Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

65results about How to "Simplify complex issues" patented technology

Side slope slippage stability judgment method taking non-saturated region effect into consideration

ActiveCN108733961AAccurate, stable and safeAccurate settling timeDesign optimisation/simulationSpecial data processing applicationsReference modelEngineering
The invention discloses a side slope slippage stability judgment method taking non-saturated region effect into consideration. The method comprises the following steps (1), obtaining morphological characteristic information for researching a side slope and geological and hydrological parameters corresponding to side slope soil; (2), obtaining an initial condition in the side slope through segmented point obtaining actual measurement or through utilization of a side slope initial boundary condition simulation method; (3), simulating a subsequent hydrological process in the side slope accordingto corresponding change of a side slope boundary condition under side slope induction factor effect, and obtaining a water line in the side slope at each time; (4), calculating a real-time side slopestability coefficient through utilization of a side slope stability safety coefficient calculation formula, and drawing a side slope minimum stability safety coefficient change flow line; and (5) analyzing the earliest unstability time and a corresponding unstability area of the side slope according to the side slope minimum stability and security coefficient change flow line. According to the method, a relatively accurate real-time stability safety coefficient calculation result can be obtained, the method is used for judging stability of the side slope and predicting unstability time, and arelatively effective reference model for prediction and prevention of a side slope disaster is provided.
Owner:HOHAI UNIV

System and method for detecting content of unfrozen water in frozen soil based on soil mass resistivity variation

The invention discloses a system for detecting the content of unfrozen water in frozen soil based on soil mass resistivity variation. The system comprises a ground data transmission terminal, a computer and a temperature and resistivity detecting device which is placed in a soil mass, wherein the temperature and resistivity detecting device comprises one detecting unit or multiple detection units which are vertically stacked; the detection unit comprises a sleeve and a data acquisition circuit board; the data acquisition circuit board is integrated with a data acquisition and transmission circuit and a power line; the data acquisition and transmission circuit comprises a first microprocessor, a first data memory, a first wireless communication module, a temperature measurement probe and a resistivity measurement probe. The invention also discloses a method for detecting the content of the unfrozen water in the frozen soil based on the resistivity variation. According to the system and the method, disclosed by the invention, implementation is convenient, a complex problem of detecting the content of the unfrozen water in the frozen soil can be simplified, a measurement result is accurate, the instantaneity and the integrity are good, the practicability is high, the using effect is good, and popularization and use are convenient.
Owner:XIAN UNIV OF SCI & TECH

Method for calculating settlement of composite single pile of post-grouting cast-in-place pile of extruded and expanded branch disc

The invention discloses a method for calculating settlement of a composite single pile of a post-grouting cast-in-place pile of an extruded and expanded branch discextruding and expanding branch disc.The invention, belongings to the technical field of building pile foundations. The invention provides a method for calculating settlement of a composite single pile of a post-grouting cast-in-place pile of an extruding and expanding branch disc. The adopted scheme is as follows: the method comprises the steps of 1. Tthe grouting cast-in-place pile is a single pile after the branch disc is extruded and expanded; or the piles are single-row piles, or the center distance of the sparse pile foundation is greater than 6 times of the pile diameter; pile foundation settlement calculation of the cast-in-place pile considers the influence of load sharing of foundation soil at the bottom of a bearing platform on pile foundation settlement. The settlement of the grouting pile composite single pile behind the squeezed branch disc is calculated as follows: the settlement is calculated as follows; superposing additional stress generated by calculation points of bearing platform bottom foundation counterforce and post-grouting cast-in-place pile side resistance and end resistance on a pile body axis below a pile end plane, calculating the settlement of a pile foundation by adopting a one-way compression layering summation method, and counting the pile body compression amount of a section part from a pile top to an upper disc top; the method is suitable for the field of settlement calculationof building pile foundations.
Owner:ZHONGBEI UNIV

Comprehensive energy system steady-state modeling method based on energy concentrator

