Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

4results about How to "Achieve elimination" patented technology

Scenic spot image processing method and device, equipment and storage medium

ActiveCN119887548Bachieve eliminationachieve fixImaging processingNuclear medicine
The present application relates to the technical field of image processing, and particularly relates to a scenic spot image processing method and device, equipment and a storage medium, the method comprising obtaining a to-be-processed scenic spot image, determining a target region in the to-be-processed scenic spot image, removing the target region in the to-be-processed scenic spot image to obtain a removed image; obtaining image attribute information of the to-be-processed scenic spot image, obtaining a similar image corresponding to the removed image according to the image attribute information; determining a target region in the similar image, completing the removed image according to the target region in the similar image to obtain a completed image; inputting the completed image and the image attribute information into a preset image inpainting neural network model to perform image inpainting on the completed image, and obtaining an inpainted image of the to-be-processed scenic spot image, which realizes the elimination of sundries and inpainting of the to-be-processed scenic spot image, and meets the image processing requirements of users.
Owner:SHENZHEN CHINO E COMM CO LTD

A defoamer delivery system

ActiveCN224381273Ureduce wasteachieve eliminationPipeline systemsFoam dispersion/prevention
The application provides a defoaming agent conveying system and relates to the field of strip cleaning. In the technical scheme, when it is detected that the thickness value of the foam in the liquid storage barrel is high, the first infusion device is triggered to be turned on, and the first infusion device conveys the defoaming agent stored in the liquid storage tank to the liquid storage barrel, so that the defoaming agent injected into the liquid storage barrel is consistent with the thickness value of the foam, and the defoaming agent waste is reduced on the basis of eliminating the foam in the liquid storage barrel.
Owner:SHOUGANG ZHIXIN QIAN AN ELECTROMAGNETIC MATERIALS CO LTD

A magnesium fuel cell

The present application relates to a kind of magnesium fuel cell, including single cell or 2 above single cell circuit series, parallel or series-parallel hybrid composition battery;The single cell includes a hollow single cell shell, is transversely arranged with a transition layer in the middle and lower part in single cell shell, the four peripheral edges of transition layer are sealedly connected with shell inner wall surface, transition layer will shell be divided into two upper and lower chambers not communicated each other, electrolyte is filled in upper chamber as electrolyte chamber, lower chamber is filled with regenerative liquid as regenerative liquid chamber;Anode, air cathode are placed in electrolyte chamber;The transition layer changes with the state change of battery discharge process, so that regenerative liquid can react with the discharge product in single cell through transition layer;The regenerative liquid is acid solution.The long-time continuous discharge feasibility of magnesium fuel cell is significantly improved.
Owner:DALIAN INSTITUTE OF CHEMICAL PHYSICS CHINESE ACADEMY OF SCIENCES

A parallel processing scheduling method and system of a multi-station laser cutting machine and a medium

ActiveCN121165671Bavoid randomnessImprove execution efficiencyPathPingGraphics
The application provides a parallel processing scheduling method and system of a multi-station laser cutting machine and a medium, and relates to the field of laser processing scheduling and production optimization control. The method comprises the following steps: collecting graphic information of a to-be-processed task, extracting path structure features, and assigning path segment numbers; constructing a subtask feature vector and a station capacity score vector; and performing preliminary scheduling of the subtask based on a matching degree value; evaluating thermal influence conflicts and performing scheduling optimization in combination with spatial distance and processing time period overlap rate; and monitoring station abnormalities and dynamically rescheduling remaining path segments during execution. The problems of coarse multi-station laser cutting task scheduling granularity, unreasonable resource allocation, failure to consider thermal influence interference between stations, and abnormal response lag in the prior art are solved.
Owner:SHIP LIFT (DALIAN) CO LTD