumes among a plurality of target persons.SOLUTION: An information processing device 101, on the basis of a result of allocating work groups prior to work groups to be allocated for a plurality of target persons to which the work groups to be allocated will be allocated, selects a first target person to be an adjustment target of a work volume from the plurality of target persons. On the basis of skill information indicating skills possessed by the selected first target person, the information processing device 101 specifies a first work group that the first target person is to handle from the work groups to be allocated. If a total work volume of the specified first work group exceeds a predetermined allowable value, the information processing device 101 deletes at least some works from the first work group, thereby specifying a second work group corresponding to the first work group but the works deleted. The information processing device 101 fixes allocation of the specified second work group to the first target person, and performs allocation to the remaining target persons other than the first target person of the work groups other than the second work group among the work groups to be allocated.SELECTED DRAWING: Figure 1
Owner:FUJITSU LTD

Content management system and content display method

PCT designated stageWO2025197003A1CommerceDisplay deviceTotal work
This content management system comprises: an acquisition unit (503B) that acquires product identification information of a product to be purchased, and information indicating whether or not additional work is to be performed on the product based on a request from the purchaser of the product; a work time storage unit that stores the product identification information in association with the additional work time required for the additional work; an estimation unit (506B) that estimates a total work time on the basis of the bagging time for bagging the product to be purchased and the additional work time required for the additional work to be performed on the product to be purchased that requires additional work; a storage unit (502B) that stores content and the playback time of the content; an extraction unit (507B) that extracts content corresponding to the total work time from the storage unit; and a content provision unit (508B) that displays, on a display device visible to a customer, the extracted content.
Owner:SHARP NEC DISPLAY SOLUTIONS LTD

Pick-list generating device, and pick-list generating method

PendingJP2025171703AInstrumentsWork performanceTotal work
To provide a pick-list-generating device capable of generating a pick list that does not depend on the ability of a worker.SOLUTION: The pick-list generating device for generating one or more pick lists based on the order of goods includes: a setting unit that receives setting of the shipping date and time for goods; and a generation unit that generates, based on the orders, shipping dates and times, and past work performance, one or more pick lists so that the productivity of one or more pick list items satisfies the specified criteria. The past work performance includes the working time required for workers to pick goods in past picking operations. The pick list specifies the order in which the workers pick the good items. The work productivity means the picking quantity of goods based on the pick-list with respect to the total working time of one or more workers assigned in the pick-list.SELECTED DRAWING: Figure 1
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Automatic control method for edge wave defect of cold continuous rolling steel coil

The application discloses an automatic control method for cutting edge wave defects of a cold continuous rolling steel coil, which comprises the following steps: first, the strip steel of the steel coil is divided into n sections according to the length direction of the steel coil with unit length as the position interval, and the temperature data of the n sections of the strip steel in the hot rolling process are respectively output to form a steel coil hot rolling temperature data set T; then, the total work roll bending force correction set value in the cold continuous rolling process is calculated according to the steel coil hot rolling temperature data set T, and the total work roll bending force correction set value is distributed to the work roll and the intermediate roll; finally, it is judged whether the bending force needs to be compensated in the continuous rolling process, and if the compensation is needed, the bending force compensation is performed; since the application can automatically compensate the bending force set value in the cold continuous rolling process to match the actual rolling force of the hot rolling steel coil, the problem of the cutting edge wave defects can be automatically solved in the whole process, and meanwhile, since no new device is added and only the cold rolling control method is improved, the cost is saved.
Owner:SHANGHAI MEISHAN IRON & STEEL CO LTD

