Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

12results about How to "Improve field applicability" patented technology

A reusable temporary sealing device for post-pouring strips

ActiveCN224620849Uimprove securityImprove closure
A reusable temporary sealing device for post-cast strips includes a metal cover plate, a keel frame, a sleeve, and a lifting and fixing rod. The keel frame is welded above the reinforcing bars of the post-cast strip. A through-hole sleeve is vertically installed at the center of the keel frame. The metal cover plates are placed one by one above the upper keel frame of the post-cast strip according to the positioning lines. The connecting parts of the metal cover plates are processed into insert-shaped folded edges. The metal cover plates are connected at the insert-shaped folded edges by C-shaped flat inserts. After connection, a continuous U-shaped weather-resistant rubber strip is installed on the side of the metal cover plate. The metal cover plate is attached to the keel frame and connected by electric welding. A lifting and fixing rod is installed inside the sleeve. The bent part of the lifting and fixing rod hooks to the reinforcing bars of the post-cast strip. The threaded section of the lifting and fixing rod extends upward from the sleeve. This utility model uses a steel keel and metal cover plate structure, which is sturdy, durable, and highly safe. The sealing plate uses a snap-fit ​​connection, and the edges are made of rubber and pre-pressed to fit the structural surface, making it highly adaptable to the field and providing high sealing performance.
Owner:CONSTR DEV OF CHINA CONSTR SIXTH ENG DIV

Pitting extreme depth distribution prediction method based on image of un-rust galvanized steel wire

PendingCN122597301AImprove field applicabilityincrease flexibility
The application discloses a pitting extreme depth distribution prediction method based on a rusted galvanized steel wire image, takes a steel wire group as a prediction object, collects a rusted surface image of a training steel wire group in a training stage, generates a local image block through pretreatment, extracts corrosion characteristic features and carries out group-level fusion to form a training sample feature vector; three-dimensional measurement is carried out on the same steel wire group after rust removal, a pitting depth field is constructed, block extreme values are extracted and extreme value distribution is fitted, the obtained extreme pitting depth distribution parameters are taken as target outputs, and a pitting extreme depth distribution regression prediction model is trained; in a prediction stage, the same treatment is carried out on an image of a steel wire group to be measured and the trained model is input, and the pitting extreme depth distribution parameters of the steel wire group to be measured are output. The application establishes a quantitative mapping between the rusted image features and the three-dimensional pitting extreme value distribution parameters after rust removal, does not need rust removal and three-dimensional measurement in the prediction stage, and improves the field applicability of corrosion detection of parallel steel wire system components such as in-service bridge cables, hangers and main cables.
Owner:ZHEJIANG UNIV

A Dual Evaluation Method for Shale Reservoir Fracturing Performance Based on a Cohesion-Friction-Layering Coupling Model

This invention relates to a dual evaluation method for fracturing performance of shale reservoirs based on a cohesion-friction-bedding coupling model. It includes: preparing shale samples with different bedding angles; conducting Brazilian splitting experiments, uniaxial compression experiments, and triaxial compression experiments to obtain time-load curves and stress-strain curves for shale at different bedding angles; and constructing a shale brittleness index under uniaxial stress. B un Determine the degradation coefficient of shale brittleness due to confining pressure. B wc Constructing the brittleness index of shale under triaxial stress conditions B tr Shale brittleness index under triaxial stress conditions B tr This invention combines well logging data to predict the distribution of rock brittleness across the entire block and well section, clarifying reservoir compressibility, and integrates with geological modeling software to predict fracture morphology and fracturing effectiveness. This invention solves the problems of inconsistent rock brittleness assessment results and the difficulty in combining them with geophysical data for application in anisotropic shale, which negatively impacts shale reservoir fracturing design and fracturing effectiveness evaluation.
Owner:NORTHEAST GASOLINEEUM UNIV

A service concrete permeable anti-freezing protective material and a preparation method thereof