The invention belongs to the technical field of electric power, and particularly relates to an integrated energy system steady-state modeling method based on an energy concentrator. The innovation ofthe method is as follows: 1) the method can be used for analyzing trans-regional, regional and user-level comprehensive energy systems, and has better applicability, universality and expandability; 2)the supply and demand characteristics of various energy sources are highly abstracted into energy source input and output balance consideration, and energy source coupling characteristics are described through elements in a coupling matrix, so that unification of physics and mathematics is realized; 3) the energy concentrator reflects the idea of energy equivalence, the energy coupling quantity can be converted into the output of a single energy system through an energy matrix, the decoupling of the coupling system is further realized, and the complex problem is simplified; and 4) the model not only can perform abstract modeling on the existing comprehensive energy system, but also can be used as an energy autonomous unit or a generalized node in an energy network to provide theoretical guidance for planning analysis of the comprehensive energy system.
Owner:TSINGHUA UNIV

Intelligent controller for straw bioreactor and control method thereof

InactiveCN101847005ARealize fuzzy controlSolve fuzzy controlTotal factory controlProgramme total factory controlControl systemControl engineering
The invention discloses an intelligent controller, and particularly relates to an intelligent controller for an external straw bioreactor for protective land production and conversion from straws to carbon dioxide gas fertilizer. The intelligent controller for the straw bioreactor structurally comprises an air supply control system, a switch, a liquid discharge control system and a water level sensor, wherein the air supply control system sends working instructions to an air supply motor according to various different switch instruction; the switch sends working instructions to the air supply control system under different working conditions; the liquid discharge control system sends working instructions to a liquid discharge pump according to signals sent by the water level sensor; and the water level sensor transmits working signals to the liquid discharge control system after the water level reaches a set value. The intelligent controller has the characteristics of convenient setting, simple operation, convenient use, intelligence, high efficiency, small volume, flexible and convenient operation and safe use, and can greatly simplify the management program, simplify complex problems, enable a user to quickly master the management technical point of the straw bioreactor and reduce the production cost of the protective land of the user.
Owner:潘玉

Method for handling uncertainty of return results of trigger

ActiveCN102707956AAccurate processing of returned resultsClear structureSpecific program execution arrangementsProgram segmentOracle database
The invention mainly provides a method for handling uncertainty of return results of a trigger, relating to the technical field of computer software. The method specifically includes the following steps that first of all, a variable is stated and is assigned; when processing a cursor, the variable value is changed according to different numbers of the return results through the corresponding abnormal handlings conducted to different return results in an Oracle database, for example, the variable is 1 at the beginning, when the cursor returns one result, the value remains unchanged, when the cursor returns a plurality of results, the variable value is assigned to be 2 and when the cursor returns no result, the variable value is assigned to be 0; and finally different program segments are executed with respect to different variable values by judging the sentences. In such a way, the return results are of clear structure and are simple and explicit, and therefore the trigger can accurately handle the return results of the cursor, the complicated problem is simplified and the expected target is accomplished. The invention aims to solve the technical problem of providing a method for handling the uncertainty of the return results of the trigger so as to ingeniously solve the problem of uncertainty of the return results of the trigger of a database by analyzing the results.
Owner:福建汇智数字通达科技有限公司

Hot backup dual-redundancy electro-hydraulic servo valve control system based on pipeline fluid parameter design

The invention relates to a hot backup dual-redundancy electro-hydraulic servo valve control system based on pipeline fluid parameter design. A constant-pressure valve is arranged on an inlet of an electro-hydraulic servo valve to ensure stable differential pressure between a fluid on the inlet and a fluid on an outlet, according to the differential pressure between the fluid on the inlet and the fluid on the outlet and required maximum flow, the diameter of an inlet and outlet pipe is matched through selection, and meanwhile an adapter block is designed to connect two independent electro-hydraulic servo valve pipelines in parallel to construct the hot backup dual-redundancy electro-hydraulic servo valve control system. No dual-redundancy electro-hydraulic servo valve exists in the domestic market at present, and compared with the prior art, the hot backup dual-redundancy electro-hydraulic servo valve control system has the advantages that the urgent requirement for the dual-redundancy electro-hydraulic servo valve of an existing high-reliability system is met, switching between two electro-hydraulic servo valves when faults occur is avoided through the constructed hot backup electro-hydraulic servo valve, and reliability of the system is improved; the problems that at present, a domestic dual-redundancy electro-hydraulic servo valve is low in design, manufacturing, machining technology levels and low in reliability are solved, the complex problems are simplified, development cost and risks are reduced, and the development period is shortened.
Owner:AIR FORCE UNIV PLA

