Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11results about How to "Avoid secondary construction" patented technology

Back ridge for preventing water seepage and smoke leakage of flue and flue template system

The invention relates to a back ridge and flue formwork system for preventing water seepage and smoke leakage of a flue, the back ridge comprises a mounting part arranged in a first cavity of a flue main formwork, the bottom surface of the mounting part abuts against a panel of the flue main formwork, and the upper edge of the mounting part does not exceed a side plate of the flue main formwork; each limiting part is arranged on the upper edge of the mounting part and extends towards the two sides from the mounting part, the limiting parts span the side plates of the flue main formwork and the side plates of the adjacent flue corner formworks on the two sides, and the tail ends of the limiting parts can limit the flue corner formworks. The mounting part is arranged in the first cavity of the flue main formwork, most structures of the back edges are embedded into the main formwork, the back edges are designed in a hidden mode, and the back edges are suitable for a narrower space, so that the moving space is larger, and convenience is brought to follow-up formwork disassembly; the flue corner formworks are limited, the formworks are reinforced and prevented from being staggered, and the flue corner formworks on the two sides and the flue main formwork in the middle are connected into a whole.
Owner:SNTO TECH GRP

A grooving method for pre-buried pipelines in roads and bridges

The present invention discloses a grooving method for pre-buried pipelines of roads and bridges, S1, position movement: before use, push the moving carriage in the basic linkage mechanism to the construction point, and then adjust the direction; S2, descending start: after the movement of the equipment is completed, start the cylinder in the grinding drive mechanism to lower the grooving wheel and the cutting wheel to contact the ground, and the present invention relates to the technical field of pre-buried pipelines. The grooving method for pre-buried pipelines of roads and bridges, by combining the basic linkage mechanism and the grinding drive mechanism, the arrangement of these two mechanisms can spray water mist to reduce dust during grooving, and can also use the cutting wheel to cut in advance to improve the flatness. After grooving a certain distance, the power docking and linkage between the structures can be used to drive the grinding disc and the impurity removal frame to drive synchronously, so as to grind and remove impurities inside the pipe groove, improve the internal environment of the pipe groove, avoid secondary construction, reduce labor, and facilitate the use of staff.
Owner:LIAOCHENG HOUDE DEV & CONSTR CO LTD

An underwater cutting device for offshore wind power steel pipe pile

ActiveCN117182268BImplement underwater cutting operationsavoid security risksPlasma welding apparatusGear wheelControl system
The application discloses an underwater cutting device for offshore wind power steel pipe piles, which comprises a base, a lifting mechanism, a pile cutting mechanism, a stable support mechanism, a real-time monitoring mechanism and a remote control system. The base comprises an upper platform, a lower platform, a gear seat and a bearing seat fixed in the center of the bottom surface of the upper platform in sequence; the lifting mechanism comprises two winches fixed on the top surface of the upper platform; the pile cutting mechanism comprises a cutting platform, a platform rotating mechanism, a plurality of cutting oil cylinders and a plurality of plasma cutting torches; the stable support mechanism comprises four support oil cylinders fixed on the top surface of the lower platform; the real-time monitoring mechanism comprises an ultrasonic thickness gauge and an underwater high-definition camera arranged beside the plasma cutting torch; and the remote control system is respectively connected with the winches, the rotating speed sensors, the servo motors in the pile cutting mechanism, the controllers of the cutting oil cylinders, the ultrasonic thickness gauge and the underwater high-definition camera and the controllers of the support oil cylinders. The application can improve the safety of pile cutting operation.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD +1

Construction method of deep foundation pit narrow space outer wall waterproof structure based on integrated waterproof formwork

