Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

91results about How to "Improve reinforcement strength" patented technology

Method for solving disengagement and water seepage of internal arch of tunnel

The invention relates to a method for overcoming tunnel defects, in particular to a method for solving disengagement and water seepage of an internal arch of a tunnel. The method includes the steps that a detection radar is utilized for detecting the disengagement position and the position of a water seepage channel in a damaged tunnel, a grouting hole is obtained by drilling a hole in the surface of a lining of the disengagement position, a grouting pipe is installed in the grouting hole and extends into the disengagement position, a first grouting hole of which the diameter is greater than that of an outlet of the water seepage channel is obtained by drilling a hole in the outlet of the water seepage channel, and a first grouting pipe is arranged in the first grouting hole in a sealed and matched mode; grout is injected into the grouting hole and the first grouting hole, the grout filling situation inside the disengagement position and the water seepage channel is detected in real time through the detection radar, and grouting is stopped when the disengagement position and the water seepage channel are filled with the grout; after the grout is solidified and reaches the final strength, multiple longitudinal slots and multiple transverse slots which extend from the outline to the periphery are formed in the surface of the lining; all the slots are filled with grout, the grout is solidified; the disengagement position and the adjacent portions surrounding the disengagement position are fixed and strengthened, and water accumulated in the water seepage channel is drained.
Owner:JIANGSU DINGTAI ENG MATERIAL

Wastewater treatment composite filler containing zeolite and pulverized fuel ash

The invention relates to a wastewater treatment composite filler containing zeolite and pulverized fuel ash, which is prepared by non-sintered technique and has the main raw materials of the zeolite and the pulverized fuel ash. The filler is used for treating organic matter, ammonia nitrogen and nitrate nitrogen in the wastewater, and has excellent performance and easily obtained raw materials with low price; the preparation technique of the filler is simple and free from pollution. Zeolite powder with the fineness of 80 meshes and the pulverized fuel ash reaching national first-grade standard are utilized for preparing porous spherical ceramsite type composite filler by a pelletizer, so that the composite filler has high ammonia nitrogen removing rate and better strength and can well meet the requirements of water quality advanced treatment. The preparation technique is simple and free from pollution and opens up a new approach for the utilization of the zeolite and the pulverized fuel ash, thus having the advantages of energy conservation and emission reduction as well as good environmental and economical benefits since the pulverized fuel ash discharged from a thermal power plant can be recycled.
Owner:NORTHEAST DIANLI UNIVERSITY

Application of menthol and derivatives thereof as cultural relic excavation site reinforcing material

InactiveCN101962911AHas sublimation propertiesEasy to removeVegetal fibresMentholOrganic solvent
The invention relates to application of menthol and derivatives thereof used as novel materials for the site temporary reinforcement of fragile cultural relics in the process of cultural relic excavation and a reinforcing method thereof. The reinforcing method comprises the following steps of: covering a fiber fabric on a cultural relic fragment to be reinforced; heating, melting or dissolving the menthol or the derivative thereof into an organic solvent; sprinkling or coating the obtained fusant (solution) on the covered fabric; and after solidifying the fusant or volatilizing the solvent in the solution, obtaining a temporary reinforced body. The obtained solid can be directly removed from the site and can not be broken or damaged. If a menthol derivative reinforcing agent needs to be removed, the reinforced body is just heated so that the reinforcing agent is volatilized. The invention is suitable for the extraction of shed colour paintings in the terracotta warriors and is also suitable for protective extraction of stone cultural relic fragments, rock paintings and wall paintings and the extraction of lacquer cultural relic fragments, wooden cultural relic fragments, paper cultural relics and cotton fibre cultural relics.
Owner:SHANGHAI INST OF ORGANIC CHEM CHINESE ACAD OF SCI +2

Installation technology of inner separation wall body

The invention discloses an installation technology of an inner separation wall body. The installation technology comprises the following steps of: locating and despooling; installing U-shaped locating clamping pieces; continuously installing wallboards; and taking out wedge blocks: wherein when the U-shaped locating clamping pieces are installed, at least more than two U-shaped locating clamping pieces are installed on a structural wall column along a vertical direction, installing grooves of all the U-shaped locating clamping pieces are arranged in a row on the vertical direction, multiple interval wedge blocks, of which the top surfaces can be pressed tightly to a beam board, are knocked between the bottom surface of a first wall board and a floor board, and multiple gaps formed between the floor board and the wall board are respectively filled with mortars. By adopting the installation technology disclosed by the invention, multiple U-shaped locating clamping pieces can be arranged in a row in the vertical direction and can be fixedly arranged on the surface of the structural wall column when the first wall board of a wall body is installed, the first wall board can be then located by the U-shaped locating clamping pieces, the first wall board can be quickly located, the time and the labor are saved, and the flatness and the verticality of the wall boards are ensured.
Owner:中山建华墙体材料有限公司

