The invention discloses a reinforcement cage for a prestressed
pipe pile and a core filling quick-setting concrete construction method, and relates to the field of
building construction.The reinforcement cage comprises a main reinforcement, stirrups are fixed to the outer portion of the main reinforcement in a surrounding mode, and the lower portion of the main reinforcement penetrates through a dragging bottom plate and is connected with a reinforcement sleeve through bolts. The construction method comprises the following steps:
cutting the main reinforcement and threading the end part to obtain a reinforcement connecting thread port, and trying to sleeve a reinforcement sleeve; through holes are formed in the mop bottom plate in the circumferential direction. The stirrups surround the outer portions of the main reinforcements and are bound and fixed, the main reinforcements penetrate through the through holes of the dragging bottom plate, the reinforcing
steel bar sleeves are installed on the reinforcing
steel bar connecting threaded openings, a reinforcing
steel bar cage is manufactured, and the reinforcing steel bar cage is placed in the concrete
pipe; the quick-setting
cement paste is prepared; taking core filling concrete, mixing the core filling concrete with the prepared quick-setting
cement paste, and stirring to prepare quick-setting core filling concrete; and pouring the quick-setting core-filling concrete into the concrete
pipe with the pouring depth of 50cm, pouring the core-filling concrete into the concrete pipe, and pouring to the designed elevation, thereby completing the pouring.