PendingCN118958382ASolve the problem of insufficient working surface in narrow spacesGuaranteed integrityArtificial islandsProtective foundationArchitectural engineeringStructural engineering
The invention provides a deep foundation pit narrow space outer wall waterproof structure construction method based on an integrated waterproof formwork, which mainly comprises two stages of bottom plate and outer wall lower section waterproof structure construction and outer wall upper section waterproof structure construction, through the one-time forming technology of the waterproof layer and the leveling layer, tedious procedures are effectively reduced, and the problems that in the traditional construction process, the efficiency of the construction connection process of the leveling layer and the waterproof layer is low, and the waterproof layer is not easy to protect in the construction process are solved; by means of the method, the construction integrity of the outer wall waterproof layer and the leveling layer can be effectively guaranteed, the problem that the working face of the narrow space of the deep foundation pit is insufficient is solved, the construction difficulty of the bottom plate and the outer wall waterproof layer of the narrow space of the deep foundation pit is lowered, the construction efficiency is improved, and the overall construction quality is guaranteed. The construction method provided by the invention also has the advantages of simple and clear waterproof construction process, good implementation effect and the like, and has wide popularization and application prospects.
Owner:CHINA FIRST METALLURGICAL GROUP

Miniature steel pipe pile and cast-in-place pile combined enclosure structure

ActiveCN222183368UAvoid secondary constructionlow costExcavationsBulkheads/pilesArchitectural engineeringRebar
The utility model relates to a miniature steel pipe pile and cast-in-place pile combined enclosure structure which comprises a vertically-arranged reinforcement cage, a steel pipe and a partition plate, the lower end of the steel pipe extends into the upper end of the reinforcement cage and is fixed to the inner wall of the upper end of the reinforcement cage, the partition plate is fixed to the top end of the reinforcement cage, and one face of the partition plate is fixed to the side face of the steel pipe. The problem of insufficient rigidity of the steel pipe pile can be avoided, construction procedures can be reduced, the construction cost can be reduced, and meanwhile safety can be guaranteed.
Owner:BGI ENG CONSULTANTS

Vertical prestressed tendon supporting frame anchored in raft inner wall

The invention relates to a vertical prestressed tendon supporting frame anchored in a raft inner wall, which comprises a bottom layer, a supporting mechanism is fixedly arranged on the top surface of the bottom layer, and a fixing mechanism is fixedly arranged in the supporting mechanism; the supporting mechanism comprises a supporting part and a tightening part; the top surface of the supporting part is fixedly connected with the bottom surface of the tightening part; the supporting part comprises a vertical supporting frame. The problem that prestressed tendons and the raft cannot be poured together is solved; the applicability is high, and the method is suitable for anchoring various walls containing prestressed tendons in the raft for construction; the supporting system is clear in force transmission and good in stability; the prestressed tendons are prevented from being polluted by concrete in the concrete pouring process; the supporting steel frame A and the supporting steel frame B can also serve as horizontal steel bar supporting frames; channel steel supports are arranged at the bottoms of the supporting frames and are straightly arranged on the steel bars; the waterproof layer is prevented from being damaged; conflict with steel bars in the wall is avoided, and construction quality is guaranteed.
Owner:THE THIRD CONSTR ENG CO LTD OF CHINA CONSTR SECOND ENG BUREAU

Oil return seat ring connecting assembly of marine main engine

The utility model discloses an oil return seat ring connecting assembly of a marine main engine, which relates to the technical field of marine main engine construction equipment, and comprises an oil return seat ring connecting assembly connected between a main engine oil return hole and a main engine lubricating oil circulation cabin oil return port, and the oil return seat ring connecting assembly comprises a rubber pad, an oil return seat ring and a seat plate, the rubber pad is connected to a main engine oil return hole through a fastener, the seat plate is fixedly connected to the upper portion of an oil return opening of a main engine lubricating oil circulation cabin, and the oil return seat ring is arranged between the rubber pad and the seat plate and detachably connected to the seat plate. According to the utility model, the lubricating oil string washing work of the main engine is advanced, the repeated work of secondary welding of the oil return seat ring is avoided, the construction period is shortened, and manpower and material resources are saved; and meanwhile, the construction potential safety hazard caused by secondary welding of the oil return seat ring is eliminated.
Owner:QINGDAO BEIHAI SHIPBUILDING HEAVY IND CO LTD