Method for utilizing combined structure to conduct shield tunnel strengthening

The invention relates to a method for utilizing a combined structure to conduct shield tunnel strengthening. The method comprises the following steps that steel bar planting is conducted on the inner surfaces of tunnel original duct pieces; steel bar nets are arranged at the inner sides of the tunnel original duct pieces, and the steel bar nets are fixed to the planted steel bars; steel plates matched with the shapes of the tunnel original duct pieces of the tunnel are produced, and cotters are welded at the outer sides of the steel plates; the steel plates are closed to the tunnel original duct pieces, concrete is poured between the steel plates and the tunnel original duct pieces, the concrete fixes the steel bar nets to the inside, and the concrete is cured to a designed strength. Compared with the prior art, the combined structure including the steel plates, the steel bar nets, the planted steel bars, cotters and the concrete is adopted to shield tunnel strengthening for the first time. The method for utilizing the combined structure to conduct shield tunnel strengthening has the advantages that the durability is good, material drawing is convenient, construction is rapid, the economic benefit is good, the strengthening degree is high, the strengthening rigidity is large, and fissure controlling is efficient.
Owner:上海同禾工程科技股份有限公司

Construction method of demolition and safety force transfer for tunnel initial support deformation clearance interfering section

The invention discloses a construction method of demolition and safety force transfer for a tunnel initial support deformation clearance interfering section. The construction method comprises the steps that 1, grouting reinforcement of an arch wall is performed, specifically, an arch wall of the tunnel initial support deformation clearance interfering section is subjected to grouting reinforcement; 2, construction section division is performed, specifically, the tunnel initial support deformation clearance interfering section is divided into a plurality of construction sections from the rear to the front in the extension direction of a tunnel, and the construction sections comprises first-stage construction sections or second-stage construction sections and the first-stage construction sections and the second-stage construction sections are distributed in a staggered mode; 3, temporary concrete lining construction is performed, specifically, a temporary concrete lining is constructed in each second-stage construction section; 4, the construction of the demolition of initial supports and the safety force transfer of the first-stage construction sections is performed; and 5, the construction of the demolition of the initial supports and the safety force transfer of the second-stage construction sections is performed. According to the construction method of the demolition and thesafety force transfer for the tunnel initial support deformation clearance interfering section, surface support is realized by temporary support of the temporary concrete linings, the reinforcement strength is large, the safety risk is greatly reduced, and multiple working faces can be synchronously subjected to the construction of the demolition of the initial supports and the safety force transfer; and the construction progress is great and the construction process is safe and reliable.
Owner:CHINA RAILWAY FIRST GRP CO LTD

Novel reinforcing device for reinforced concrete bridge pier and construction method thereof

The invention discloses a novel reinforcing device for a reinforced concrete bridge pier, which comprises two U-shaped steel hoop parts in corresponding buckling, and bolt pre-tightening parts applying prestressing force to the steel hoop parts, wherein ends of the two steel hoop parts are respectively and correspondingly welded together to form a closed hoop matched with the periphery of the bridge pier; and FRP sheets are fixedly and continuously adhered on the outer side of the steel hoop parts in the length direction. According to the invention, due to the adoption of the technical scheme, the novel reinforcing device originally integrates the FRP sheets with good tensile strength and the steel hoop parts with good plastic deformation performance; with the steel hoop parts, the stress lagging condition is avoided, and the features of the FRP sheets can be fully utilized, and accordingly, the comprehensive reinforcing strength of the device is effectively improved. Meanwhile, with the corrosion resistance and durability of the RFP sheets, the steel hoop parts can be effectively protected. The invention also provides a construction method for the novel reinforcing device, which is clear and simple in procedures and high in construction efficiency.
Owner:HUAQIAO UNIVERSITY +1

Repairing method and grout for tunnel defects

The invention relates to a repairing method for tunnel defects. The repairing method includes the steps that detection radar is used for detecting the position of a cavity and the position of a passage where water burst happens in a defective tunnel; drilling is performed on the surface of a lining at the cavity position to obtain a grouting hole, a grouting pipe is installed and extends into the cavity position, drilling is performed on an outlet of the passage where water burst happens to obtain a first grouting hole of which the diameter is larger than that of the outlet of the passage where water burst happens, and a first grouting pipe is matched inside the first grouting hole in a sealed mode; grouting is performed on the first grouting hole and the grouting hole, the detection radar is used for detecting grout filling conditions inside the cavity and the passage where water burst happens in real time, and when the cavity and the passage where water burst happens are filled with grout, grouting is stopped; after the grout solidifies and reaches final strength, multiple longitudinal grooves and transverse grooves formed by extending outlines around are formed in the surface of the lining; all the grooves are filled with the grout, and the grout solidifies; the cavity and adjacent parts around the cavity are fixed and strengthened, and accumulated water in the passage where water burst happens are drained.
Owner:JIANGSU DINGTAI ENG MATERIAL

