Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

68results about How to "Smooth crossing" patented technology

Automatic pipe fitting path distribution conveying mechanism

The invention discloses an automatic pipe fitting path distribution conveying mechanism, and belongs to the field of workpiece machining conveying mechanical equipment. A guide pipe mechanism and a path distribution mechanism of the automatic pipe fitting path distribution conveying mechanism are sequentially arranged on one side of a fixed bracket from top to bottom; a distribution pipe materialpipe is obliquely arranged in the position, on the lower side of a guide pipe material pipe, of the fixed bracket; the lower side of the guide pipe material pipe is provided with a bearing pipe baffle; the upper end of a material supplying pipe communicates with the lower end of the guide pipe material pipe; a front path distribution material pipe is vertically arranged in the middle of the lowerside of the material supplying pipe, and a rear path distribution material pipe is vertically arranged at the tail end of the lower side of the material supplying pipe; a material separation mechanismis horizontally arranged on the upper side of the material supplying pipe; and the upper end of the front path distribution material pipe is provided with a rotary baffle, and one side of the lower end of a hook rotary plate located on one side of a reciprocating rotary plate is provided with a hook mechanism. The automatic pipe fitting path distribution conveying mechanism is reasonable in structural design, can stably and efficiently distribute pipe fittings into paths for conveying and can discharge the pipe fittings according to the rear path pipe fitting machining load requirement, the automation degree of pipe fitting path distribution conveying is increased, and the production using requirements are met.
Owner:海宁市波菲特进出口有限公司

Wind power plant active power scheduling method for guaranteeing flexible tower resonance ride-through

The invention discloses a wind power plant active power scheduling method for guaranteeing flexible tower resonance ride-through. The method comprises the following steps: obtaining an active power regulation and control target value from a power scheduling system; if the active power regulation and control target value is greater than the sum of the full-field real-time active power, dividing controllable fans into seven up-regulation priorities according to the real-time power and the propeller angle, and sequentially increasing the power of the fans until a full-field active power limit value reaches the active power regulation and control target value; if the active power regulation and control target value is less than a full-field real-time active power sum, dividing the active powerregulation and control target value into eight down-regulation priorities, sequentially decreasing the power of the fans until the full-field active power limit value reaches the active power regulation and control target value, and returning an active power set value of each fan to the power scheduling system. In the power scheduling process, it can be guaranteed that the fans smoothly pass through a resonance rotating speed interval, so the fans are prevented from staying in the resonance rotating speed interval; the frequencies of the fans passing through the resonance rotating speed interval are reduced, the loads of the fans are effectively reduced, and the safety of the fans are improved.
Owner:XEMC WINDPOWER CO LTD +1

High-voltage transmission line inspection robot with multiple motion modes

The invention discloses a high-voltage transmission line inspection robot with multiple motion modes, which comprises a box body, a front mechanical arm, a middle mechanical arm, a rear mechanical armand a control system, wherein the front mechanical arm, the middle mechanical arm and the rear mechanical arm are sequentially arranged above the box body at intervals from front to back, and all themechanical arms are telescopic mechanical arms; the rear mechanical arm and the front mechanical arm are the same in structure and oppositely arranged on the left and right sides of the high-voltagetransmission line; the lower ends of the front mechanical arm and the rear mechanical arm are rotationally connected with the box body, and first walking wheels are arranged at the upper ends of the front mechanical arm and the rear mechanical arm and driven by a first servo motor; the lower end of the middle mechanical arm is movably connected with the box body through a horizontal guide mechanism, and a second walking wheel is arranged at the upper end of the middle mechanical arm and driven by a second servo motor arranged on the middle mechanical arm to rotate. The robot has the advantagesof being high in inspection speed, high in climbing, straight line and corner obstacle crossing capacity, high in automation degree, good in gravity center stability and capable of guaranteeing rapidand smooth electric power inspection.
Owner:SHANDONG UNIV OF SCI & TECH

Construction method for high-level large-diameter directional drilling of complex roof