Robot control device, robot control system, robot, and robot control method

A robot control device (11) is provided with: a determining unit (33) for determining the progress status of first work in accordance with a work instruction; a search unit (35) for searching for a partner (17) capable of providing specific information for changing the progress status of the first work to a continuation-possible status if the progress status of the first work is a continuation-not-possible status; an estimating unit (37) for estimating the total work cost including second work for changing the progress status of the first work from the continuation-not-possible status to the continuation-possible status; a plan creating unit (38) for creating a work plan including the second work for the partner (17) on the basis of the estimated total work cost; and a control unit (39) for causing the work including the second work complying with the created work plan to be performed. The plan creating unit (38) creates the work plan so as to minimize the total work cost.
Owner:HITACHI LTD

Cargo containment system dispatching method, medium and terminal

PendingCN121146362AInstrumentsTotal workProcess engineering
The invention provides a cargo containment system dispatching method, a medium and a terminal, and the method comprises the steps: obtaining the information of a cargo containment system cabin, and carrying out the coding of the cargo containment system cabin, so as to divide an operation region; counting the number of the studs in each operation area; according to the number of the studs, the original operation unit, the operation rhythm and the operation grade are determined; determining an operation mode of personnel dispatching based on the operation area, the operation rhythm and the operation grade; and calculating the total operation time length of each operation grade, judging whether the difference value of the total operation time lengths between every two operation grades is within a preset range or not, and if the requirement is not met, repeating the previous step to carry out personnel dispatching again until the requirement is met. By the adoption of the method, the installation preparation project period is shortened, and the construction efficiency is improved.
Owner:JIANGNAN SHIPYARD (GRP) CO LTD

A downtime analysis method, device and equipment

ActiveCN113919755BData processing applicationsDowntimeTotal work
The embodiment of the present invention discloses a downtime analysis method, device and equipment. The method includes: obtaining the downtime of each working equipment and the total working time of each working equipment during the implementation of the project; when each downtime and the total working time meet the preset utilization condition, generating at least one downtime set according to the downtime cause for each downtime; wherein, the downtime causes corresponding to each downtime in the same downtime set are the same; the downtime causes include at least downtime without start-up, downtime due to construction plan, downtime due to external reasons and downtime due to abnormal faults. According to each downtime set and the preset planning value range corresponding to the downtime set, the downtime analysis results corresponding to each downtime set are determined, and the downtime analysis results are integrated to generate a downtime analysis report for the project; the technical solution of the embodiment of the present invention uses time as the resource dimension to measure project efficiency, clarifies the factors affecting efficiency in the project, and improves the overall efficiency of the project.
Owner:BEIJING BO TSING TECH CO LTD

Nuclear power overhaul plan dynamic adjustment method and device

PendingCN122656396ANuclear plantReal-time data
The application discloses a nuclear power overhaul plan dynamic adjustment method and device, characterized in that the method comprises the following steps: step S1, acquiring real-time data of a plurality of production management systems of a nuclear power plant, and combining the real-time data to perceive a real-time state of work; step S2, based on comparison between an overhaul plan and the real-time state, identifying a deviation event of plan execution, and based on the deviation event, estimating total work period delay; step S3, constructing a strategy rule library, wherein the strategy rule library comprises coping strategies for different deviation events; when the total work period delay exceeds a preset threshold, matching a corresponding coping strategy from the strategy rule library, and generating a corresponding adjustment scheme; step S4, based on the adjustment scheme, adjusting the overhaul plan, tracking adjustment effect, and based on effect tracking, optimizing the strategy rule library. The application can perceive plan deviation and automatically generate an adjustment scheme.
Owner:CHINA NUCLEAR POWER OPERATION TECH CORP +1

Maintenance suggestion method, maintenance suggestion system, and maintenance suggestion program

The present invention can flexibly use information such as operation information and suggest a maintenance work device at an appropriate time. The maintenance suggestion method includes: a step (S01) of acquiring operation information indicating a result of measuring an operation parameter as an operation state when a work device (2) works in a field (9); a step (S03) for extracting, for each combination of the type of the work device, the field, the type of the work, and the type of the crop to which the work device performs work in the field, a harsh field on which harsh work satisfying a predetermined harsh condition is performed, on the basis of the operation information and a representative value of the past operation information acquired in the combination, and for each combination of the type of the work device, the field, the type of the work, and the type of the crop to which the work device performs work in the field; and a step (S05) for outputting, for each work device, a maintenance suggestion signal for suggesting maintenance of the work device when a harsh work time indicating the total time for performing work in the harsh field and a total work time, which is the total time for performing work in any field, satisfy a predetermined suggestion condition.
Owner:YANMAR HLDG CO LTD

