The present invention relates to the field of frequency converter test systems, and in particular to a universal frequency converter test
system and method, comprising: a load simulator module, used for simulating a variety of power supply conditions and load types; a measuring module, used for recording parameters such as
voltage, current, frequency and power during the operation of the frequency converter; a control and
data acquisition module, including a central
control unit and
data acquisition hardware, used for controlling the test process and collecting data; a
software platform, used for configuring test parameters, executing test programs, collecting and analyzing data, and generating reports; the output end of the load simulator module is connected to the input end of the frequency converter, used for simulating power supply conditions and load types, and directly affecting the
working environment of the frequency converter; the input end of the measuring module is connected to the output end of the frequency converter, used for real-time recording parameters such as
voltage, current, frequency and power during the operation of the frequency converter; the output end of the measuring module is connected to the input end of the control and
data acquisition module, and provides
test data.