Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

206results about How to "Effective data support" patented technology

Curvature detection device and method for drill rod

The invention relates to a curvature detection device and method for a drill rod. The device comprises a drill rod clamping part, a sensor transmission part and a control and operation part, wherein a three-jaw chuck, a V-shaped block and a stepping motor A are arranged on the drill rod clamping part; the three-jaw chuck is used for clamping one end of the drill rod, and the other end of the drill rod is placed on the V-shaped block; a 2D (two-dimensional) laser sensor and a stepping motor B are arranged on the sensor transmission part; the control and operation part comprises a single-chip microcomputer and a host. The detection method comprises the following steps: acquiring the three-dimensional coordinate information of hemi-profile data points of a plurality of sections of the drill rod by using the 2D laser sensor; processing and calculating a section central point through the host, and fitting the central lines of n sections; determining the maximum curvature and coordinate value of a maximum bending point, comparing with the curvature limit value of the drill rod, judging whether the curvature of the drill rod is qualified or not, and providing a judgment result for a user. The device is scientific in structure, the detection method is simple, the curvature information of the drill rod can be obtained efficiently and accurately, and technical support is provided for the increase of the production accuracy of the drill rod.
Owner:CHINA UNIV OF GEOSCIENCES (WUHAN)

Evaluation method and apparatus for coverage effectiveness of LTE network base station

The embodiment of the invention, which relates to the technical field of communication, provides an evaluation method and apparatus for coverage effectiveness of an LTE network base station. With the method and apparatus, a reliable data support can be provided for optimizing a network structure reasonably, reducing cell interference, and lowering the operation and maintenance cost. The method comprises: an engineering parameter of each base station in a road test region at least including a target region as well as network data information of each 3G cell in a 3G base station coverage range established at the same site as the base station is obtained; a value coefficient for each cell in each base station coverage range in the target region is calculated; all structural base stations in the target region are determined; a total coverage effective rate of all structural base stations in the target region is calculated; and if the total coverage effective rate of all structural base stations in the target region is larger than a preset coverage rate, the structural base stations in the target region are determined to meet the coverage requirement. The evaluation method and apparatus are used for evaluating coverage effectiveness of base stations.
Owner:CHINA UNITED NETWORK COMM GRP CO LTD

Thermal power generating unit load (quasi) steady-state working condition clustering algorithm based on data smoothness functions

The invention discloses a thermal power generating unit load (quasi) steady-state working condition clustering algorithm based on data smoothness functions. The algorithm comprises the steps that 1, a comprehensive application statistics method is used for carrying out data pretreatment on collected unit load data, and the accuracy and the uniformity of a researched data object are improved so that the operation working condition of a unit can be reflected truly; 2, with the data smoothness functions as a criterion, a monotonous data region larger than a preset critical threshold value is cut off, and the (quasi) steady-state working condition of unit load data is determined; 3, the unit load data meeting the requirement for the data smoothness and meeting the shortest (quasi) steady-state working condition time are selected, and the effective clustering algorithm is used for obtaining and storing a typical working condition data set. The method is flexible, applicable, suitable for determining the thermal power generating unit load (quasi) steady-state working condition, capable of obtaining the typical working condition data of unit operation, and the effective data support is provided for work such as follow-up unit diagnostic service and condition analysis and optimization of the unit operation.
Owner:STATE GRID HEBEI ENERGY TECH SERVICE CO LTD

Multilingual public opinion analysis-based tourism big data system

The invention provides a multilingual public opinion analysis-based tourism big data system. The multilingual public opinion analysis-based tourism big data system comprises a cross-language big datacollecting subsystem, a cross-language big data processing subsystem and a cross-language big data analysis and application subsystem, wherein the cross-language big data collecting subsystem is usedfor collecting and in real time transmitting multi-dimensional tourism public opinion data to the cross-language big data processing subsystem and the cross-language big data analysis and applicationsubsystem; the cross-language big data processing subsystem intelligently processes and analyzes collected multilingual data and transmits analyzing results to the cross-language big data analysis andapplication subsystem; the cross-language big data analysis and application subsystem popularizes and applies the analyzing results. Through collection and automatic machine translation and processing worldwide multilingual data and fusion with domestic tourism big data, the multilingual public opinion analysis-based tourism big data system can produce worldwide tourism big data knowledge graphsand tourism think tanks, thereby promoting tourism development from a global perspective.
Owner:GTCOM TECH QINGDAO CO LTD