Novel reinforcing device for reinforced concrete bridge and bridge deck, and construction method thereof

The invention discloses a novel reinforcing device for a reinforced concrete bridge and a bridge deck. The novel reinforcing device comprises a U-shaped steel hoop part used for tightening the reinforced concrete bridge from the bottom up, and two bolt parts which are fixedly embedded below the bridge deck and respectively connected with two ends of the steel hoop part, wherein the bolt parts are locked with the steel hoop part through the support nuts. Due to the adoption of the technical scheme, the novel reinforcing device can pre-tighten and lock together the reinforced concrete bridge and the bridge deck through the connecting of the steel hoop part and the bolt parts in a matched manner. Compared with the prior art, the novel reinforcing device has the advantages that a stress lagging effect of a traditional device can be effectively avoided, maintains the effectiveness of the anchoring, ensures reinforcing effect, improves the shear strength of the reinforced concrete bridge, is simple in structure and easy to implement, and strong in comprehensive practicability. The invention also provides a construction method for the novel reinforcing device, which is clear and simple in procedures and can improve the construction efficiency of the novel reinforcing device.
Owner:HUAQIAO UNIVERSITY +1

Tunnel second lining micro crack reinforcement method

The invention discloses a tunnel second lining micro crack reinforcement method which is applied in the technical field of tunnel lining reinforcement. The tunnel second lining micro crack reinforcement method includes the steps of substrate treatment, bottom layer construction, uneven correction, underlayer carbon fiber composite material construction and surface layer carbon fiber composite material construction. The problems that a current method for reinforcing a micro crack of a second lining of a tunnel is low in construction efficiency, the structural durability is not good, the reinforcement strength is not high, the replacement is not easy, and even the tunnel lining structure can be subjected to secondary damage. The tunnel second lining micro crack reinforcement method utilizesa resin material, that is, an adhesive resin and a carbon fiber composite material are used together for forming a CFRP. The CFRP is attached to the concrete surface of a cracked second lining, and through the synergistic work of the CFRP and the concrete, the stiffness, yield load and ultimate bearing capacity of a structure are significantly increased. As the carbon fiber composite material hasthe characteristics of corrosion resistance, high strength, light weight and non-magnetic properties, the second lining structure achieves the purpose of crack sealing, high reinforcing strength and good durability.
Owner:ROAD & BRIDGE INT +1

Foundation dynamic compaction and replacement combined dynamic compaction reinforced construction method

The invention relates to a foundation treatment method, in particular to a foundation dynamic compaction and replacement combined dynamic compaction reinforced construction method. The method comprises the steps that a construction area is dug, wherein at the bottom elevation of -0.9 m of a box culvert foundation, and aiming at improving the bearing force of a foundation obtained after box culvert foundation dynamic compaction treatment, the original ground is dug for 2.5 m, and then construction of dynamic compaction is started; sloping is carried out on the gradients of the two sides of a foundation trench according to the proportion of 1:1.5; according to the geologic features of a backfill sand land area of an iron and steel base, a 4,000KN.m dynamic compaction and replacement process is adopted for reinforcing a deep soil layer of 3 m to 9 m, and the foundation bearing force of the deep soil layer is improved; after dynamic compaction and replacement are completed, 3,000KN.m dynamic compaction is used for reinforcement, a deep soil layer of 0-6 m is reinforced, the foundation bearing force of the shallow soil layer is improved, the strength of a substratum soil layer of 0-2.3 m on the bottom face of a box culvert is improved, and therefore soil is reinforced in the vertical direction; flower arrangement is adopted in pile point arrangement, that is, dynamic compaction reinforcement is carried out between compaction points obtained after dynamic compaction and replacement, soil between piles is transversely compact, and therefore the foundation bearing force of the soil between the piles is improved, and the soil is reinforced in the transverse direction. As for large-area foundation treatment, construction speed is high, and limitation is small.
Owner:SHANGHAI BAOYE GRP CORP

