The utility model discloses a kind of hand-held
pipe gallery side wall fill soil vibration compaction and monitoring equipment, belong to
pipe gallery construction technical field;Including the moving device of guide plate installation;The guide plate includes: located in the leading end right side of moving direction guide plate, located in the left side of moving device vibration pressure base plate and the
middle segment plate of connecting guide plate, vibration pressure base plate;The inside space of the guide plate is provided with a
handle wheel component;Vibration pressure base plate is provided with vibration component, monitoring component on it.The utility model, change original backfill method, effectively help
pipe gallery side wall below fill soil, and realize the monitoring of fill soil density;Form mobile auxiliary
assembly, reduce the labor intensity of staff, and improve effect and backfill quality;
Design guide plate structure cooperation in different functions, realize the guidance of backfill soil and vibration compaction and monitoring operation;Quantitative analysis after compaction backfill soil density, real-time monitoring whether backfill soil density is qualified.