Quantitative analysis method for influences on comprehensive energy consumption by electric energy quality

The invention relates to the field of energy consumption monitoring and energy-saving evaluation of electrical equipment and particularly relates to a quantitative analysis method for influences on comprehensive energy consumption by electric energy quality. The quantitative analysis method mainly comprises the following steps: (1) measuring low-voltage end harmonic data parameters of a transformer; (2) measuring voltage deviation and apparent power parameters of a low-voltage side of the transformer based on an L-shaped equivalent circuit of the transformer, and combining nominal parameters of the transformer to calculate equivalent resistance in the equivalent circuit of the transformer; (3) measuring three-phase load current parameters of the transformer; and (4) giving different weights and calculating the comprehensive energy consumption of the transformer respectively aiming at a transformer energy consumption change condition caused by calculated harmonic waves, voltage deviation and three-phase unbalanced factors. The quantitative analysis method can be used for rapid and accurate quantitative transformer electric energy quality energy consumption condition in engineering application, and provides effective data support for analyzing energy consumption characteristics of the transformer.
Owner:ELECTRIC POWER RES INST OF GUANGXI POWER GRID CO LTD

A method for predicting flowing temperature of coal ash

The present invention provides a method for predicting a flowing temperature of coal ashes. The method includes substituting component content of the coal ash to be detected into a coal ash flowing temperature predicting model, to obtain a predicting value of the flowing temperature of the coal ash to be detected, wherein the coal ash flowing temperature predicting model is constructed by the following steps: analyzing the coal ash composition and the coal ash flowing temperature of the coal entering the factory or the mixed coal, and building a sample point data set using the obtained multiple groups of analyzed data, wherein each group of analyzed data includes the coal ash composition content and the corresponding coal ash flowing temperature; based on the sample point data set, using the coal ash composition content as an independent variable, using the coal ash flowing temperature as a dependent variable, and establishing the coal ash flowing temperature predicting model using a method of partial least-squares regression. The method solves the boundedness of complex analysis procedures and long analysis periods of a conventional coal ash flowing temperature measuring method. In addition, the method overcomes the ill effect of the multiple correlations on system modeling, narrows errors in model predicting, and increases robustness of the model.
Owner:DATANG INNER MONGOLIA DUOLUN COAL CHEM CO LTD

Intelligent metal structure monitoring system

The invention discloses an intelligent metal structure monitoring system. The intelligent metal structure monitoring system comprises a large-area monitoring system, a small-area monitoring system, a field center server, a data control center and a client side, wherein the large-area monitoring system is used for acquiring the image of a metal building and sending the image to the field center server; the small-area monitoring system is used for acquiring the temperature data, deformation data, pressure data and leaked water data of nodes through sensors arranged at the nodes of the metal building, and sending the data to the field center server; the field center server is used for storing the received data and transmitting the data to the data control center; the data control center is used for calculating and analyzing the received monitored data, and then storing the analysis result and sending the analysis result to the client side. According to the intelligent metal structure monitoring system, the metal structure is monitored from the integral and small parts by virtue of the large-area monitoring system and the small-area monitoring system, so that double insurance can be realized, mutual verifying can be realized, and further, the monitoring accuracy can be well provided.
Owner:SHANDONG YABAITE SCI & TECH CO LTD

Hydrological simulation device for drainage asphalt pavement and testing method for hydrological simulation device

InactiveCN104807977AAvoiding Insufficiencies in Void Ratio Design VerificationAvoid Design Verification InadequaciesEarth material testingVehicle frameRoad surface
The invention discloses a hydrological simulation device for a drainage asphalt pavement and a testing method for the hydrological simulation device. A testing bearing platform is established in a laboratory, a canopy and a canopy bracket are mounted on the testing bearing platform, a water supply pipeline and a rainfall sprinkle nozzle are mounted on the canopy bracket, a water tank and a water return pipe are arranged in the middle of the testing bearing platform, the water return pipe is connected with the water tank, a wheel movement guide rail and a guide rail bracket are arranged on the testing bearing platform, a wheel towing frame is mounted on the guide rail bracket, a wheel towing motor and a standard wheel are mounted on the wheel towing frame, and a drainage testing pavement is arranged on the testing bearing platform. According to the hydrological simulation device for the drainage asphalt pavement and the testing method for the hydrological simulation device, determination of hydrological parameters such as pavement surface water depth and drainage efficiency of drainage testing pavements under different rainfall conditions and with different vehicle speeds and tire pressures, different pavement gradients and different structures can be simulated, and effective data support can be provided for the design and the construction of the drainage asphalt pavement.
Owner:BROADVISION ENG CONSULTANTS

