Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

211 results about "Total work" patented technology

Electric cooker and heating control method thereof

ActiveCN101518409AAccurately judge the serving sizeAccurately judge the statusTemperatue controlTime-controlled ignitorsElectricityPortion size
The invention belongs to the field of household appliances, and in particular relates to an electric cooker and a heating control method thereof. The electric cooker comprises a pot body, a pot cover, an inner pot and a heater arranged under the inner pot; the inside of the pot body is provided with a control part and a temperature sensor; the control part comprises a main controller, a first timer, a second timer, a temperature incremental memory and a total working time memory; and the main controller is electrically connected with the heater, the temperature sensor, the first timer, the second timer, the temperature incremental memory and the total working time memory respectively. The heating control method comprises a preheating stage A and a heating and temperature rising stage B; and in the heating and temperature rising stage B, the main controller controls the heater to continue heating or to finish the heating and temperature rising stage B according to an inner pot temperature increment delta T correspondingly generated in a unit time delta t timed by the second timer, a temperature increment preset in the temperature incremental memory, a total working time t timed by the first timer and a total working time preset in the total working time memory. The method can accurately judge the quantity and boiling state of food in the cooker, has the advantages of simple control and low cost, and is suitable for various electric stewpots and ceramic pots with separated upper covers.
Owner:MIDEA GRP CO LTD

Predicting method for steam turbine high temperature component creep life

ActiveCN101038248ARealize online real-time computingRealize online real-time predictionMaterial strength using tensile/compressive forcesSpecial data processing applicationsPredictive methodsTotal work
The present invention relates to a creep life prediction system of steam turbine high-temperature parts. Said system is characterized in that it consists of calculation/application server and software for a creep life prediction, a data base server, outer system interfaces, temperature monitoring thermocouples of each high-temperature parts, a homepage server and an user end web browser, wherein the homepage server is connected respectively to the calculation/application server, the data base server and the user end web browser, the calculation/application server is connected to the data base server, the data base server is connected respectively to each temperature monitoring thermocouple of each high-temperature parts through the outer system interfaces. The prediction method comprises the following steps: inputting basic data; calculating the number of the accumulative total working hours of each temperature section; calculating the creep life loss Eti of each temperature section; calculating the accumulative total creep life loss Et; ascertaining a threshold value DC of the accumulative total creep life loss; calculating the creep life loss velocity e; calculating the residual creep life HLC; and recommending maintenance and treatment measures. The advantage of the present invention is that the residual creep life of a steam turbine high-temperature part is capable of being predicted quantificationally during the using stage of a steam turbine.
Owner:SHANGHAI POWER EQUIP RES INST

Radio frequency magnetron sputtering method to prepare superhard TiB2/TiAIN nano multilayer film

The invention relates to a radio frequency magnetron sputtering method to prepare superhard TiB2 / TiAIN nano-multilayers. By adopting the radio frequency magnetron sputtering technology, a radio-frequency power supply is used to excite plasma to sputter TiB2 and TiAI ceramic targets. Multilayers of TiB2 and TiAIN are deposited on a one-side polished Si (100) substrate. A mechanical pump and a molecular pump are adopted to pump the air pressure in a vacuum chamber to 3.0X10<-4> Pa to 1.0X10<-4> Pa. When TiB2 is deposited, pure argon gas is sputtered. The flow of argon gas is controlled with a mass flow controller, and is kept to be 4sccm to 60sccm. When TiAIN is deposited, argon gas and nitrogen gas are sputtered; and the ratio of nitrogen gas to argon gas is changed from 1:1 to 1:50. During the complete deposition process, the total working air pressure is: 0.1 Pa to 0.8 Pa when TiB2 is deposited; 0.2 Pa to 1.0 Pa when TiAIN is deposited. The cycle of the multi-layers is 30 layers to 200 layers. The novel superhard TiB2 / TiAIN nano-multilayers have the overall characteristics of high hardness, low internal stress, high binding force of the layer base. The novel superhard TiB2 / TiAIN nano-multilayers have important application prospects in reinforced films on the surface of knife edges and moulds.
Owner:TIANJIN NORMAL UNIVERSITY