Intelligent material management method and system

The invention relates to the technical field of material management, and discloses an intelligent material management method and system, and the method comprises the steps: carrying out the partitioning of a material warehouse, obtaining material warehouse regions, distributing a partitioning ID for each material warehouse region, obtaining the path topology of the material warehouse regions, distributing a storage space ID for each storage space in the material warehouse regions based on the partitioning IDs, and obtaining the path topology of the material warehouse regions; binding a material ID for the material when the material is stored in the warehouse position; obtaining a total work order of the batching task, splitting the total work order into subarea sub-work orders of each material warehouse area, and in each material warehouse area, dividing the subarea sub-work orders into task waves by taking time as cost according to the path topology and the warehouse position ID; and obtaining the state and the position of a material taking person, matching the task wave order according to the state and the position of the material taking person, and issuing the task wave order to the material taking person for execution. The method has the comprehensive advantages of low-cost deployment, high compatibility and expandability, and can effectively solve the problems of fixed bin position, low manual material taking efficiency, information isolated island and the like in traditional SMT material management.
Owner:SHANDONG BITTEL INTELLIGENT TECH CO LTD

Early warning analysis method and device for intelligent service hotline work order, equipment and medium

The invention discloses an early warning analysis method and device for an intelligent service hotline work order, equipment and a medium. The method comprises the following steps: acquiring voice content in an intelligent service hotline work order; converting the voice content into characters to obtain a work order to be processed; inputting the work order to be processed into a pre-trained AI large model for classification to obtain different fault types; whether the work order early warning score of a single fault type is an abnormal value or not is judged, or whether the work order early warning total value of all fault types is an abnormal value or not is judged, if the work order early warning score or the work order early warning total value is an abnormal value, early warning is carried out, and therefore early warning analysis of the intelligent service hotline work order is completed. The method is based on the AI large model, and can timely and comprehensively identify and respond to changes of customer demands, thereby effectively performing early warning on the intelligent service hotline work order, and meeting high-standard requirements of modern enterprises on customer services.
Owner:CHINA UNITED NETWORK COMM GRP CO LTD

Method and system for evaluating design workload of nuclear power plant

PendingCN119204806ADrawing from basic elementsNuclear plantTotal work
The invention discloses a method and a system for evaluating the design workload of a nuclear power plant. The method comprises the steps that the total organization work amount and the per capita equivalent workload of an organization in each period are acquired; based on the total organization work amount and the equivalent per capita workload of the organization in multiple continuous cycles, respectively constructing a total organization work amount broken line and an equivalent per capita broken line in a chart form; obtaining the distribution pattern of the total organization work amount broken line and the per capita equivalent broken line in adjacent weeks; and outputting an organization workload evaluation result in the adjacent weeks according to the distribution forms of the organization work total amount broken line and the per capita equivalent broken line in the adjacent weeks and a preset per capita standard workload. According to the method, the design workload of the organization is quantified according to the period, the organization workload state and the organization manpower interference and shortage condition are dynamically analyzed, and a reliable management basis is provided for an organization manager to adjust manpower resource configuration in time.
Owner:CHINA NUCLEAR POWER ENGINEERING COMPANY LTD +1

Power efficiency calculation device, power efficiency calculation method, power efficiency calculation system, and program

A power efficiency calculation device includes a metrics collection unit that collects metrics from a physical server group, a task execution amount normalization unit that determines a normalization coefficient for each task of each application, an importance group setting unit that sets importance groups of each application and each task to determine weights, and a power efficiency calculation unit that normalizes a task execution amount using the normalization coefficient, calculates a total work output by using the normalized task execution amount and the weight of the importance group of the application and the task, and calculates power efficiency.
Owner:NT T INC

