This application relates to the field of
geotechnical engineering technology, and in particular to a pre-construction curtain grouting technology for bridge
pile foundations in
karst areas. It aims to solve the problems of hole collapse,
grout leakage, and
pile breakage during
pile foundation construction in
karst regions. The technology includes: construction preparation, positioning and installation of casing, staggered drilling, secondary high-pressure fracture cleaning after hole formation, hole inspection, installation of grouting pipes and preparation of
grout, segmented grouting using a method of grouting from the outside in, from large to small, and from lower to upper
layers, hole sealing, and pile foundation drilling after the grouting effect is verified to be satisfactory. This invention uses curtain grouting to consolidate the
karst mass before pile foundation construction, avoiding the
impact of karst geological seepage on pile foundation construction. It establishes curtain grouting and pile foundation drilling as a complete closed-loop process, realizing a shift from
passive treatment to active prevention of karst geology, significantly improving the one-time hole
formation rate and pile quality, shortening the construction cycle, and reducing construction costs.