Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

45results about How to "Realize Distributed Computing" patented technology

Flexible direct-current transmission real-time simulation system and simulation method thereof

The invention relates to a flexible direct-current transmission real-time simulation system and a simulation method thereof. The flexible direct-current transmission real-time simulation system comprises a real-time simulation platform, an A-set device and a B-set device. The A-set device comprises an A-set valve control device, an A-set valve control signal conversion device, an A-set converter valve control device, an A-set station control device, an A-set direct-current protection device, an A-set direct-current measurement and control device, an A-set alternating-current measurement and control device and a centralized wave recording device, wherein the real-time simulation platform is connected with the A-set valve control device through the A-set valve control signal conversion device, the A-set valve control device is connected with the A-set converter valve control device, the A-set converter valve control device is connected with the A-set station control device, and the real-time simulation platform is respectively connected with the A-set direct-current protection device, the A-set direct-current measurement and control device and the A-set alternating-current measurement and control device through a signal interface screen and connected with the centralized wave recording device. The B-set device and the A-set device are the same in composition and connected relation of the devices. According to the flexible direct-current transmission real-time simulation system, the steady state and transient characteristics of the flexible direct-current system can be precisely simulated.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1

Dose distribution simulating method for nuclear installation decommissioning radiation field

The invention provides a dose distribution simulating method for a nuclear installation decommissioning radiation field. The method comprises the steps that firstly, the geometrical information, which needs to be simulated in a nuclear installation decommissioning scene, of the radiation field, the position of a radiation source and the geometrical information of a shielding object are determined; secondly, according to the position of the radiation source and the position of the shielding object, a dose monitoring point distributing network is built and used for extracting sample data; thirdly, according to whether there is the shielding object in the radiation field or not, dose distribution calculation is divided into partitioned dose calculation and non-partitioned dose calculation; fourthly, according to the sample data, a radial basis neural network model is built; fifthly, the dose value of any one point is calculated through an inverse distance weighted method; sixthly, the dose distribution of the radiation field is calculated. By means of the dose distribution simulating method, no radiation source term models are needed, the dose distribution of the radiation field is calculated by depending on a small amount of dose monitoring points, and the steps are simpler. By means of the dose distribution simulating method, the calculation of the dose distribution of the radiation field affecting the shielding effect is achieved.
Owner:HARBIN ENG UNIV

Power station boiler combustion modeling and optimization method facing mass high-dimensional data

InactiveCN108038306AFreedom from Computing and Storage CapabilitiesGood trainingData processing applicationsDesign optimisation/simulationBoiler efficiencyPower station
The invention discloses a power station boiler combustion modeling and optimization method facing mass high-dimensional data, belongs to the field of power station boiler optimization running and particularly relates to the power station boiler combustion modeling and optimization method facing the mass high-dimensional data. The method comprises the following steps that 1, input data and output data are extracted from history running data of a power plant distributed control system and subjected to data processing; 2, the NOx emission amount is modeled to a boiler combustion emission model byusing an improved distributed extreme learning machine, and the boiler efficiency is modeled to a boiler combustion efficiency model; 3, the boiler combustion emission model and the boiler combustionefficiency model are combined, and a multi-target boiler combustion model is established; 4, the multi-target boiler combustion model is converted to a single-target boiler combustion model by adopting a weight coefficient method; 5, the single-target boiler combustion model is subjected to parameter optimization by using a distributed particle swarm algorithm, and optimization control over the boiler combustion process is achieved.
Owner:TAIYUAN UNIV OF TECH

Real-time efficient distributed virtual-real combination simulation system and construction method

The invention provides a real-time efficient distributed virtual-real combination simulation system, which comprises a front-end simulation device used for constructing one or more environments including but not limited to a simulation design environment, a simulation operation management environment and a virtual experiment environment; a distributed server cluster, the load balancing device selecting a distributed server to receive the simulation task. The distributed server comprises a simulation deployment unit, a model calling unit and a simulation model unit which are connected with thesimulation soft bus. The model calling unit and the simulation model unit are respectively connected with the simulation soft bus and used for calling an API function, and the simulation deployment unit distributes simulation tasks to the model calling unit and the simulation model unit for processing. According to the method, different simulation task concurrence documents can be established formultiple users based on a design environment, and distributed computing, multi-node interconnection and interaction can be realized through the established simulation soft bus. And parallel synchronous calculation can be realized through an engine in the simulation calling unit.
Owner:中国人民解放军海军航空大学航空作战勤务学院

Transmission network-distribution network joint fault analysis method based on improved node method

The invention relates to a transmission network-distribution network joint fault analysis method based on an improved node method. The fault analysis method comprises the steps that 1) electrical parameters of a transmission device are acquired, and electrical parameters and control parameters of direct current transmission, a direct current power supply and a distributed power supply are acquired; (2) a coordination transmission network-distribution network is decomposed; (3) a phase sequence hybrid network is established; (4) a disconnection line of a vertical fault line is replaced by a constant current source branch with the current of 0, and a constant voltage branch with the voltage of 0 is added to a short circuit node of a crosswise fault line; (5) a transmission network and a distribution network are respectively modeled, and current and voltage electrical parameters of a failed network are calculated; and (6) a node voltage error is calculated, and if the error is greater than 10-8.p.u., returning to step (5) is carried out for recalculating. According to the technical scheme of the invention, by studying the mutual influence of the fault calculation of the transmission and distribution network, a phase sequence hybrid circuit is processed; and non-linear characteristics under various faults are analyzed.
Owner:CHINA ELECTRIC POWER RES INST +1