ActiveCN111287656AGuaranteed Extraction EffectReduce the difficulty of decentralizationDrill bitsDirectional drillingStructural engineeringCoal
The invention discloses a construction method for high-level large-diameter directional drilling of a complex roof. The construction method comprises the steps that a hole is drilled from a positive angle in a coal seam, and a guide directional hole of a casing hole section is drilled to penetrate through a roof and a weak broken layer to reach a stable extraction layer; then counterboring is performed along the guide directional hole of the casing hole section to the bottom of the hole; a protective casing is lowered from a hole opening to protect a hole section of the weak broken layer; holesealing materials are injected into the annulus of the protective casing and the drill hole wall to seal the protective casing; a measurement-while-drilling directional drilling tool assembly penetrates through the casing hole section, and drills a guide directional hole of a main extraction hole section to the design hole depth along a design trajectory; and the measurement-while-drilling directional drilling tool assembly is removed, and counterboring is carried out on the basis of the guide directional hole of the main extraction hole section, and hole drilling is finished in the form of open holes. Therefore, the difficulty in hole drilling and forming and interruption of borehole gas extraction due to the collapse of the hole wall of the weak broken layer during the construction of the main extraction hole section and in the later extraction process are avoided, the large-diameter counterboring is further implemented on the main extraction hole section by penetrating through thecasing hole section, and the gas extraction effect is improved.
Owner:XIAN RES INST OF CHINA COAL TECH& ENG GROUP CORP

Walking structure of cleaning device for photovoltaic power generation plate

The invention discloses a walking structure of a cleaning device for a photovoltaic power generation plate. The walking structure comprises a movable support frame vertically arranged on the surface of a photovoltaic power generation plate, wherein the movable support frame is provided with a sweeping component. When the movable support frame transversely moves along the surface of the photovoltaic power generation plate, the sweeping components is in charge of sweeping the surface of the photovoltaic power generation plate; the movable support frame is provided with a transverse movement driving wheel set and an inter-plate spanning wheel set; and the transverse movement driving wheel set drives the movable support frame to transversely move on the surface of the photovoltaic power generation plate. The inter-plate spanning wheel set drives the movable support frame to span a clearance between the two adjacent photovoltaic power generation plates. In the walking structure of the cleaning device for the photovoltaic power generation plate, unevenness between the adjacent photovoltaic power generation plates can be tolerated to the greatest extent, and the clearance between the adjacent photovoltaic power generation plates can be smoothly spanned. The walking structure has excellent moving performance.
Owner:NINGXIA RUIYING TIANCHENG AUTOMATION TECH CO LTD

Unmanned ship bridge crossing control method and device, electronic equipment and storage medium

PendingCN113406961ATroubleshoot unmanageable technical issuesSmooth crossingPosition/course control in two dimensionsMarine engineeringData bank
The invention discloses an unmanned ship bridge crossing control method and device, electronic equipment and a storage medium. The unmanned ship bridge crossing control method comprises the steps: obtaining a bridge crossing control angle through calculation according to longitude and latitude of a bridge crossing starting point and a bridge crossing ending point obtained from a rear-end database; based on the current latitude and longitude of the unmanned ship, the course angle and the latitude and longitude of the bridge-crossing starting point, controlling the unmanned ship to travel to the bridge crossing starting point; adjusting the direction of the unmanned ship to enable the unmanned ship to coincide with the gap bridge control angle, then controlling the unmanned ship to drive into the bridge, and dynamically adjusting the course angle of the unmanned ship to enable the course angle to coincide with the gap bridge control angle when the unmanned ship passes through the bridge; calculating the current position information of the unmanned ship by adopting an inertial navigation algorithm based on the inertial data and the longitude and latitude of the unmanned ship before entering the bridge; based on the satellite signal data and the current position information of the unmanned ship, judging whether bridge crossing of the unmanned ship is finished or not, and if the satellite signal data and / or the current position information of the unmanned ship meet preset conditions, judging that bridge crossing of the unmanned ship is finished.
Owner:陕西欧卡电子智能科技有限公司