Method and machine for making a coil around a component of an article

ActiveUS12476044B2Coils manufactureWork cycleTotal work
Method and machine to manufacture a coil around a component of an article includes a main conveyor that moves along a working path and a carriage with a seat to house the component. Along the working path, the component is arranged in the seat of the carriage in an input station, and at a winding station, a wire having a diameter less than 500 μm is directly wound around the component for a winding time ranging from 50% to 70% of the total work cycle, to obtain the coil with a number of turns less than 50. A work cycle lasts from an initial instant, in which the carriage carrying the component without the coil reaches the winding station, to a final instant, in which the carriage carrying the component with the coil leaves the winding station.
Owner:GD SPA

Work analysis device

To provide a work analysis device capable of reducing the burden on a user to check work status by checking multiple tasks that seem inefficient at once, and / or checking multiple tasks with different efficiencies at once, and a work analysis method.SOLUTION: A work analysis device includes: a video acquisition unit that acquires video of footage of a specific task being performed multiple times by a worker; a work breakdown unit that calculates the total work time required for each task and non-work time during which no work was actually performed based on the video; a decomposition result display unit that plots the work on a coordinate plane with total work time and non-work time as the axes, and displays marks; a mark selection unit that selects a mark arbitrarily from the displayed marks based on the operation by the user; and a video display unit that displays the video of the work corresponding to the selected mark.SELECTED DRAWING: Figure 6
Owner:PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO LTD

Scheduling weighted total work loss minimization method for serial batch processor

The invention discloses a method for minimizing the scheduling weighted total error work loss of a serial batch processor, and belongs to the field of production plan scheduling theories and optimizing.The method comprises the steps that the prepreg cutting process is described as the scheduling problem of the serial batch processor, and an optimization model for minimizing the weighted total error work loss on the serial batch processor is established; and solving the optimization problem of the minimum weighted total work loss on the serial batch processing machine according to the work condition to obtain a work processing scheme, so as to improve the prepreg utilization rate and the production scheduling level in aviation composite material manufacturing while the optimization model can meet the production requirement by accurately arranging the work batch and the processing sequence, and improve the production efficiency. The problems that a traditional production scheduling method is low in processing efficiency, insufficient in prepreg utilization rate and the like are solved.
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Method for determining target pre-broadcasting station, and method and device for sub-packaging target accessories

The embodiment of the invention provides a target pre-broadcasting station determining method and a target accessory split charging method and device, and belongs to the technical field of split charging outside a main assembly line. The determination method comprises the following steps: determining the total assembly time of a plurality of equipment main bodies according to the equipment type of each equipment main body in the plurality of equipment main bodies on a main assembly line; according to the total assembly time, the historical assembly time, the arrangement sequence of the multiple equipment main bodies and the advancing speed of the main assembly line, the pre-assembly time in advance is determined; and determining a target pre-broadcast station according to the pre-installation time in advance. According to the flexible pre-sowing station determined by the method, the most preferential sub-packaging product which is comprehensively output from three elements including the pre-packaging time, the engine in-process position and the total product sub-packaging working hour can be output, the problem of unbalanced labor use caused by off-line sub-packaging of parts in a multi-variety and small-batch flexible assembly line is solved, and optimization of the working hour of a manufacturing system is achieved. Therefore, working hour output of sub-packaging operators is balanced to the maximum extent, and cost reduction and benefit increase of the whole line are achieved.
Owner:BEIJING FOTON CUMMINS ENGINE

Graphical user interface for displaying work order accounting details on mobile phones