Lateral rigidity enhancing structure of open section of subway entrance

The invention belongs to the field of deep foundation pit engineering, and discloses a lateral rigidity enhancing structure of an open section of a subway entrance. The lateral rigidity enhancing structure comprises a bottom slab, two main body side walls, top beams, two rows of fender posts, ring beams and joint bars. The two main body side walls are arranged on the bottom slab, and a U-shaped structure is formed by the two main body side walls and the bottom slab jointly. The tops of each row of fender posts bear the corresponding top beam, and the top of each top beam is flush with the top end face of the corresponding main body side wall of the U-shaped structure. Each main body side wall and the adjacent top beam jointly form a ring beam bearing structure. Each ring beam bearing structure bears the corresponding ring beam. The top beams and the ring beams are connected through the multiple joint bars. The lower ends of the joints bars are anchored into the top beams, and the upper ends of the joint bars stretch into the ring beams. The lateral rigidity enhancing structure has the advantages that construction is convenient and fast, the amount of steel bars is small, investment is reduced, and structure safety and the waterproof effect are guaranteed, and has great application prospects in the field of deep foundation pit engineering including subways.
Owner:CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP

Fermat's grand theorem demonstration model

ActiveCN107919040ASimplify the proof processSave proof timeEducational modelsElectric lightFifth power
A Fermat's grand theorem demonstration model is disclosed and relates to the field of teaching of mathematics in primary, secondary and tertiary schools and the field of scientific research. The invention is aimed at constructing a mathematical model for Fermat's grand theorem and solving two problems of mathematics teaching and popularization of science; the demonstration model consists of a number of rectangular square (1), a number of universal Integrated circuit boards (2), a number of positive Integer nth power formula plates (3), a number of touch screen switch cover plates, a third power display panel (5), a fourth power display panel (6), a fifth power display panel (7), a sixth power display panel (8), a seventh power display panel (9), an eighth power display panel ( 10), a ninthpower display panel (11), an nth power universal display panel (12), an nth power variant four-color display panel (13) and a base seat (14); the third power display panel (5), the fourth power display panel (6), the fifth power display panel (7), the sixth power display panel (8), the seventh power display panel (9), the eighth power display panel (10), the ninth power display panel (11), the nth power universal display panel (12), the nth power variant four-color display panel (13) and the base seat (14) are made via via a Fermat inequality parameter method and an assembly display panel method; all display panels are orderly inserted horizontally into opposite grooves of inner sides of wall panels erected before and after the base seat (14); different colors of the rectangular squares on the display panels or lights of electric lights in an integrated circuit are used to show Fermat inequalities and demonstrate that Fermat's grand theorem is true, and the positive integer n is greater than or equal to 3.
Owner:李中平

A rapid construction method for a double-tower five-span steel box truss cable-stayed bridge

The invention discLoses a quick construction method for a twin tower five cross steeL box trussed beam cabLe-stayed bridge, and beLongs to the technicaL fieLd of steeL box trussed beam cabLe-stayed bridge construction in bridge construction; the technicaL purpose is to provide the quick construction method for the twin tower five cross steeL box trussed beam cabLe-stayed bridge capabLe of effectiveLy controLLing the profiLe of the bridge and increasing the construction speed and the accuracy of joining two sections of the bridge. The method comprises the foLLowing steps that two side portionsof the bridge are firstLy compLeted; a guiding beam and a steeL beam structure are weLded towards the sidespan side by utiLizing top pushing equipment, and three sections of a steeL box beam are Leftbehind to instaLL a steeL trussed beam untiL one side portion of the cabLe-stayed bridge is compLeted; after top pushing is conducted on the two sides of the bridge to the suitabLe pLace, residuaL sections are erected to a joining section, the joining section is instaLLed, after the instaLLment of the joining section is compLeted, fuLL-bridge cabLe adjusting is conducted, temporary piers are dismantLed, and the fuLL-bridge profiLe is adjusted; the method can be appLied to the fieLd of the construction of twin tower five cross steeL box trussed beam cabLe-stayed bridges.
Owner:CHINA RAILWAY NO 3 GRP CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products