Core assembly and method for increasing irradiation flux of vertical epithermal neutron beams

The invention belongs to the technical field of cancericidal nuclide neutron knives and particularly discloses a core assembly and a method for increasing the irradiation flux of vertical epithermal neutron beams. A plurality of fuel rods and depleted uranium rods of a fuel assembly of the core assembly are arranged on the circumference of a plurality of concentric circles at unequal intervals on an upper grid plate and a lower grid plate respectively. The method comprises the following steps: 1, the power of a core is increased, and the arrangement of the fuel rods is determined; 2, a transition section is improved; wherein in the step 1, the power of the core is increased to 45 kw, and the fuel rods are arranged in non-uniform circle distances; improvement of the transition section comprises decreasing of lower beryllium piece thickness to 5 cm, decreasing of water layer thickness to 5 mm and increasing of lower cylinder bottom thickness to 52 mm. The assembly and the method have the advantages as follows: input proportion of the epithermal neutrons can be increased effectively, the output core neutron flux is increased, and the non-uniform coefficient of the core power is reduced.
Owner:CHINA ZHONGYUAN ENG

A method for detection and processing of front lone stone cave for shield tunneling construction

The invention discloses a method for detecting and processing the front lone stone cave for shield tunneling construction, which comprises the following steps: Step 1, drilling the detection hole in advance: through multiple drilling passages arranged on the cutter head of the shield tunneling machine, the Drill multiple detection holes in front of the cutter head of the shield machine from back to front; step 2, boulder detection: use an ultrasonic detector and use multiple detection holes to detect boulders, the process is as follows: 201. Ultrasonic transmitter and ultrasonic receiver 202. Ultrasonic detection: move the installed ultrasonic transmitter and ultrasonic receiver synchronously from back to front or from front to back, and perform ultrasonic testing on the formation strength at each moving position during the movement process; step 3, Boulder treatment: Blast the boulders in front of the cutter head of the shield machine. The method of the invention has the advantages of simple steps, reasonable design, convenient realization and good use effect, and can solve various defects and deficiencies existing in the boulder detection method adopted in the existing shield tunneling construction.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1

Convenient and fast stamping die

ActiveCN110125254ASmooth crossingEnsure weighing capacityShaping toolsEngineeringMechanical engineering
The invention relates to a convenient and fast stamping die. The convenient and fast stamping die comprises an upper die seat and a lower die seat. A die handle is arranged on the top surface of the upper die seat. An upper back plate is arranged below the upper die seat. A male die fixing plate is arranged below the upper back plate. A lower back plate is arranged above the lower die seat. A female die is arranged above the lower back plate. A blanking plate is arranged above the female die. A damping mechanism is arranged between the upper die seat and the lower die seat. A cavity is formedin the inner bottom face of the lower die seat. A mounting block body is arranged in the cavity through fixing bolts. A power mechanism is arranged at the center inside the mounting block body. Movingmechanisms are correspondingly arranged at the two ends inside the mounting block body. By the adoption of the convenient and fast stamping die, although a steel material makes the stamping die havea large weight, the stamping die is still easy to handle under the action of the moving mechanisms; when it is necessary to handle the stamping die by a small distance, it is not necessary to use a forklift or a crane, and the resources and energy are saved; the stamping die can also successfully cross obstacles; and the weighing capacity of the lower die seat is ensured.
Owner:太仓市富飞尔五金制品有限公司

