The invention discloses a method for quickly splitting electrical loads. Shunt tripping is achieved on a booster station switch through light equation protection action and a protection standby outlet, and it is guaranteed that the booster station switch is quickly split, so that it is guaranteed that a power generator can be adjusted to a stable state under the condition that the power generator is not collapsed. The method includes the specific operating steps that under the power failure condition, a standby protection tripping outlet of a central substation two-way power input line protection device is connected to a pressing plate in series and then connected to a terminal strip; two cables led out from a booster station switch cabinet are placed to a master control room I and II loop light equation protection screen, terminals are wired according to principles, and then protection logic debugging is conducted, whether wiring and pressing plate connection are correct or not is verified, and in manual and remote control states, the booster station switch is reliable and does not move. The method achieves the purpose that load shedding is conducted on the power generator before the power generator loses stability, and is simple, practicable, safe, reliable, easy to popularize in the power industry, and suitable for occasions where the generator needs to stably operate, and no protection device needs to be additionally arranged.