ActiveCN309043791SGraphical user interfaceTotal work
1. The name of the product of this design: Graphical user interface for displaying work order accounting details on a mobile phone. 2. Purpose of this design product: used for running mobile phone programs. 3. The design highlights of this appearance design product lie in the graphical user interface content on the product screen. 4. The picture or photo that best illustrates the design points: changing state diagram. 5. The mobile phone is of existing design, and the rear view, left view, right view, top view and bottom view are omitted. 6.Purpose of Graphical User Interface: It is used for users to record work orders and display detailed information. 7. Description of the changing status of the graphical user interface: The current date, total working hours and estimated amount are displayed at the top of the main view. The middle part of the page displays the daily work order flow information (including the name of the work item and the specific working hours) from recent to far in order of date. There are 3 menu buttons at the bottom of the page (flow, "+", calendar). Click on any work order flow in the main view, and the page will jump to the change status diagram. The top of the change status diagram shows the working hours and accounting amount, the middle part is the detailed information of the flow (including the work order recording date, project, work content, price, pictures, notes, voice records), and below are the "Delete" and "Edit" operation buttons; users can view and process the detailed information of a single work order. 8. Other situations that require explanation Other explanations: The letter "X" in the view indicates changeable or replaceable text / data content.
Owner:TECHNOLOGY (CHENGDU) CO LTD

Sewing management system

An operator's work efficiency can be evaluated. A sewing management system (1) has a sewing machine (2) and a management device (3), the management device (3) having: a calculation section (13) that calculates an overall efficiency of an operator using the sewing machine; and an information acquisition section (11) that acquires operation information (151) from the sewing machine in order to calculate the overall efficiency, the operation information including information for acquiring a start time and an end time of a sewing work performed by the operator using the sewing machine, a total work time for a plurality of work processes included in the sewing work, and an actual piece count for each work process, the calculation section calculating the overall efficiency of the operator based on a target processing time determined for each work process and the operation information acquired by the information acquisition section. In addition, the calculation section (13) can also calculate a process efficiency for each work process and evaluate the efficiency by process.
Owner:JUKI CORP

Method and apparatus for determining production calendar, electronic device, and storage medium

PendingCN122288147Aaccurate schedulingProduction lineTotal work
This disclosure relates to a method, apparatus, electronic device, and storage medium for determining a production calendar. The method for determining a production calendar includes: acquiring target resources required to produce a target product during a target time period; determining a target production line corresponding to the target resources and determining a first working duration, the first working duration representing the time required for the target production line to produce the target resources within the target time period; determining a production calendar matching the first working duration as an initial production calendar; determining time-influencing factors corresponding to the production of the target resources by the target production line within the first working duration, and determining the capacity loss duration corresponding to the target production line based on the time-influencing factors; adjusting the daily working durations recorded in the initial production calendar so that a second working duration obtained after adjusting the daily working duration becomes the first working duration, thereby obtaining a target production calendar, where the second working duration is the difference between the total working duration and the capacity loss duration of the initial production calendar. This disclosure improves the accuracy of the production calendar.
Owner:BEIJING XIAOMI MOBILE SOFTWARE CO LTD

Method and device for generating working calendar and storage medium

The invention relates to the technical field of the production and manufacturing industry, in particular to a method and device for generating a working calendar and a storage medium. Comprising the steps of obtaining an initial working calendar of each date in a preset future duration; determining a predicted completion time intercept point of an uncompleted order, and determining a to-be-adjusted date; adjusting the initial working calendar according to the type of each to-be-adjusted date to obtain a first working calendar of each to-be-adjusted date; determining a target duration required by the updated uncompleted order; determining the total working duration and the total rest duration in all the first working calendars; determining dates to be selected; according to the method, the final working calendar of each to-be-selected date and the final working calendars of other to-be-adjusted dates except the to-be-selected date are determined, the working calendar of each day can be adaptively generated or updated, the working calendar updating mode is more flexible, higher practicability is achieved, artificially generated errors are reduced, and the actual production situation is better met.
Owner:ZHONGKE YUNGU TECH

