Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42results about How to "Low technical requirements for construction" patented technology

Method for reinforcing and deviation correcting of building foundation through combined grouting

ActiveCN104047307ARapid and precise liftingExtended reaction timeFoundation repairChemical reactionSlurry
The invention discloses a method for reinforcing and deviation correcting of building foundation through combined grouting. According to the method, polyurethane grouting and cement grouting are combined organically, polyurethane grouting drill holes are formed in the area where the maximal sedimentation occurs of the building foundation, the polyurethane reaction raw material slurry is grouted into the drill holes, the chemical reaction expansion is generated, so that the area where the maximal sedimentation occurs of the building foundation can be reinforced and lifted, meanwhile, cement grouting drill holes are formed in the periphery of the polyurethane grouting drill holes in a certain density, the pre-existing pores, pre-existing gaps and gaps generated after the polyurethane grouting foundation is lifted in the reinforced foundation are filled and reinforced through the cement grouting method, and a cement-reinforced body is formed. The method has the advantages the reinforcing and lifting of the building foundation through the polyurethane grouting are quick and precise; the building foundation is evenly and comprehensively reinforced through the cement grouting; the construction process is simple, convenient and fast, and the cost is low.
Owner:SHANGHAI SHEN YUAN GEOTECHN +1

Dustpan-shaped inflow channel with excellent hydraulic performance and application method of dustpan-shaped inflow channel

The invention discloses a dustpan-shaped inflow channel with excellent hydraulic performance and an application method of the dustpan-shaped inflow channel, and belongs to the technical field of hydraulic engineering pump station. The dustpan-shaped inflow channel comprises three sections, namely a straight inlet section, a dustpan-shaped steering section and a trumpet pipe rectifying section, which are arranged in the water flow direction, wherein all the sections have different geometrical characteristics and effects; a rectifying separator plate is arranged in the middle of the straight inlet section, and an anti-vortex separator plate is arranged in the middle of the dustpan-shaped steering section; the straight inlet section, the dustpan-shaped steering section, the trumpet pipe rectifying section as well as the rectifying separator plate of the straight inlet section and the anti-vortex separator plate of the dustpan-shaped steering section are independent prefabricated reinforced concrete components, are manufactured in a factory, and then are transported to the pump station field for field assembly to form a complete dustpan-shaped inflow channel. The dustpan-shaped inflow channel provided by the invention is excellent in hydraulic performance, simple in application method and suitable for small and medium vertical pump stations, ensures the construction quality of the pump station inflow channel and greatly lowers the requirements for the field construction technology level of the inflow channel.
Owner:YANGZHOU UNIV

Floor assembly and installation method

ActiveCN106677479AThere will be no problem of inaccurate positioningReduce construction difficultyFlooringBrickEngineering
The invention discloses a floor assembly and an installation method. The floor assembly comprises at least two limiting frames and installation plates, wherein the limiting frames are horizontally laid on the ground, and the installation plates correspond to the limiting frames one to one; the limiting frames are horizontally laid in an inserted mode, and at least one edge of each limiting frame is provided with a protruded transverse bar and a limiting groove; each installation plate comprises a bonding face and an installation face, wherein the bonding face is used for bonding a face brick, the installation face is back to the bonding face, and the installation faces are attached to limiting faces; and blocking walls are installed on the installation faces, and the blocking walls are connected with the protruded transverse bars and the limiting grooves in a clamping mode. The installation method comprises the following steps that the face bricks are bonded to the bonding faces of the installation plates; the limiting frames are horizontally laid on the ground so that the limiting frames can be horizontally inserted; and the installation plates are installed on the limiting frames. According to the floor assembly and the installation method provided by the embodiment of the invention, construction is simple, positioning is quick and accurate, the construction period is short, the construction site is not polluted, and maintenance and replacement at the later period are facilitated.
Owner:ZHEJIANG YASHA DECORATION