Tower bolt state monitoring method and device based on stack type support vector machine

The invention discloses a tower bolt state monitoring method and device based on a stack type support vector machine. The tower bolt state monitoring method comprises the steps: collecting and preprocessing a vibration data set; carrying out wavelet transformation on the preprocessed data to construct a feature vector; training an adversarial support vector machine A-SVM by using the feature vector; training a stack type support vector machine S-SVM; and utilizing the trained stack type support vector machine model to realize automatic monitoring of the tower state. The tower bolt state monitoring device is characterized in that the input end of an AD acquisition module is connected with a vibration speed sensor; the output end of the AD acquisition module is connected with an FPGA; the FPGA is connected with a GPRS module and an up2 development board; the up2 development board sends a control instruction to a control relay module, and the output end of the control relay module is connected with the vibration speed sensor; and the GPRS module communicates with a far-end upper computer. According to the tower bolt state monitoring method and device, the safety state of the tower canbe monitored, and accidents caused by bolt loosening of the tower are reduced, and safe and stable operation of the power tower and a power transmission line is guaranteed.
Owner:NORTHEASTERN UNIV

Remote control analysis equipment for water turbine generator set and analysis method thereof

The invention discloses remote control analysis equipment for a water turbine generator set. The equipment comprises two supporting plates, wherein notches are formed in the supporting plates, two supporting pieces are fixed at the upper ends of the supporting plates, the two supporting pieces are respectively positioned at two sides of the notches, a transverse plate is fixed at the upper ends ofthe two supporting pieces together, an oil cylinder is fixed at the lower end of the transverse plate, and the oil cylinder is positioned in the notches. The invention also provides a remote controlanalysis method of the water turbine generator set. According to the remote control analysis equipment for the water turbine generator set, the functions of remote state monitoring, remote fault diagnosis, remote operation guarantee, power generation production data analysis and equipment operation monitoring of the new energy generator set are realized, the intelligent optimization capability ofthe equipment operation parameters is improved, the safety and reliability of the equipment are improved, the intelligent degree of the generator set is improved, the maintenance cost of the equipmentis reduced, the market competitiveness of enterprises is finally improved, the wind power operation level is improved, and a traditional mode is promoted to be converted into an intelligent mode.
Owner:天津天发总厂机电设备有限公司

Real-time charging management method and system for cloud resources

The invention relates to a real-time charging management method and system for cloud resources, the method comprises a data acquisition and cleaning step, a ticket uploading step, a distributed statistics step, a data storage step and a charging display step. The ticket uploading step comprises the step of generating a ticket according to cleaned cloud resource use data; the distributed statistics step comprises the steps of storing the ticket and extracting billing data of the ticket, the billing data is divided into a key unit and a value taking unit, the key unit comprises a tenant UUID to which a cloud server belongs, a cloud service type and a cloud resource type, and the value taking unit comprises the number of virtual CPUs, the number of virtual memories, the type of a disk, the size of the disk and the use duration; and according to the billing data, billing data with the same key unit are selected in a distributed manner, calculation is carried out, and a billing result is obtained. Compared with the prior art, the method and systm have the advantages that multi-dimensional customized statistical analysis and metering charging are realized, the processing of huge log information amount of cloud resources can be dealt with, the charging efficiency is improved, and the like.
Owner:中国人寿保险股份有限公司上海数据中心

Cluster system fragmentation timing task scheduling method and cluster system

PendingCN110704185ALess invasiveBalance cluster system loadResource allocationCluster NodeCluster systems
The invention discloses a cluster system fragmentation timing task scheduling method and a cluster system, and relates to the field of computer software. The cluster system fragmentation timing task scheduling method comprises the following steps that by acquiring a node number of a cluster node and a fragment serial number of a timing task, a cluster node accesses a distributed cache service to apply a certificate; the cluster node which applies for the certificate serves as scheduling node to obtain the scheduling control authority, and then the scheduling node selects the cluster node withthe corresponding number from the cluster nodes as an execution node according to the number of the fragments of the timing task; the node numbers of the execution nodes correspond to the fragment serial numbers; and the execution node obtains the execution authority of the fragments. The problem that in the prior art, resources cannot be fully utilized for distributed parallel computing when timed tasks are executed is solved, and one timed task is fragmented into a plurality of small tasks to be executed on a plurality of cluster nodes at the same time, so that cluster system resources are fully utilized, and cluster system loads are balanced, and timed task scheduling difficulty is lowered.
Owner:深圳市递四方信息科技有限公司

Verification information generation method, device, terminal equipment and medium

The invention discloses a verification information generation method, a verification information generation device, terminal equipment and a medium, and belongs to the technical field of communication. The method includes the steps of sending a data block generation instruction to a plurality of terminal based on the first filling data filled with the first to-be-processed data and the second filling data filled with the second to-be-processed data, and sending a data block iteration instruction to the first terminal sequentially based on a filling data block of the first filling data and a filling data block of the second filling data returned by each terminal based on the data block generation instruction and triggering the first terminal to generate first verification information corresponding to the combination of the first filling data and the corresponding filling data block and second verification information corresponding to the combination of the second filling data and the corresponding filling data block until the first verification information is the same as the second verification information. Thus, through task scheduling of the plurality of terminals, distributed operation of collision of the verification information is realized, and the efficiency of collision of the verification information is improved.
Owner:TENCENT TECH (SHENZHEN) CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products