Reservoir fish resource acoustics investigation method

The invention discloses a reservoir fish resource acoustics investigation method. The method comprises the steps that (1), multi-mesh combination gill nets are designed; (2), the length of cruising paths is designed; (3), the cruising paths are designed; (4), net points are designed and laid, water surface sub-areas are designed, and the multi-mesh combination gill nets are laid in all the sub-areas; (5), underwater acoustics data are collected, and acoustics evaluation data of a reservoir fish resource are obtained; (6), fish samples are collected, the multi-mesh combination gill nets are laid in all the sub-areas before the sun sets, and statistics is carried out on the species, the body length, the body mass, the quantity and the proportion of catches in all the sub-areas; (7), the reservoir fish resource is evaluated comprehensively, and the underwater acoustics evaluation data and fish sample data are combined for obtaining a result of the reservoir fish resource. The effects of path planning and fish sample collecting in the acoustics investigation of the reservoir fish resource are achieved; the reliable basis is provided for reasonable utilization and management of the reservoir fish resource, and the condition of the reservoir fish resource is evaluated efficiently and fast.
Owner:INST OF AQUATIC LIFE ACAD SINICA

Destination population prediction method and device and storage medium

The invention discloses a destination population prediction method, and the method comprises the steps: setting a reference position, and constructing a Thiessen polygon network of a to-be-predicted region according to the reference position; recording all feasible paths from the starting point to the destination point in the range of the to-be-predicted region; according to the original total population quantity of the destination point and the population quantity among all the feasible paths, calculating a probability value from the population starting from the starting point to the destination point; and obtaining the total population quantity of the destination point at the target moment according to the original total population quantity of the starting point, the original total population quantity of the destination point, the outflow population quantity of the destination point and the probability value. According to the method for predicting the population quantity of the destination, the population quantity of the destination can be predicted based on dynamic data, the population flowing situation is reflected in the prediction process, and the accuracy of destination population prediction is improved. The embodiment of the invention further discloses a device for predicting the population quantity of the destination and a storage medium.
Owner:GCI SCI & TECH

A method of information collection and storage based on the control system of wind power generating set

The invention discloses an information acquisition and storage method based on a wind generator set control system, which is characterized by acquiring an acquisition system which can be connected with a programmable logic controller in a communication mode and used for acquiring variable data. The information acquisition and storage method comprises the following steps: 1. defining scanning period and a time stamp of the programmable logic controller for controlling the wind generator set, wherein the scanning period is x milliseconds; 2. setting a variable data information table and variable data sampling frequency in the acquisition system, wherein the variable data sampling frequency is N*x milliseconds, and N is a positive number; 3. starting the acquisition system, and respectively acquiring the corresponding variable data in the programmable logic controller according to the variable data sampling frequency; and 4. storing the variable data by the acquisition system. The method can be used for acquiring more detailed variable data of the control system and helping with quickly and accurately detecting the fault cause, and thus, has important meanings for wind generator set state monitoring and fault diagnosis.
Owner:CHONGQING KK QIANWEI WINDPOWER EQUIP

Online monitoring system for oil seal leakage of mining reducer and online monitoring method

ActiveCN109708822ARealize online monitoringTimely and accurate detection of oil leakage faultsMeasurement of fluid loss/gain rateData informationMonitoring system
The invention, which belongs to the technical field of mining machinery and equipment, discloses an online monitoring system for oil seal leakage of a mining reducer and an online monitoring method. The online monitoring system comprises an oil collecting device, a detecting device and a central controller. The oil collecting device is used for collecting sealed oil leaked by a reducer. The detecting device detects and outputs oil amount data information of the sealed oil collected by the oil collecting device. The central controller receives the oil amount data information outputted by the detecting device and carries out data analysis and processing. Besides, the online monitoring method uses the online monitoring system. Therefore, a problem that the operation can not distinguish the sealed oil leaked conventionally from sealed oil leaked after sealing failure is solved. Meanwhile, the oil amount and the oil amount changing rate of the collected sealed oil are detected to provide ascientific data support for determining the oil leakage fault of the reducer; on-line monitoring of the oil leakage fault of the reducer is realized; and the operator can discover the oil leakage fault of the reducer timely and accurately.
Owner:NINGXIA TIANDI BENNIU IND GRP +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products