Wall panel mounting assembly and mounting method thereof

The embodiments of the invention disclose a wall panel mounting assembly and a mounting method thereof. Thewall panel mounting assemblycomprises a wall panel and a hanging assembly, the hanging assemblycomprises a hanging piece and a horizontal keel, and the hanging piece comprises a left side plate, a middle side plate and a right side plate; the right side plate is mounted on the wall panel, the twooppositely arranged sides of the middle side plate are connected with the right side plate and the left side plate correspondingly, and the left side plate, the middle side plate and the right side plate three form a hanging groove;and the horizontal keel is provided with a supporting inserting plate and a fixing surface for being fixedtoan original wall, the fixing surface is parallel to the supporting inserting plate, and the hanging groove is formed in the supporting inserting plate in an hanging mode. By using the embodiments, the dry installation of the wall panelcan be realized, the installation process of the wall panelis simplified, the construction period isshortened, the cost issaved, the installation efficiency isimproved, cement mortar or an adhesive is not required, environmental pollutioncan be avoided, and the environmental protection effect of the decoration isimproved.
Owner:ZHEJIANG YASHA DECORATION

Adjustable column formwork

The invention discloses an adjustable column formwork. The adjustable column formwork comprises a front formwork body, a rear formwork body, a left formwork body and a right formwork body. A sliding groove, a small sliding groove, teeth and size scales are arranged on a pouring face of the rear formwork body, and two ends of the sliding groove are chiseled through. One end of the sliding groove ofeach of the left formwork body and the right formwork body is chiseled through, two bearings are arranged on a side wall of a non-chiseled end of each of the left formwork body and the right formworkbody, and the rest structures of the left formwork body and the right formwork body are the same with the structures of the rear formwork body. Four bearings are arranged on a side wall of the pouring face of the front formwork body. According to a column side line, the rear formwork body is firstly installed, the left formwork body and the right formwork body are embedded into the sliding grooveformed in the pouring face of the rear formwork body through the bearings of the left formwork body and the right formwork body to be connected with the rear formwork body, the front formwork body isembedded into the sliding groove formed in the pouring face of the left formwork body and the sliding groove formed in the pouring face of the right formwork body through the bearing on the front formwork body to be connected with the left formwork body and the right formwork body, and the upper formwork body and the lower formwork body are connected through bolts and inserting holes in the backfaces of the formwork bodies. The distance between the formwork bodies is achieved through sliding bearings according to the size scales on the pouring faces, each sliding groove is sealed through a sealing strip embedded into the corresponding small sliding groove, and the formwork bodies are fixed through formwork fixing devices and the sealing strips. The formwork is convenient to dismount andassemble, one formwork can be used for pouring of columns in multiple sizes, column hoops are not needed, and popularization is facilitated.
Owner:XIANGTAN UNIV

Urushiol boron resin and preparation method thereof

InactiveCN101747484AOvercome allergiesHeat resistantCoatingsChemistryAldehyde
The invention discloses an urushiol boron resin and a preparation method thereof. The urushiol boron resin comprises the following raw materials in percentage by mass: 20-40% of urushiol, 4-8% of aldehyde compound, 0.5-1% of boron compound, 10-20% of epoxy resin, 0.5-1% of catalyst and 40-60% of thinner. The urushiol boron resin has the characteristics of high temperature resistance, alkali resistance, water resistance, oil resistance, wear resistance and strong adhesive force, and can be directly coated on an object. The varnish film has the advantages of excellent heat resistance, water resistance and strong chemical resistance. The product of the invention is suitable for aerospace, electronic information, automobile industry, household appliances and the like.
Owner:中华全国供销合作总社西安生漆涂料研究所

Combined steel structure building template

The invention discloses a combined steel structure building template. The combined steel structure building template comprises templates and supporting rods, and is characterized by further comprising fixed templates, scaling templates, stabilizing rods, stair fixing baffles, stair scaling baffles, footstep retainers, pushing strips and mold detaching rods, wherein the fixed templates and the scaling templates are provided with mold detaching holes matched with the mold detaching rods respectively; every two templates are detachably connected through a buckle; every two footstep retainers are detachably connected through the corresponding pushing strip; the fixed templates, the scaling templates, the stair fixing baffles and the stair scaling baffles are detachably connected through the stabilizing rods respectively, and the positions of each template and each baffle are adjusted by the stabilizing rods; a supporting rod head detachably connected with each supporting rod is arranged at the top end of the supporting rod; a horizontal groove which is used for supporting a template rib to enable the stress on each template to be balanced is formed in the head of the corresponding supporting rod. The combined steel structure building template is convenient and quick to construct, can be recycled, has the good structural advantage, and is suitable for being widely popularized and applied, and wood resources are greatly saved.
Owner:杨漩强

