The invention provides a high-precision mounting and fixing construction process and structure for a large-
tonnage whole stone
parapet wall. The construction technology mainly comprises the following steps that firstly, the embedded foundation
assembly is installed, specifically, an embedded plate and an anchor bar are welded, and after initial adjustment is conducted through a hydraulic oil cylinder, fine adjustment is conducted through an
electronic level meter; secondly, a positioning locking
assembly is installed, specifically, a positioning
steel bar penetrates through a long round hole in the pre-buried plate and is welded and fixed through perforation plug
welding; 3,
processing and hoisting the whole stone; 4, three-dimensional dynamic leveling is conducted, specifically, a four-point synchronous jack is started, a
laser gradienter is combined for scanning, and fine adjustment is conducted through a stainless steel
gasket set; fifthly, seam splicing control is conducted, specifically, the stainless steel datum line with the
diameter being 1 mm is tensioned, and every four pieces of stone form a closed-loop correction unit; sixthly,
thermal deformation compensation is conducted, wherein a belleville spring and
chloroprene rubber pad combined compensator is installed; 7, stress dispersion, wherein C40 non-shrinkage
cement-based
mortar is laid on the bottom face of the stone; c60 high-strength grouting materials are injected from the side face. The technical problems that in the prior art, a whole stone
parapet wall is low in hoisting precision, insufficient in contact and large in abutted seam error are solved.