The invention discloses a construction method for synchronous construction of filling wall masonry and electrical line pipe pre-embedding. The construction method comprises the steps: S1, a prefabricated building block mould is manufactured; S2, a pipe distributing concrete building block is prefabricated; S3, a wall body is subjected to line-snapping positioning; S4, a vertical line pipe is erected; S5, filling wall masonry is conducted, specifically, filling wall masonry should be synchronously constructed with line pipe pre-embedding in a masonry body, the pre-embedded line pipe is nested with the prefabricated pipe distributing concrete building block, and then a line box mounting hole is reserved in the wall masonry process; S6, a line box is stabilized; S7, before filling wall plastering, pipe scavenging needs to be conducted, a pipeline is corrected when problems occur, and after pipeline smoothness is confirmed through pipe scavenging, a strip line is threaded; and S8, qualityacceptance is conducted. The construction process is simplified, the work efficiency is improved, the workload is reduced, the overall construction period is shortened, the large number of labor costand material input are saved, and the construction method has good promotion value for omitting wall body line pipe chiseling, ensuring the structure and electrical mounting project quality, and promoting energy conservation and environmental protection.