The invention relates to an optimization and adjustment testing method for load control of a generator set boiler. The method comprises the steps that (1), a boiler requirement command is processed through a leading/lagging function module; (2), a high selector module selects outputting; (3), a deviation calculation module calculates deviation; (4), the deviation calculation module outputs a deviation value to a main PID control module; (5), function f(x) linear processing and transforming are carried out on an actual load command of a set; (6), derivative control module operation and high and low amplitude limiting processing are carried out on the actual load command of the set; (7), superposition and summation are carried out; (8), the deviation value is input into a feedforward input channel of the main PID control module, and feedforward operation is carried out on the deviation value; (9), the deviation calculation module works out deviation; (10), an integral operation module carries out calculation; (11), the integral operation result is output as a master control command of the boiler. According to the method, the non-linear characteristic of the boiler in the load varying process of the generator set is effectively compensated for, the large-time-delay and great-inertia characteristic of the boiler is restrained, the control characteristic of the boiler is improved, the fluctuation range of the main steam pressure of the boiler is reduced, and the ability, to respond to the load change of a turbonator, of the boiler is improved.