Construction method of enclosure structure with ultra-short underground walls

The invention relates to a foundation pit project in the civil transportation construction industry, in particular to a construction method of an enclosure structure with ultra-short underground walls, wherein the enclosure structure is used for a foundation pit therebelow which is used for the construction of leading a tunnel to pass through a shield zone, and the method comprises the following steps: carrying out trench forming construction according to the size of each pair of the ultra-short underground walls to be constructed, wherein the bottom of the dug trench section is positioned not less than 0.5m above the top of a shield; then hoisting and placing a steel bar cage and filling concrete in the trench section for constructing the pair of the ultra-short underground walls; further carrying out the trench forming construction between the ultra-short underground walls for constructing the trench section which is vertical to the ultra-short underground walls, wherein the bottom of the trench section is leveled with the bottom of the trench section of the ultra-short underground walls; and hoisting and placing the steel bar cage and filling the concrete in the trench section for constructing transverse underground wall short walls. The construction method has the advantage of ensuring the smooth passing through of the shield at later stage; compared with the traditional practice of leading the shield to pass through glass fiber bar underground walls, the shield does not need to pass through the underground walls, thereby reducing the project risk and the cost.
Owner:SHANGHAI TUNNEL ENGINEERING RAILWAY TRANSPORTATION DESIGN INSTITUTE

Medical composite hollow fiber tube and medical intervention equipment

PendingCN107296670AGuaranteed wall thicknessGuaranteed push effectStentsSurgeryFiberEngineering
The invention provides a medical composite hollow fiber tube. The medical composite hollow fiber tube comprises an inner layer, an outer layer and a middle reinforced layer, wherein the inner layer and the outer layer are hollow and coaxially nested, and the middle reinforced layer is arranged between the inner layer and the outer layer and comprises an axial telescopic knitting layer and reinforced fibre; the axial length of the middle reinforced layer is smaller than the axial length of the inner layer and the outer layer. Due to the specific structure of the medical composite hollow fiber tube, not only can the pushing performance and the support force of the tensile strength of the tube be ensured, but also the bendability and flexibility of the tube can also be greatly improved; medical intervention equipment manufactured by using the medical composite hollow fiber tube has better bending performance, so that it is ensured that the medical intervention equipment can smoothly pass through circuitous and tortuous blood vessels without folds; the medical intervention equipment is provided with a developing function through the arrangement of a developing ring so as to meet comprehensive performance requirements of the medical intervention device of minimally invasive blood vessels to the outer tube of a conveyor system.
Owner:ACCUPATH MEDICAL JIAXING CO LTD

Enclosure structure with ultrashort underground wall

The invention relates to a civil engineering traffic construction industry foundation pit project, in particular to an enclosure structure of the foundation pit which is used under the foundation pit and carries out the shield structure zone tunnel crossing construction; the enclosure structure with the ultrashort underground wall comprises underground walls, steel supports, reinforced concrete supports and reinforced concrete enclosing purlins which are arranged among the underground walls, and is characterized in that the underground wall of the foundation pit in the crossing section range of the shield structure is the ultrashort underground wall, the wall toe of which is arranged under the top of the shield structure by no less than 0.5m; the short wall support of the underground wall embedded under the bottom of the foundation pit is transversely arranged between every pair of ultrashort underground walls at both sides of the foundation pit; the wall toe of the short wall support of the underground wall is flush with the wall toe of the ultrashort underground wall; the enclosure structure has the advantages that the enclosure structure can ensure the smooth crossing of the later stage shield structure, and compared with the traditional shield structure which passes through the glass fiber reinforced plastic underground wall, the enclosure structure reduces the risk and construction cost of the project.
Owner:SHANGHAI TUNNEL ENGINEERING RAILWAY TRANSPORTATION DESIGN INSTITUTE

Pipe jacking cover excavation construction method penetrating through existing dense anchor cable area

ActiveCN113266362ARestore road trafficSolve the problem of not being able to block for a long time and pass through the anchor cable group area smoothly through pipe jacking constructionMining devicesUnderground chambersArchitectural engineeringStructural engineering
The invention discloses a pipe jacking cover excavation construction method penetrating through an existing dense anchor cable area. The pipe jacking cover excavation construction method comprises the steps of rotary excavating pile construction, ground unloading, Larsen steel sheet pile construction, jet grouting pile construction, crown beam construction, top plate construction, remaining anchor cable cutting, concrete circular pipe empty pushing jacking, soil body backfilling and the like. The road traffic can be recovered as soon as possible, and anchor cable structures in the jacking pipe crossing section can be completely and thoroughly removed; a pipe jacking machine can be prevented from being clamped due to winding of steel strands, construction safety is guaranteed, the economy is reasonable, the construction efficiency is improved, and pipe jacking can penetrate through the existing anchor cable obstacle area as quickly and smoothly as possible; and the waterproof problem in a water-rich stratum in the foundation pit excavation and anchor cable breaking process can be solved, it can be guaranteed that the pipe jacking penetrates through the existing anchor cable obstacle area smoothly, reference experience is provided for pipe jacking construction to penetrate through the anchor cable area, and particularly construction experience is provided for pipe jacking construction to penetrate through the anchor cable area where the road traffic is urgently needed to be recovered.
Owner:THE THIRD CONSTR CO LTD OF CTCE GRP +1