Construction column used for masonry structure and its production method and special precast segment

The invention provides a constructional column for a masonry structure, which is characterized in that the constructional column is mainly formed by assembling precast segments (2) with longitudinal ribs (1). The invention also provides a method for preparing the constructional column for the masonry structure and special precast segments thereof. The preparation of the constructional column according to the method has low cost, because, on one hand, the precast segments can be produced in precast component factories, have a simple production technology, and are convenient to be promoted in the precast component factories in rural areas, and the industrialized production can reduce the cost to ensure that the cost for the constructional column is reduced; on the other hand, no formwork supporting is needed during the construction of the constructional column, thereby saving the cost for raw material purchase (or the tenancy of a steel formwork) of a formwork and the labor cost such asthe manufacture, supporting and removal of the formwork and so on; and a hollow constructional column can be adopted in a low seismic fortification intensity area, the cost for a concrete material ina cavity part can be saved, and the labor cost can also be saved due to the fact that no wet operation is needed on the spot.
Owner:CHONGQING UNIV

Reinforced wall coating and processing method thereof

The invention discloses a reinforced wall coating. The reinforced wall coating comprises a hyperchromic layer, a wall coating base layer and a reinforced net which are arranged sequentially from top to bottom, wherein the wall coating base layer comprises, by weight, 10-25 parts of purified cotton, 15-30 parts of wood fibers, 20-30 parts of spinning thread and 5-15 parts of adhesive. The processing method includes the steps of S1, preparing wall coating raw materials; S2, preparing wall coating base layer raw material strips; S3, preparing hyperchromic layer raw materials; S4, hyperchromic layer raw material strips; S5, performing pressing molding; S6, rolling; S7, packaging. The reinforced wall coating has the advantages that the reinforced wall coating is low in construction difficulty and short in construction time particularly for wall surfaces requiring large-area laying; the reinforced wall coating is high in structural strength and surface evenness, so that technical requirements on construction are lowered, and wallpaper surfaces are less prone to local tearing or shedding; the reinforced wall coating cannot affect secondary decoration, thereby being high in practical value.
Owner:包俊鸿

Upper liquid accumulation system for liquid gravitational potential energy storage power station

The invention relates to an upper liquid accumulation system for a liquid gravitational potential energy storage power station. The upper liquid accumulation system comprises liquid accumulation containers, a pipeline, a valve, a monitoring control device, an anti-freezing and deicing facility and a mountain body, wherein the upper liquid accumulation system is positioned on the mountain body; each liquid accumulation container is a closed or semi-closed tank body located on a foundation; when the ground is bumpy, each liquid accumulation container can adopt a closed or semi-closed tank body structure which is supported by a support so as to be suspended on the ground; a liquid level monitoring device is arranged on each container; the containers are connected through the pipeline; the valve is arranged on the pipeline; the monitoring control device controls inflow and outflow of liquid and liquid level in each container by controlling opening and closing of each valve; the upper liquid accumulation system is provided with the anti-freezing and deicing facility; during a power load valley period, the liquid in a lower liquid accumulation device is lifted to the liquid accumulation container, and energy is stored; and during a power load peak period, the liquid orderly flows out of each liquid accumulation container through the pipeline under the coordination of the monitoring control device, a power generation device is driven, and the gravitational potential energy of the liquid is converted into kinetic energy. The upper liquid accumulation system is large in energy storage scale and low in requirements on terrain and geology conditions.
Owner:SOOAR BEIJING INVESTMENT MANAGEMENT GRP