Radio altimeter signal simulation system

ActiveCN105333887AFlexible and realisticFlexible functionMeasurement devicesReal-time simulationMathematical simulation
The invention relates to a radio altimeter signal simulation system. The radio altimeter signal simulation system comprises a mathematical simulation calculation subsystem used for simulation to generate a model database required by simulation conditions and realizing conversion and management of the model database, and control and treatment of simulation process; an echo simulation subsystem which is connected with the mathematical simulation calculation subsystem, and is used for receiving model data and control instructions, and realizing conversion and output of model data into intermediate frequency signals; an altimeter equivalent unit which is connected with the echo simulation subsystem and the mathematical simulation calculation subsystem, and is used for simulating an actual altimeter, evaluating simulation capacity of the radio altimeter signal simulation system, and realizing retroconversion of signals into height values. The radio altimeter signal simulation system has flexible, economical, lifelike, and complex function simulation capacity, is capable of realizing real-time simulation operation and experimental verification of radio altimeters on total work environment, and is capable of providing support for testing experiments and performance evaluation of radio altimeters, and especially navigation control systems.
Owner:SHANGHAI RADIO EQUIP RES INST

Project research and development process management method and device, apparatus and computer storage medium

PendingCN110309975AAccurately predict completion trendsAccurately predict R&D workloadForecastingOffice automationTotal workSoftware engineering
The invention relates to the technical field of finance technology, and discloses a project research and development process management method, which comprises the following steps of recording the actual working hours consumed by the development of each functional point during a software project research and development process through a preset timer; counting the actual working hours at the preset time intervals to obtain the actual total working hours corresponding to the software project; determining the actual workload remaining of the software project according to the actual total workinghours, and drawing an actual workload remaining curve on a preset burn-off diagram template according to the actual workload remaining; and when a project evaluation request is received, outputting the software project research and development evaluation information according to the actual workload remaining curve. The invention further discloses a project research and development process management device, an apparatus and a computer readable storage medium. According to the present invention, the burnout chart is generated by accurately counting the actual working hours during the softwareproject research and development process, so that the project research and development workload is accurately evaluated, and the software development efficiency is improved.
Owner:WEBANK (CHINA)

Axial flow compressor surge boundary measurement system

The invention discloses an axial flow compressor surge boundary measurement system. Aiming at an axial flow compressor installed in a wind tunnel major loop, by means of the system, the accurate measurement for a surge boundary of the axial flow compressor can be achieved, and it is sufficiently guaranteed that the surge boundary is applicable to future testing conditions of a wind tunnel, and the monitoring is facilitated. According to the method of the system, the measurement process is safe and reliable, and the surge boundary obtained through measurement is accurate; compared with domestic existing continuous type wind tunnel compressor surge boundary measurement methods, the method of the system is simpler, more accurate, safer and more reliable, and the result application is more convenient. The surge boundary measured by means of the axial flow compressor surge boundary measurement system is a smooth curve and conforms to performance characteristics of the axial flow compressor, the line type is simpler, the application is more convenient and faster, and the anti-surge program design and personnel monitoring are facilitated to a greater extent; the system particularly aims at new requirements for conducting measurement at different total pressure, at different stationary blade angles and under the condition to adjust the speed continuously within a total working revolving speed range.
Owner:INST OF HIGH SPEED AERODYNAMICS OF CHINA AERODYNAMICS RES & DEV CENT

Spare part demand predicting method based on state monitoring and reliability of equipment part

The invention relates to a spare part demand predicting method based on state monitoring and reliability of an equipment part and belongs to the technical field of mechanical manufacturing. The method includes the following steps that firstly, according to a maintenance record list of equipment, the reliability theory is used for processing burn-out life data of parts in the maintenance record with the reliability theory, and the probability cumulative distribution function of the burn-out life of the parts is obtained; the probability cumulative distribution function of the burn-out life of the parts, the total working time of the equipment, the history record of the real spare part demand quantity, the year-to-year value record and the month-to-month value record of the spare part demand quantity, the experience predicting values of planners and the like are compared with errors, used for comparison predicting, of the real spare part demand quantity so as to obtain the predicting value of the demand quantity of equipment spare parts. According to the method, the prediction result of the method has the practical bases, the inactive stock of an enterprise can be effectively reduced, resource waste is reduced, cost is reduced and the method has good adaptability to different spare parts which are prone to damage.
Owner:TSINGHUA UNIV

