The invention provides a concrete beforehand pore-forming static breaking technology. A plurality of containers with a certain sizes, shapes and amounts are embedded in a concrete member before the concrete is cast, a plurality of orifices are arranged above the containers, the inner diameters of the orifices are less than the inner diameters of the containers, and the orifices are extended to the edge of the concrete member. When the concrete member needs to be disassembled, the expanding agent is filled into the containers along with the orifices, the expanding agent is chemically reacted in the containers to generate the expansibility, the concrete member is expanded to be broken, and the whole process is free of noise, vibration and slungshots. Compared with the normal pore-forming type static breaking technology, the expansibility is larger, the expanding agent can be effectively avoided to be sprayed out of the orifices, and the construction is safe and environment-friendly; and the drilling working capacity is eliminated, so that the cost can be reduced, and the disassembly construction period can be shortened, therefore, the technology is suitable for the static breaking of engineering temporary facilities.