The invention discloses a whole-process leakage-plugging and well-cementing design method for a high-temperature and high-pressure ultra-deep well. The whole-process leakage-plugging and well-cementing design method sequentially comprises the following steps: A,
pigging, calculating the annular total circulating pressure loss during
pigging circulation, and using the annular total circulating pressure loss as stratum pressure
bearing capacity; B, according to the stratum pressure
bearing capacity, calculating the running speed of a casing
pipe or a
tail pipe, and then running a casing
pipe string or a
tail pipe string; C, according to the stratum pressure
bearing capacity, calculating the
drilling fluid circulating displacement after running the casing pipe or the
tail pipe, and then circulating a
drilling fluid; D, calculating the flow-plugging critical displacement during
cement-injecting operation; E, calculating the safe critical displacement during the
cement-injecting operation; F, according to the flow-plugging critical displacement and the safe critical displacement during the
cement-injecting operation, determining the actual operation displacement, performing the flow-plugging and cement-injecting operations, and sequentially injecting a spacer fluid, a
cement slurry and a
slurry replacing fluid. By the whole-process leakage-plugging and well-cementing design method, guidance can be provided for plugging and well cementation of deep and ultra-deep wells so as to ensure that the ultra-deep
well cementing operation is successful and improve the well-cementing quality.