The invention provides deep low-permeability high-gas
coal seam drilling-
cutting-sealing-pressing drilling equipment and method, and relates to the technical field of
coal mine gas extraction and dustfall. The equipment comprises a drilling
control system, a high-pressure hydrodynamic
system, a
water pressure grading
control system and a fracturing plugging
control system, wherein the drilling control
system adjusts the drilling direction of a hole-drilling drilling rod and the
water supply pressure of the drilling rod, high-pressure hydrodynamic
system provides high-pressure water with different pressure for the equipment, and the
water pressure grading control system ensures that the drilling and drilling
cutting washing
water pressure is smaller than 5 MPa, the water pressure for a
cutting seam in the direction perpendicular to the length of the drilling rod is 25-35 MPa, the sealing water pressure of a sealing
capsule is 35-40 MPa, and the water pressure of further pressure reliefand anti-reflection of a
coal seam is 40-50 MPa; and the fracturing plugging control system finishes hole sealing and
hydraulic fracturing construction control. According to the method for constructing drilling holes, slitting in the holes, hole sealing and the
hydraulic fracturing by utilizing the equipment, the integrated construction of the single equipment is realized, and the construction efficiency of gas drainage hole drilling and coal seam dust prevention is improved.