Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

226results about How to "Avoid procrastination" patented technology

Block data compression system, comprising a compression device and a decompression device and method for rapid block data compression with multi-byte search

A block data compression system comprising a Compression unit and a Decompression unit, and an Algorithm for fast block data compression using multi-byte search. Objective of the invention is to develop a block data compression system and algorithm for fast block data compression with multi-byte search for optimal encoding during the learning phase of substitutional methods, allowing length-limited and relative small blocks of input data symbols to be compressed independently, as required by random-access storage or telecommunication devices; and reaching high-performance characteristics by employed accelerating architectures and highly pipelines data-flow principles. According to the present invention these objectives are accomplished by a Compression Unit comprising an Input-FIFO (8), connected to a Modeling Unit (6), where said Modeling Unit (6) is connected to a multitude of memory locations represented by Trie-Dictionary (4) memory, to a Zero-Finder Look-Up Table (3), to search means in the form of a Comparison Unit (5), to memory means in the form of a Literal-Dictionary (2) and also to an Encoder Unit (7); said Encoder Unit (7) also connected through an Aligning Unit (7) to an Output-FIFO (12). The invention comprises a block data compression system, composed of a Compression Unit and a Decompression Unit, and an algorithm for fast block data compression using multi-byte search; and is related to the field of data compression, specifically to the implementation of a lossless, adaptive, reversible and fast block data compression for storage and telecommunication devices.
Owner:GEMDACO TECH INC

Block data compression system, comprising a compression device and a decompression device and method for rapid block data compression with multi-byte search

A block data compression system comprising a Compression unit and a Decompression unit, and an Algorithm for fast block data compression using multi-byte search.Objective of the invention is to develop a block data compression system and algorithm for fast block data compression with multi-byte search for optimal encoding during the learning phase of substitutional methods, allowing length-limited and relative small blocks of input data symbols to be compressed independently, as required by random-access storage or telecommunication devices; and reaching high-performance characteristics by employed accelerating architectures and highly pipelines data-flow principles.According to the present invention these objectives are accomplished by a Compression Unit comprising an Input-FIFO (8), connected to a Modeling Unit (6), where said Modeling Unit (6) is connected to a multitude of memory locations represented by Trie-Dictionary (4) memory, to a Zero-Finder Look-Up Table (3), to search means in the form of a Comparison Unit (5), to memory means in the form of a Literal-Dictionary (2) and also to an Encoder Unit (7); said Encoder Unit (7) also connected through an Aligning Unit (7) to an Output-FIFO (12).The invention comprises a block data compression system, composed of a Compression Unit and a Decompression Unit, and an algorithm for fast block data compression using multi-byte search; and is related to the field of data compression, specifically to the implementation of a lossless, adaptive, reversible and fast block data compression for storage and telecommunication devices.
Owner:GEMDACO TECH INC

A project management system based on three-dimensional visualization

The invention relates to the technical field of engineering management, in particular to a project management system based on three-dimensional visualization, including a BIM three-dimensional model building module; a GIS three-dimensional topographic map establishment module; a true three-dimensional engineering model building module which is used for combining the BIM three-dimensional model building module and the GIS three-dimensional topographic map building module to generate a true three-dimensional engineering model; a construction information input module used for construction progress and construction process records input; a project management platform used for managing a project through a manager terminal; a three-dimensional engineering model display module which is used for combining the data of the construction information input module and the data of the engineering management platform with the true three-dimensional engineering model establishment module, and realizingthe sharing of the engineering component information; and a database server used for storing and sending data. The system of the invention can facilitate the management and planning of the project bythe management personnel, and is convenient for the staff to report the construction information of the project.
Owner:GUANGXI ROAD & BRIDGE ENG GRP CO LTD