Die for welding steel tube and sleeve and use method thereof

The invention relates to the technical field of building steel tube connection and discloses a die for welding a steel tube and a sleeve and a use method of the die for welding the steel tube and the sleeve. According to the die for welding the steel tube and the sleeve, a base is fixed to the bottom end of a supporting column, an operation platform is fixed to the top end of the supporting column, a fixed screw rod is arranged at the center of the operation platform, the fixed screw rod is detachably connected with a sleeve head, a clamp is fixed to the position over the operation platform through a supporting rod in a suspended manner, the central axis of a clamp outer ring is horizontally arranged, and a clamping portion and a self-tightening portion are arranged along the diameter of the clamp outer ring; the top end of a threaded rod of the clamping portion supports a clamping sheet in a jacking manner, the tail end of the threaded rod of the clamping portion is fixed to a clamping handle, and fixed columns are sleeved with clamping springs; the top end of a self-tightening rod of the self-tightening portion is fixed to a self-tightening clamping sheet, the tail end of the self-tightening rod is fixed to a self-tightening handle, and the self-tightening rod is sleeved with a self-tightening spring; and two limiting columns are symmetrically arranged on the two sides of the self-tightening rod located outside the clamp outer ring correspondingly and are parallel to the self-tightening rod, and the two ends of each limiting column are fixed to the clamp outer ring and the self-tightening handle correspondingly. The die for welding the steel tube and the sleeve is simple in structure and easy and convenient to operate.
Owner:THE THIRD CONSTR OF CHINA CONSTR FIRST GROUP +1

Foundation pile anti-corrosion system based on action of electric field

The invention discloses a foundation pile anti-corrosion system based on the action of an electric field. The foundation pile anti-corrosion system comprises a foundation pile body. A plurality of electric conductors are arranged at the certain distance positions of the circumference of the periphery of the foundation pile body at equal intervals in an embedded manner. An electric conduction layeris arranged in the foundation pile body. The outer surfaces of the electric conductors are wrapped by an insulating waterproof layer. An additional alternating current power source is arranged on thefoundation pile anti-corrosion system. An output negative electrode of the additional alternating current power source is connected with the electric conduction layer in the pile body through a wire,an output positive electrode of the additional alternating current power source is sequentially connected with the electric conductors through wires, and the electric field is formed between the foundation pile body and the peripheral electric conductors. The basic element causing foundation pile corrosion is found through analysis and is erosion from ions with negative charges, the principle that charged ions move under the action of electric field power in the electric field is utilized, the impressed voltage is applied to the foundation pile, the electric field is formed within a certain range around the foundation pile through the impressed voltage, the ions with the negative charges in soil are promoted to get away from the pile body, and accordingly the purpose of integral foundation pile corrosion prevention is basically achieved, wherein the ions with the negative charges have a corrosion function on the foundation pile.
Owner:LANZHOU UNIVERSITY

Water-based multifunctional self-drying coloring base material and preparation method thereof

The invention discloses a water-based multifunctional self-drying coloring base material, which consists of a film-forming substance, an auxiliary agent and water, and is specifically prepared from the following components in parts by weight. The invention also discloses a preparation method of the water-based multifunctional self-drying coloring base material. The water-based multifunctional self-drying coloring base material has the following beneficial effects: (1) emulsion is used as a film forming material, and the water-based multifunctional self-drying coloring base material has self-drying, good transparency, excellent adhesive force and no delamination phenomenon; (2) the water-based multifunctional self-drying coloring base material has a uniform paint film, uniform coloring andno blooming phenomenon; (3) the water-based multifunctional self-drying coloring base material has slow moisture retention, long opening time, good construction tolerance and low construction technical requirements for construction personnel; (4) the water-based multifunctional self-drying coloring base material is multifunctional and can adapt to different construction requirements, such as wiping, brushing, spraying and tapping and (5) the water-based multifunctional self-drying coloring base material is suitable for the coloring and wiping purposes of most wood coatings on the market and has great application value.
Owner:CARPOLY CHEM GRP

JS waterproof coating repairing and reinforcing structure and construction method

The invention relates to the technical field of building waterproof construction, in particular to a JS waterproof coating repairing and reinforcing structure and a construction method. The JS waterproof coating repairing and reinforcing structure comprises a top plate waterproof structure, a bottom plate waterproof structure and a wall waterproof structure, the top plate waterproof structure comprises a JS waterproof layer, a waterproof protection layer, a repairing and maintaining layer and a repairing and reinforcing layer, and the bottom plate waterproof structure comprises a JS waterproof layer, a waterproof protection layer, a repairing and maintaining layer, a repairing and reinforcing layer and a cushion layer. The wall waterproof structure comprises a JS waterproof layer, a repairing and maintaining layer, a repairing and reinforcing layer and a waterproof isolating layer, the repairing and reinforcing layer is a calcium salt coating, and the repairing and maintaining layer is a geotechnical cloth laying layer. The calcium hydroxide coating is additionally arranged, so that the structure has sufficient calcium ions, the requirement for the surrounding environment is lowered, and when cracks occur, calcium salt promotes the waterproof layer to form solid colloid linkage and accumulation to block a water inlet channel, and the leaking stoppage purpose is achieved.
Owner:CHINA CONSTR EIGHTH ENG DIV