Telescopic door and window reinforcing device

The invention provides a telescopic door and window reinforcing device. The telescopic door and window reinforcing device is directly fixed to a frame of the door and window to be reinforced through arectangular reinforcing sleeve without large-scale reconstruction of the door and window to be reinforced, and the application is convenient; a plurality of blade turning rain guiding mechanisms canform a telescopic structure by two telescopic mechanisms, and the opening and closing operation flexibility of the telescopic door and window reinforcing device is improved; a space occupancy rate islow in a folding state, and the adaptability is wide; the telescopic structure can adjust the ventilation and light transmission of the door and window, and the sturdiness and durability of the door and window are not changed, and the door and window reinforcing device has the functions of rainwater buffering and diversion; a reverse E-shaped blade can realize the rainwater buffering and diversionunder the impact of rainstorm, and the overall reinforcing strength of the device can be improved effectively. The blade turning rain guiding mechanisms are composed of upper spokes, lower spokes, middle spokes, spoke brackets and blades, etc., so the device has strong wind and rain resistance in a closing state.
Owner:JIANGSU UNIV OF SCI & TECH IND TECH RES INST OF ZHANGJIAGANG

Rock cross-cut coal uncovering method with horizontal jet grouting piles for reinforcement

The invention discloses a rock cross-cut coal uncovering method with horizontal jet grouting piles for reinforcement. The method is applicable to medium-thickness coal seams with outburst risks and includes the steps: stopping tunneling when a minimum normal distance between a working face of coal uncovering and an uncovered coal seam is smaller than 7m; using a drilling rig for drilling holes, penetrating a coal seam roof, in the working face of coal uncovering; connecting with a gas extraction pipe for gas extraction; when gas content and gas pressure are reduced to permitted ranges, using a jet grouting pile machine for realizing horizontal jet grouting of each drill hole to form firm horizontal jet grouting piles in the drill holes, so that coal seam reinforcement range is widened while coal seam reinforcement strength is improved greatly, and coal seam outburst risks are reduced; after the horizontal jet grouting piles are thoroughly solidified, continuing to tunnel until a whole coal uncovering process is finished. The rock cross-cut coal uncovering method with the horizontal jet grouting piles for reinforcement has the advantages of safety and quickness in completion of coal uncovering operations and reduction of input of manpower, material resources and financial resources.
Owner:CHINA UNIV OF MINING & TECH

Surface-layer fast solidification method for soft foundation with dredger soil

The invention relates to a surface-layer fast solidification method for a soft foundation with dredger soil. The surface-layer fast solidification method includes steps of delimiting a construction region with the certain area and erecting a safe construction channel on the periphery of the construction region; laying two layers of non-woven fabrics on a soil surface in the construction region; building a shallow-layer water drainage plate; then distributing filter tubes among the non-woven fabrics to be used as water drainage channels and connecting submersible type vacuum pumps onto the filter tubes to realize vacuum water drainage; laying plastic membranes on the tops of the upper-layer non-woven fabrics to be used as air closure membranes; observing settlement on the membranes in a vacuum water drainage process and draining water accumulated on the membranes in time; using vibrators on the air closure membranes in good time to increase vibration load in the middle of a water drainage solidification period, and wrapping non-woven fabrics on the vibrators to realize membrane protection during vibration; and completing surface-layer solidification after bearing capacity of the solidified soil reaches 50Kpa or meets designed requirements. By the aid of the method, a work period can be shortened, work procedures such as work cushioning and the like are omitted, waste recovery of the soil is realized, solidification speed is fast, an effect is good, and assembly line production can be realized.
Owner:连云港港口工程设计研究院有限公司

Detachable integrated ceiling lamp assembly type reinforcing structure

The invention discloses a detachable integrated ceiling lamp assembly type reinforcing structure. The detachable integrated ceiling lamp assembly type reinforcing structure comprises a plate body, wherein two fixing plates are symmetrically and fixedly connected to the upper surface of the plate body, sliding rails are welded to the tops of the two fixing plates, square pipes are connected to theouter side walls of the two sliding rails in a sliding mode, four connecting plates b are symmetrically welded to the upper surfaces of the two square pipes, four threaded holes b are symmetrically formed in the upper surfaces of the four connecting plates b, and a disc is welded to the upper surface of the plate body. According to the detachable integrated ceiling lamp assembly type reinforcing structure, two lead screws can be driven to rotate by rotating two shells before installation, the lead screws can drive the two square pipes to slide in the sliding rails after rotating, so that the distance between the square pipes is adjusted to be matched with the distance between the installation positions of a ceiling lamp, after adjustment, fixing is carried out through threaded holes a in the disc and the threaded holes b in the four connecting plates b, and two top installation fixing structures are provided through the disc and the connecting plates b so as to enhance the stability and the reinforcing strength of the top fixing of the lamp.
Owner:GOLD MANTIS FINE DECORATION TECH SUZHOU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products