Roof parapet flashing place structure and construction method thereof

InactiveCN102852290ASolve the common quality problems that are easy to crackAvoid crackingRoof covering using slabs/sheetsBuild-up roofsEavesTotal work
The invention provides a roof parapet flashing place structure and a construction method of the roof parapet flashing place structure. The structure is arranged below a dripping eave of a parapet and a connecting part between the parapet and a roof finished surface. The structure comprises a separation joint on a roof finished face which is 200-300mm far away from the parapet, sealant embedded in the separation joint, a C20 fine stone concrete filleted corner arranged between the sealant and the parapet, a zinc-plated steel wire net which is fully hung and fixed on a circular-arc-shaped surface of the C20 fine stone concrete filleted corner through a heat-preservation nail, a waterproof mortar layer brushed on the zinc-plated steel wire net, and a felt and two types of oil are paved on the waterproof mortar layer. According to the roof parapet flashing place structure and the construction method of the roof parapet flashing place structure, the quality problem that a roof parapet flashing place easily cracks is solved; and the roof parapet flashing place structure has an anti-cracking function, not only has good whole vertical face effect and good quality, but also has the characteristics of high construction speed and capability of shortening an engineering total work period.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Multi-frequency division pulse width modulation control circuit for high-power laser power supply

The invention discloses a multi-frequency division pulse width modulation control circuit for a high-power laser power supply; the circuit comprises a PWM (Pulse Width Modulation) signal generator for controlling a group of in-parallel power switching tubes to provide power for high-power laser discharge, and at least three frequency division circuits composed of cascaded counters and decoders, wherein the input ends of the counters are connected with the output end of the PWM signal generator; the output ends of the decoders and the output end of the PWM signal generator are simultaneously connected with a group of in-parallel gate circuits; and each output end of the group of in-parallel gate circuits is connected with the control ends of the group of in-parallel power switching tubes respectively and correspondingly to form at least three frequency division PWM control circuits. The multi-frequency division pulse width modulation control circuit not only can reduce working frequency of single power switching tube and improve total working switching frequency of a power supply, power conversion efficiency and stability, but also can reduce temperature of radiating fins and volume of the power supply, and effectively solves the current-sharing problem among the plurality of power switching tubes. Therefore, the control circuit is applicable to the high-power laser power supply more than 12 KW.
Owner:UNITED WINNERS LASER CO LTD

Display panel driving method and display panel

The invention discloses a display panel driving method and a display panel. The method comprises the following steps: grouping shifting registers in a grid driving circuit, setting different frame starting signal terminals and different clock control signal terminals for the groups of shifting registers so as to control the working states of the groups of shifting registers at different frame display times; at first display frequency, controlling all of the groups of shifting registers to work for one time according to the sequence of the groups of shifting registers within each frame of scanning time to display an image, and inputting column overturning display signals with lower power consumption to data lines at this time to realize a point overturning display effect; and at second display frequency subjected to frequency reduction compared with the first display frequency, scanning all grid lines for one time within multiple frames of continuous scanning times according to the frequency reduction fold and the number of the groups of shifting registers so as to display an image. The number of display signals located by the data lines within each frame of scanning time is reduced, the times of negative and positive polarity switch of the display signals are reduced, and the power consumption is reduced.
Owner:XIAMEN TIANMA MICRO ELECTRONICS

Automatic power distribution method for charging pile based on linked list

The invention relates to an automatic power distribution method for a charging pile based on a linked list, and the method comprises the steps: putting all charging modules in the charging pile into an idle charging module linked list, and calculating the total working duration and total working frequency of each charging module before the charging pile receives a start-up instruction; performingsorting according to an ascending order mode of the total working duration values to obtain a charging module sequence sorted based on the working duration, performing sorting of the charging module sequence again according to an ascending order mode of the total number of working times to obtain a charging module sequence sorted based on the number of working times, and taking the charging modulelocated at the foremost end in the current charging module sequence as an optimal charging module to charge the charging module outwards; after the optimal charging module is closed, respectively updating and accumulating the working conditions of the optimal charging module, and switching to the next automatic power distribution. Therefore, the total working duration and the total working timesinfluencing the efficiency and the service life of the charging modules are fully considered, so that each charging module is reasonably utilized, and the failure rate is reduced.
Owner:NINGBO SANXING INTELLIGENT ELECTRIC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products