Method and apparatus for high performance branching in pipelined microsystems

A pipelined processor includes a branch acceleration technique which is based on an improved branch cache. The improved branch cache minimizes or eliminates delays caused by branch instructions, especially data-dependent unpredictable branches. In pipelined and multiply pipelined machines, branches can potentially cause the pipeline to stall because the branch alters the instruction flow, leaving the prefetch buffer and first pipeline stages with discarded instructions. This has the effect of reducing system performance by making the branch instruction appear to require multiple cycles to execute. The improved branch cache differs from conventional branch caches. In particular, the improved cache is not used for branch prediction, but rather, the improved branch cache avoids stalls by providing data that will be inserted into the pipeline stages that would otherwise have stalled when a branch is taken. Special architectural features and control structures are supplied to minimize the amount of information that must be cached by recognizing that only selected types of branches should be cached and by making use of available cycles that would otherwise be wasted. The improved branch cache supplies the missing information to the pipeline in the place of the discarded instructions, completely eliminating the pipeline stall. This technique accelerates performance, especially in real-time code that must evaluate data-dependent conditions and branch accordingly.
Owner:ROUND ROCK RES LLC

A highway engineering project management system and method based on combination of BIM and WBS

The invention relates to the technical field of highway engineering management. The invention relates to a highway engineering project management system, in particular to a highway engineering projectmanagement system based on combination of BIM and WBS. The highway three-dimensional model management system comprises a management platform, an identity recognition module, a data input module, a database module, a plan editing module, a terminal module and a construction information module, the management platform comprises a three-dimensional model submodule which is used for importing and displaying a highway three-dimensional model, and the three-dimensional model submodule is established through a plurality of components; the management sub-module is used for creating a WBS node and carrying out service management on the component through the WBS node; and the component information display module is used for comparing and displaying the component service data. According to the technical scheme, the components correspond to the WBS nodes, decision making and implementation are fused according to the WBS concept, and therefore automation of service management is achieved, the workload of workers is reduced, and the working efficiency is improved. The invention further discloses a highway engineering project management method based on combination of the BIM and the WBS.
Owner:GUANGXI ROAD & BRIDGE ENG GRP CO LTD

Intelligent cable capstan device

The invention discloses an intelligent cable capstan device. The intelligent cable capstan device comprises a capstan winding roll, a motor, a tension sensor and a controller, wherein the capstan winding roll is used for winding or unwinding cables; the motor is provided with a motor driver and electrically connected with the capstan winding roll and controls rotation of the capstan winding roll; the tension sensor is electrically connected with the capstan winding roll and used for collecting the tension information of the cables; and the controller is connected with the motor driver and the tension sensor through a converter, and the controller sends a control command to the motor driver so as to control the motor driver to operate and sends an adjusting command to the motor driver according to signals of the tension information, collected by the tension sensor, of the cables so as to adjust and control the rotation speed of the motor driver. By the adoption of the intelligent cable capstan device, automatic winding and unwinding of the cables are achieved in the constant cable tension state, a high-precision photoelectric encoder is arranged, the advancing distance of a crawl device is motored indirectly by measuring and computing the unwinding length of the cables, and the winding action and unwinding action of the cables are adjusted automatically; and labor is saved, lag of the cables in pipelines are avoided effectively, and normal walking of the pipeline climbing device is guaranteed.
Owner:NANJING ANTOUKE INTELLIGENT SYST CO LTD

Continuous estimation method for compaction quality of soil and stone materials based on integrated acoustic detection technique

The invention relates to a continuous estimation method for the compaction quality of soil and stone materials based on an integrated acoustic detection technique. The continuous estimation method comprises the following steps: measuring by virtue of a conventional point sampling detection method, so as to obtain a field test pit point testing result; establishing and selecting a proper soil and stone material compaction quality evaluation model; calculating the compaction quality of each grid on a current grinding construction operation surface; combining with a spatial interpolation method,so as to obtain the compaction quality of each site on current grinding construction operation full working surface; furthermore, carrying out analysis to determine whether a filling grinding construction region is a qualified region or an unqualified region according to a compaction quality control rule, and calculating the qualification rate of the compaction quality of a current grinding construction region; and timely carrying out feedback so as to guide field construction, and carrying out remedial measures, so as to control the construction quality. By utilizing the continuous estimationmethod, the filling quality of soil and stone materials for filling earth and stone projects can be simply, efficiently, continuously, accurately and comprehensively evaluated, so that the filling quality can be timely fed back and controlled.
Owner:TSINGHUA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products