The invention discloses a deep hole pre-grouting top plate reinforcement method for a large-mining height working face under special geological conditions. By the method, the phenomenon that local inbreak accidents of a top plate of the large-mining height working face are easy to cause due to the special geological conditions can be avoided, and the problems of poor effect of the conventional cement grout advanced reinforcement of the special geological conditions and high cost of high-polymer shallow part grouting can be solved. The method comprises the following steps of: distributing three lines of drilled holes on a laneway's side from top to bottom in a crossed shape, adjusting the angles of all the drilled holes, and controlling the positions of end holes, so that the effect of multi-point multi-face effective distance reinforcement can be achieved; after each drilled hole is opened, inserting a 108 sleeve pipe into the drilled hole, and solidifying by using grout; when each hole is drilled forward 5 meters, grouting once; after initial setting, cleaning, and drilling the next section continuously, wherein during construction, a short circle is finished after the drilling depth reaches 5 meters; and after solidification, cleaning and continuously drilling until the hole depth reaches the designed depth. The method has the advantages of good reinforcement effect, reasonable parameter, simplicity in construction, low cost and safety and reliability, and is particularly suitable for reinforcing the large-mining height working face under the special geological conditions.