The invention discloses a double-layer bottom basket and double-layer knotting construction device and method for an arched beam combined type continuous
rigid frame bridge. The double-layer bottom basket and double-layer knotting construction device comprises a double-layer bottom formwork
hanging basket system, an upper chord temporary
tower frame fastening cable
system and a lower chord fastening cable
system; the double-layer bottom formwork
hanging basket system comprises a double-layer bottom formwork arranged on an upper chord box beam, and a
hanging basket structure capable of walking forwards horizontally along the top face of the upper chord box beam; the upper chord temporary
tower frame fastening cable system comprises a temporary
tower frame structure arranged on the top face of a
pier top beam section, and fastening cable ducts located on the temporary tower frame structure and a
cantilever cast-in-place upper chord box beam section, and fastening cables penetrating through the fastening cable ducts; the lower chord fastening cable system comprises fastening cable ducts arranged on a battened main
pier and a
cantilever cast-in-place lower chord box beam section and fastening cables penetrating through the fastening cable ducts. By adoption of the double-layer bottom basket and double-layer knotting construction device and method,
cantilever construction in the arched beam frame area of the arched beam combined type concrete continuous
rigid frame bridge is achieved, and meanwhile, the problems that construction of an upper box beam through a full support is extremely difficult and the
safety risk is high are solved.