PendingCN122502207Aprevent intrusionisolation damage
The application discloses a kind of service concrete penetration type anti-freezing protective material and preparation method thereof, belong to concrete protection technical field.The composition of the protective material is: organic silicon modified penetration enhancement component 30~60 parts, nano-crystalline component 10~30 parts, microbial self-repairing component 5~20 parts, composite silane coupling agent 2~8 parts, penetration accelerator 1~5 parts, stabilizer 0.5~3 parts, defoaming agent 0.1~1 part, water 10~50 parts.The application constructs "hydrophobic barrier-crystallization densification-microbial self-repairing" triple synergistic protection system, solves the technical bottleneck that existing concrete protective material penetration depth is shallow, long-acting protection stability is poor, has no active crack repair capacity, construction is complicated, and on-site adaptability is poor.The application preparation process is simple, product performance is stable, cost-effective, can long-acting improve the frost resistance of concrete structure in severe cold area.
Owner:RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +1

A deep learning-based plate shape control spray flow optimization method

ActiveCN121266952Bimprove accuracyreduce supercoolingDynamical optimizationSimulation
The application discloses a kind of based on deep learning's plate shape control spray flow optimization method, it is characterized in that include following steps: S1 data acquisition: obtain plate specification parameter, process parameter, spray system state parameter and plate shape measurement data, and with time stamp and volume number / rolling section identification;S2 data pre-processing: to the acquisition data is washed, abnormal processing, normalization or standardization, feature engineering, and with sliding time window Construction time series sample;S3 prediction model: the sample after pre-processing is input into long short-term memory network containing self-attention mechanism, and the flow setting value of spray system is output;By this method, the dynamic optimization and real-time adjustment of spray flow can be realized, the plate shape control precision and production adaptability are improved, and the trial-and-error cost and artificial experience dependence are reduced.
Owner:SUZHOU BOONPUT MEASUREMENT & CONTROL TECH CO LTD

Track irregularity signal compression and reconstruction method and system based on compressed sensing theory

PendingCN122001386AReduce sample rateLower ADC performance metricsCode conversionReconstruction methodSignal compression
The invention provides a track irregularity signal compression and reconstruction method and system based on a compressed sensing theory, and mainly relates to the technical field of railway infrastructure health monitoring and big data processing. According to the method, the sampling accuracy in the engineering field is mainly improved, redundant information is reduced, the system bottleneck of storage and transmission is improved, a measurement matrix irrelevant to a sparse transformation base is introduced at a signal acquisition end, and a compression observation value far lower than the Nyquist rate is directly obtained. And then, an original track irregularity signal is reconstructed from a small number of observation values with high precision by solving a norm minimization problem at a data processing end. According to the method, the front-end data sampling rate, the hardware load and the data transmission and storage requirements are greatly reduced, meanwhile, it is guaranteed that the reconstructed signal meets the engineering analysis precision, and a core technical scheme is provided for a new-generation efficient and low-cost track detection system, real-time train-structure system dynamic analysis and the like.
Owner:NORTHWESTERN POLYTECHNICAL UNIV +1

A single-sided formwork stabilization device for basement exterior walls

This invention relates to the field of exterior wall construction technology, specifically a single-sided formwork stabilization device for basement exterior walls. It includes an installation rod, with a template fixedly connected to one side of the installation rod. A sliding groove is provided on the installation rod. A blocking mechanism is provided on the installation rod, template, and sliding groove. The blocking mechanism includes two installation slots, two guide slots, two rotating rods, two round rods, a lifting seat, and two first-strength magnets. The beneficial effects of this invention are: by setting up a linked blocking mechanism, when the support mechanism is deployed, the two blocking frames automatically merge and close the hinges, sliding grooves, and other key structures on the installation rod, effectively preventing the intrusion and adhesion of impurities such as flying stones, cement mortar, and wet concrete debris from the construction site. This fundamentally avoids problems such as poor hinge rotation and sliding groove jamming, ensuring smooth adjustment and rotation of the device throughout the entire process, and significantly improving the reliability of the formwork support device.
Owner:陕西建工集团股份有限公司

A Finite Element Analysis Method for Mesostructural Evolution of Rock Mass Based on Material Heterogeneity Mapping