Crane load spectrum compiling method, computing device and computer readable storage medium

The application discloses a crane load spectrum compiling method, a computing device and a readable storage medium. The method comprises the following steps: acquiring hoisting data of a preset number of target cranes in at least one working condition within a preset time length; analyzing the hoisting data to obtain the number of each type of work cycle contained in each working condition; the work cycle refers to the process from starting to hoist an article to starting to hoist the next article; screening each type of work cycle according to the number, and determining the occurrence probability of at least one target type of work cycle obtained after the screening; determining the occurrence number of each target type of work cycle in the life cycle of the target crane according to the total work cycle number of the target crane in the life cycle and the occurrence probability; and determining the load spectrum of the target crane based on the occurrence number. In this way, the crane load spectrum can be conveniently compiled, and the compiling efficiency and applicability of the crane load spectrum are improved.
Owner:ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO LTD

Method and device for determining workload of sailor and electronic equipment

The invention discloses a crew workload determination method and device and electronic equipment, and belongs to the technical field of ship control. The method comprises the steps of obtaining an operation task of a ship; according to a task process of the job task, identifying associated information and hierarchical information of a task link in the job task, and decomposing the job task into a plurality of sub-tasks; according to the working environment and the task complexity of the subtask, determining an evaluation standard of the subtask; evaluating the task load component of each sailor in the ship for each sub-task according to the task property and the task requirement of the sub-task and the evaluation standard; and obtaining the total workload of the sailors executing the operation task according to the task load component and the cooperative relationship network between the sailors. The method can accurately evaluate the workload of the crew.
Owner:CHINA STATE SHIPBUILDING CORP LTD RESEARCH INSTITUTE 719

Nuclear power overhaul work order combination query management and control system and method

The invention relates to the technical field of nuclear power overhaul, and provides a nuclear power overhaul work order combination query management and control system and method, and the system comprises a data obtaining module which is used for obtaining the total work order task number of a certain overhaul and the basic elements of each work order; the query condition setting module is used for presetting or freely combining various query conditions; the data storage module is used for storing combination conditions of free query; the method comprises the steps of setting a query condition, storing and quickly calling the query condition, reading a query result, and pushing the query result. According to the method, the execution condition of the overhaul work order can be conveniently counted, the time is saved, the personnel error risk caused by personal skills is reduced, the accuracy of a statistical result is improved, real-time display is realized, repeated work is reduced, and the working efficiency is improved.
Owner:CNNC NUCLEAR POWER OPERATION MANAGEMENT CO LTD

Robot system

To provide a robot system allowed to reduce the total work time for sorting objects.SOLUTION: A robot system 100 comprises a conveyor 10 that carries objects W, a plurality of carriages 20 that are arranged in a particular state to load / receive objects W, and a robot 30 that loads the object W from the conveyor 10 onto any of the plurality of carriages 20 arranged in the particular state.SELECTED DRAWING: Figure 3
Owner:KAWASAKI JUKOGYO KK

Work recording performance verification method and system for task construction period overlapping

The invention provides a work recording performance verification method and system for task construction period overlapping. The method comprises the steps that a newly-added work recording order of a target worker and an associated work recording order associated with the newly-added work recording order are acquired; determining a work recording period group based on the first work recording period of the newly added work recording order and the second work recording period of the associated work recording order; obtaining daily total work recording performance and daily total work recording time in the work recording period group; acquiring an hour performance work-recording upper limit and a daily performance work-recording upper limit; performing hour performance pre-verification based on the hour performance work recording upper limit, the daily total work recording performance and the daily total work recording time; and performing daily performance verification based on the daily performance work-recording upper limit and the daily total work-recording performance when the verification result of the daily performance pre-verification is passed. The system comprises a first acquisition module, a determination module, a second acquisition module, a third acquisition module, a first verification module and a second verification module.
Owner:TECHNOLOGY (CHENGDU) CO LTD