UHPC-NC combined bridge deck slab structure with stiffening ribs and construction method of UHPC-NC combined bridge deck slab structure

The invention relates to a UHPC-NC combined bridge deck structure provided with stiffening ribs and a construction method thereof.The combined bridge deck structure comprises a plurality of UHPC components provided with the UHPC stiffening ribs, a UHPC connecting layer, bridge deck steel bars and an NC post-pouring layer, the UHPC components are hoisted on a main beam, the UHPC connecting layer is poured between every two adjacent UHPC components, and the NC post-pouring layer is connected with the UHPC components. The bridge deck slab reinforcing steel bars are laid on the tops of the stiffening ribs, and the NC post-pouring layer is poured on the UHPC components and the bridge deck slab reinforcing steel bars. By using the construction method provided by the invention, the UHPC-NC combined bridge deck slab structure of the stiffening ribs can be obtained. Compared with the prior art, the method has the advantages that the bridge deck structure is optimized, the engineering cost is reduced, the operation and maintenance cost of the whole life cycle is reduced, construction is convenient, the speed is high, quality is good, and safety is high.
Owner:SHANGHAI PUDONG ARCHITECTURAL DESIGN & RES INST

Embedded anchoring-buttress type combined retaining wall structure and construction method

The invention discloses an embedded anchoring-buttress type combined retaining wall structure and a construction method, and belongs to the technical field of geotechnical engineering. A plurality of parallel inclined buttresses are arranged on the inner side of a buttress type retaining wall. A vertical face of the buttress type retaining wall is provided with reserved anchor cable holes, and the inner side of the buttress type retaining wall is a backfilled gravel soil layer. The backfill gravel soil layer is provided with a groove body, and the groove body comprises an anchor cable free groove, an anchor cable anchoring groove and an expansion head groove. The inner end of the anchor cable forms an anchor cable anchoring section and an expansion head in the anchor cable anchoring groove and the expansion head groove by pouring cement mortar. A plurality of steel strands at the outer end of the anchor cable penetrate through the anchor cable free groove and are fixed to the anchor head through reserved anchor cable holes. A plurality of steel strands in the anchor cable free section and the anchor cable anchoring section are supported in the groove body through a plurality of centering supports. The invention further provides a construction method. The pre-stressed anchoring technology is combined with a traditional buttress type retaining wall to work, so that the problems that a high buttress type retaining wall is poor in stability, large in size, high in manufacturing cost and the like when working independently are solved. The construction time is short, the engineering cost is low, and the quality is good.
Owner:SHENYANG ZHONGJIAN DONGSHE GEOTECHN ENG +1

The Method of Reinforcement and Correction of Building Foundation by Combined Grouting

ActiveCN104047307BRapid and precise liftingExtended reaction timeFoundation repairChemical reactionSlurry
The invention discloses a method for reinforcing and deviation correcting of building foundation through combined grouting. According to the method, polyurethane grouting and cement grouting are combined organically, polyurethane grouting drill holes are formed in the area where the maximal sedimentation occurs of the building foundation, the polyurethane reaction raw material slurry is grouted into the drill holes, the chemical reaction expansion is generated, so that the area where the maximal sedimentation occurs of the building foundation can be reinforced and lifted, meanwhile, cement grouting drill holes are formed in the periphery of the polyurethane grouting drill holes in a certain density, the pre-existing pores, pre-existing gaps and gaps generated after the polyurethane grouting foundation is lifted in the reinforced foundation are filled and reinforced through the cement grouting method, and a cement-reinforced body is formed. The method has the advantages the reinforcing and lifting of the building foundation through the polyurethane grouting are quick and precise; the building foundation is evenly and comprehensively reinforced through the cement grouting; the construction process is simple, convenient and fast, and the cost is low.
Owner:SHANGHAI SHEN YUAN GEOTECHN +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products