This invention discloses a finite element method, storage medium, and computer program product for the microstructural evolution of rock masses based on material heterogeneity mapping. The method includes data acquisition; parameter inversion; mesh construction; coordinate registration; weighted statistics; assigning equivalent parameters to elements; adaptive mesh refinement in high-gradient regions; model initialization and solution: initial field loading and boundary condition definition are completed, and elastoplastic or multi-field coupled calculations are performed. The advantage of this invention is that it improves the predictive ability of the finite element model for the non-uniform deformation and microstructural evolution of rock masses.
Owner:TONGJI UNIV

A composition for preventing and treating black spot disease in Panax notoginseng

ActiveCN120787976BLong durationReduce the frequency of sprayingBiocideFungicidesChitosan nanoparticlesPhosphoric acid
This invention provides a composition for preventing and controlling black spot disease in Panax notoginseng, relating to the field of Panax notoginseng black spot disease control technology. (1) Chitosan nanoparticle carrier with a particle size of 50-200 nm, and surface modified with carboxymethyl or tripolyphosphate ions; (2) Active ingredients loaded on the chitosan nanoparticle carrier, including polyoxin and tea tree oil; (3) The content of polyoxin in the composition is 5-15 wt%, and the content of tea tree oil is 1-3 wt%; (4) The active ingredients are bound to the nanoparticles by electrostatic adsorption or covalent bonding, and the cumulative release rate is ≤30% within 48 hours at 25°C. This invention controls drug release (48-hour release rate ≤30%) through electrostatic adsorption / covalent bonding of chitosan nanoparticle carrier, so that the drug forms a long-lasting protective film on the leaf surface, extending the effective period from 5 days of traditional preparations to 10-15 days, and reducing the frequency of application by more than 50%.
Owner:INST OF MEDICINAL PLANTS YUNNAN ACAD OF AGRI SCI

Slope digital twin self-updating and early warning method based on satellite InSAR and ground displacement joint constraint

The present application relates to the field of geological disaster monitoring and warning and geotechnical engineering informatization, and discloses a kind of satellite InSAR and ground displacement joint restraint's slope digital twinborn self-update and early warning method, solve the existing slope monitoring technology There are problems such as difficult multi-source data fusion, stability analysis cannot dynamically update parameters and sliding surface geometry, lack of digital twinborn model self-update capability and single early warning index.The present application fuses satellite InSAR surface deformation, ground GNSS point deformation, deep profile deformation data under unified space-time and coordinate datum, realizes the real-time self-update of model by constructing twinborn model augmented state containing geotechnical parameters and sliding surface geometric parameters, combined with hierarchical consistency constraint objective function, then fuses static stability index of limit equilibrium method and dynamic deformation index of proxy model, forms comprehensive hierarchical early warning system considering static stability and dynamic deformation characteristics of slope.
Owner:CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE

Highway tunnel thin-wall composite reinforcing structure and design method

The disclosed highway tunnel thin-wall composite reinforcing structure comprises multiple groups of reinforcing pipe segments, the multiple groups of reinforcing pipe segments are sequentially spliced along the length direction of the tunnel, each group of reinforcing pipe segments comprises two reinforcing pipe segments, the two reinforcing pipe segments are connected at the top and arranged left and right staggered, the bottom of the reinforcing pipe segment is connected with the tunnel inner ground beam, and the reinforcing pipe segment is a concrete prefabricated structure; the reinforcing pipe segment comprises a thinning portion and a main body supporting portion connected on both sides of the thinning portion, the height of the thinning portion from the ground is 4-5 meters, the thickness of the thinning portion is less than that of the main body supporting portion, the normal compressive bearing capacity of the thinning portion and the main body supporting portion is the same, and a hole for hoisting, grouting or connection is arranged on each reinforcing pipe segment. The design method is used for designing the highway tunnel thin-wall composite reinforcing structure, the method is designed by using the equal pressure strength method, and the compressive resistance and bearing capacity of the tunnel can be improved while the useful passing space is improved.
Owner:CHINA MERCHANTS CHONGQING COMM RES & DESIGN INST