The present application relates to the technical field of foundation pit measurement, and more particularly to a construction coordinate transfer method and coordinate measurement
transfer system suitable for deep foundation pit; the construction coordinate transfer method comprises the following steps: preparing step: adjusting the center of the
prism to be physically collinear with the steel
wire rope; obtaining the coordinates of the reflecting sheet: taking the coordinates of the center of the
prism in the construction coordinate
system as the coordinates of the reflecting sheet on the steel
wire rope corresponding to the
prism in the construction coordinate
system; obtaining the coordinates of the site at the bottom of the foundation pit: combining the coordinates of the reflecting sheet in the construction coordinate
system, the coordinates of the site in the construction coordinate system are obtained according to the resection method, that is, the transfer of the construction coordinate from the ground to the bottom of the foundation pit is completed; without
purchasing expensive special equipment such as
laser plumb instrument, the construction cost is reduced, the space occupied by the support is small, the support does not need to be removed during layer-by-layer excavation, the construction process is reduced, the coordinate transfer process is relatively simple, and the precision is high.