Control method of multi-terminal offshore wind power flexible direct current sending-out system

PendingCN113067363AControl power exchangeControl power flowElectric power transfer ac networkPower exchangeControl manner
The invention provides a control method of a multi-terminal offshore wind power flexible direct current sending-out system. The power exchange on the connecting lines among the multi-terminal systems can be effectively controlled through a control mode of superposing the compensation amount of the active power on the direct current voltage loop through a shore station control strategy, meanwhile, the two point-to-point systems can adopt the same control strategy, selection and switching between the control strategies are not needed, and smooth transition of the systems under various working conditions is guaranteed. The power flow among the multi-end systems is better controlled on the premise of solving the coordination control problem of the multi-end systems. Through an energy consumption device DBS control strategy, the energy consumption device can play a better role in the fault period, the system is helped to smoothly pass through the fault, when an alternating current system of a shore station at one end of the multi-end offshore wind power direct current sending-out system has a low-voltage fault, the DBS system needs to be used for absorbing surplus energy according to the fault condition, and meanwhile, the influence on other double-end systems can be ensured to be as small as possible.
Owner:XIDIAN POWER RECTIFIER XIAN +1

Method for constructing foundation pit with circulating steel supports

The invention provides a method for constructing a foundation pit with circulating steel supports. The method for constructing the foundation pit with the circulating steel supports comprises the following steps that a construction area of the foundation pit is divided into a plurality of sections in the length direction of the foundation pit, and each section of the construction area of the foundation pit is sequentially subjected to vertical support structure construction, enclosing purlin installation, steel support installation and foundation pit excavation section by section, the verticalsupport structure construction comprises the steps of embedding two rows of vertical support structures on two sides of the construction area of the foundation pit in the length direction of the foundation pit, and the tops of the vertical support structures are exposed to the earthwork of the foundation pit; the enclosing purlin installation comprises the steps that the enclosing purlins are arranged on the opposite inner sides of the exposed tops of the each row of the vertical support structure in the length direction of the foundation pit; and the steel support installation comprises thesteps that the steel supports are detachably installed between the purlins on two sides; and after the excavation of the foundation pit in the each section of the construction area of the foundation pit, the steel supports used in the completed section are removed on the purlins as the steel supports for the construction of the next section of the construction area of the foundation pit. The steelsupports of the invention can be used in a circulating mode and have good economy.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Construction Method of Foundation Pit with Turnable Steel Support

The invention provides a foundation pit construction method with steel supports that can be turned over, comprising the following steps: dividing the foundation pit construction area into a plurality of sections along the length direction of the foundation pit, and vertically erecting the foundation pit construction area of ​​each section section by section. The construction of the support structure, the installation of purlins, the installation of steel supports and the excavation of the foundation pit, the construction of the vertical support structure includes two rows of vertical support structures buried on both sides of the foundation pit construction area along the length direction of the foundation , the top of the vertical support structure is exposed in the earthwork of the foundation pit; the installation of the purlins includes setting the purlins along the length direction of the foundation pit on the relative inner side of the exposed top of each row of the vertical support structure; The steel support installation includes detachable installation of steel supports between the purlins on both sides; after the excavation of the foundation pit in the foundation pit construction area of ​​each section is completed, the steel supports used in the completed section are removed on the purlins, as Steel support is used for the construction of the next foundation pit construction area. The steel support of the invention can be used repeatedly and has good economical efficiency.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products