Welding protection device and using method

The invention provides a welding protection device and a using method.The welding protection device is used for protecting the periphery when a first welding part and a second welding part are welded, the welding protection device comprises an exhaust fume collecting hood, the exhaust fume collecting hood is connected with the first welding part, and the opening direction of the exhaust fume collecting hood faces the second welding part so as to collect smoke dust generated during welding; the exhaust fume collecting hood further comprises a plurality of adjusting mechanisms, each adjusting mechanism is rotationally connected with the first welding piece, and the exhaust fume collecting hood is connected with the first welding piece through the adjusting mechanisms. According to the using method of the welding protection device, the size of the opening of the exhaust fume collecting hood is adjusted through the adjusting mechanism so as to collect smoke dust generated during welding, and the smoke dust is sucked and removed through the dust suction mechanism. The protective device has the beneficial effects that peripheral wall surfaces or roofs can be protected during welding, primary construction is guaranteed, secondary construction caused by influence of welding on appearance quality is avoided, the appearance quality is guaranteed, and the protective device is simple in structure and convenient to mount and dismount.
Owner:MCC TIANGONG GROUP

Waste fishpond ecological restoration method based on ecological corridor

PendingCN122030323AEliminate barriersAchieve continuous connectivityClimate change adaptationPisciculture and aquariaTidal waterTerrestrial animal
The invention discloses a waste fishpond ecological restoration method based on an ecological corridor. The method comprises the following steps: surveying and mapping a waste fishpond; a biological corridor is constructed between the land and the fish pond to ensure the passage of terrestrial animals; an aquatic ecological corridor is constructed between the fishpond and the ocean, and tidal water is introduced to realize periodical fluctuation of the water level of the fishpond; pond ridge removal, slope cutting and tidal creek excavation are conducted on the interior of the fishpond, and a gentle slope area and a water power circulation system which are communicated with the ecological corridor are formed; shrubs are planted in different areas according to the elevation, the function of a fishpond ecosystem is restored, and continuous communication of a land-fishpond-marine ecosystem is achieved by building a biological corridor between a land forest and a waste fishpond and building an aquatic ecological corridor between a sea and the waste fishpond. Terrestrial animals can smoothly enter the mangrove forest restoration area of the fishpond through the biological corridor, and aquatic organisms can freely migrate between the ocean and the fishpond through the aquatic ecological corridor, so that obstruction of the abandoned fishpond to biological migration is effectively eliminated, and regional ecological connectivity is enhanced.
Owner:孙奇

A water stop device for fabricated laminated slab

The utility model provides a water stop device for assembly type laminated slab, including the water stop section of polygon, the outer periphery of water stop section is provided with the wing ring, the bottom of wing ring lower surface to water stop section is embedded in the laminated slab prefabricated part, and the top of wing ring lower surface to water stop section is cast in the laminated slab cast-in-place part. In the assembly type laminated slab construction, the advantage of embedding rectangular water stop section is remarkable, its neat shape is highly adapted to the laminated slab prefabricated mould, can accurate positioning, reduces installation error and mould cost, the corner structure of rectangular water stop section and the concrete in the laminated slab prefabricated part form mechanical engagement, enhance the connecting strength of water stop section and laminated slab, and disperse stress.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

H-adcp installation position optimization method based on cross-section traversal scanning

The application discloses an H-ADCP installation position optimization method based on cross-section traversal scanning, which comprises the following steps: 1) selecting a cross-section to be installed, using a sailing ADCP to measure flow and synchronously observing water level under different water level stages or flow velocity stages, and calculating the average flow velocity of each cross-section; 2) importing the flow velocity data into a cross-section terrain model, dividing candidate units, traversing and extracting representative flow velocities, and generating a flow field and a standard deviation distribution diagram; and 3) comprehensively analyzing and determining the final position through multi-dimensional quantitative evaluation of flow velocity standard deviation, random uncertainty and correlation coefficient, combined with on-site conditions such as terrain adaptability and interference degree. The method disclosed by the application has high site selection efficiency and is suitable for H-ADCP installation site selection in rivers, lakes and other water areas, and is helpful to improve the online monitoring accuracy of river flow.
Owner:PEARL RIVER HYDROLOGY & WATER RESOURCES SURVEY CENT