Graphical user interface for adding work order flow on mobile phone

ActiveCN309043790SGraphical user interfaceTotal work
1. The name of the product of this design: A graphical user interface for adding work order flow to a mobile phone. 2. Purpose of this design product: used for running mobile phone programs. 3. The design highlights of this appearance design product lie in the graphical user interface content on the product screen. 4. The picture or photo that best illustrates the key points of the design: main view. 5. The mobile phone is of existing design, and the rear view, left view, right view, top view and bottom view are omitted. 6. Purpose of the graphical user interface: used for workers to add work information, record construction accounts, etc. 7. Description of the changing status of the graphical user interface: The current date, total working hours and estimated amount are displayed at the top of the main view. The middle part of the page displays the daily work order flow information (including the name of the work item and the specific working hours) from recent to far in order of date. There are 3 menu buttons at the bottom of the page (flow, "+", calendar). Click the "+" button below the main view, and the page will jump to the change status diagram. The top of the change status diagram is the classification menu of the work order and the current date, and the bottom is the filling area for specific work content, working hours, amount, remarks, etc. Users can fill in the records according to their own work situation. 8. Other situations that require explanation Other explanations: The letter "X" in the view indicates changeable or replaceable text / data content.
Owner:TECHNOLOGY (CHENGDU) CO LTD

Method, device and equipment for evaluating operation and maintenance work saturation and medium

The invention discloses an operation and maintenance work saturation evaluation method and device, equipment and a medium, and relates to the technical field of operation and maintenance management, and the method comprises the steps: obtaining daily report data of a target operation and maintenance worker in a single-day operation and maintenance period, and the daily report data at least comprises an operation and maintenance action type, a shop address and an equipment state corresponding to each operation shop; predicting the operation and maintenance time consumption of the target operation and maintenance personnel in each operation shop according to the operation and maintenance action type and the equipment state, and determining the travel time consumption between any adjacent operation shops according to the shop address; accumulating the operation and maintenance time consumption and the travel time consumption to obtain the total working time length of the target operation and maintenance personnel in the single-day operation and maintenance period; and evaluating the operation and maintenance work saturation of the target operation and maintenance personnel according to the total working time length to obtain a saturation evaluation result. According to the method, the number of operation and maintenance actions, the spatial distribution of operation and maintenance work and the actual time consumption difference are concerned at the same time, and the actual workload and saturation of operation and maintenance personnel can be accurately quantified.
Owner:成都安易迅科技有限公司

Scheduling with support for multiple scheduling objectives

A system for generating task schedules using an electronic device includes: a processor, the processor comprising neural networks; a memory coupled to the processor; a scheduler coupled to the processor, the scheduler is configured to: receive: a total work database configured to contain items representing work packages; a resources database configured to contain items representing resources required to fulfill items in the work packages; a constraints database configured to contain items representing constraints to fulfilling items in the work packages; and a scheduling objective database configured to designate a prime objective that is to be achieved by the optimum task schedule; provide a trained reinforcement learning engine for optimizing the task schedule based on inputs from the databases; and generate an optimum work package schedule to sequence the work packages using the trained reinforcement learning engine, wherein the optimum work package schedule maximizes the one or more prime objectives.
Owner:HEXAGON TECH CENT GMBH

Die manufacturing capacity planning method and system

The invention discloses a mold manufacturing capacity planning method and system, and solves the technical problems of high cost, low efficiency, inaccurate result and the like caused by manual capacity estimation in the prior art. The productivity planning method comprises the following steps: obtaining the type and the number of to-be-manufactured molds in a specified time period; according to the working procedures and working hours corresponding to the known mold types, determining the total working hours of each working procedure required by all the molds to be manufactured as the working procedure required capacity; obtaining the theoretical total working hours of the equipment in the manufacturing plant in each process in the specified time period as the theoretical productivity of the process; and carrying out capacity planning at least according to the process demand capacity and the process theoretical capacity.
Owner:QINGDAO HAIER MOLDS