The invention discloses a production and construction project soil profile pattern and an improving method thereof. The production and construction project soil profile pattern sequentially comprisesa surface soil layer, a rock
scrap layer, a gravel layer and
bed rocks from top to bottom, the thickness of the surface soil layer is 10-90cm, the thickness of the rock
scrap layer is 40-70cm, and thethickness of the gravel layer is larger than 20cm. According to the improving method, loose deposition objects of the production and construction project are divided into gravels, rock scraps and soil, and the gravel layer, the rock
scrap layer and the surface soil layer are sequentially stacked on the
bed rocks according to types of plants to be recovered to form the soil profile pattern suitable for
plant growth. According to the method, site conditions of vegetations in a production and construction
project area can be effectively kept, quick
recovery of the vegetations can be facilitated,
recovery effect and stability in the vegetations in the production and construction
project area are improved, and the soil and
water conservation effect of the vegetations is exerted as soon as possible.