Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

70 results about "Land rehabilitation" patented technology

Land rehabilitation is the process of returning the land in a given area to some degree of its former state, after some process (industry, natural disasters, etc.) has resulted in its damage. Many projects and developments will result in the land becoming degraded, for example mining, farming and forestry.

Optimization method of simultaneous harvest and reclamation opportunity based on mining subsidence simulation and second ploughing rate

The invention discloses an optimization method of simultaneous harvest and reclamation opportunity of single coal layer based on mining subsidence simulation and second ploughing rate, relates to dynamic mining subsidence prediction and GIS (Geographic Information System) analysis processing, and belongs to the field of mining technology, land utilization and land rehabilitation, and the method is used for solving the problem of unstable mining subsidence land reclamation and realizing the simultaneous harvest and reclamation of underground coal mine regions. The method comprises the steps of: considering the subsidence visual simulation of landform before mining, the ground subsidence scene simulation of time domain and the optimization of the simultaneous harvest and reclamation opportunity based on the second ploughing rate on the basis of onsite file collection and analysis and based on a probability integral method and a mining subsidence predict of Knothe time function. The method disclosed by the invention performs dynamic scene simulation and reclamation opportunity optimization on the subsidence to determine the optimal reclamation opportunity under special mining conditions and natural conditions, thereby rescuing the precious surface soil resources of plain mining areas to the uttermost and planning, protecting and treating the lands to be suffered from subsidence damage in advance, so as to improve the reclamation rate, reduce the reclamation cost, promote the sustainable utilization and sustainable development of mining area land resources, and guarantee the coordination and synchronous development of coal resource mining and cultivated land protection.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Comprehensive recovery method of gold ore resource containing molybdenum multi-metal

The invention discloses a method for comprehensively recovering molybdenum-containing polymetallic gold ore resources, which comprises the following steps: firstly, crushing and grinding molybdenum-containing gold ores first, performing floatation on useful metallic elements to obtain bulk concentrate by a complete mixing floatation method, and discarding tailings; secondly, leaching out and recovering gold and silver from the bulk concentrate by CCL carbon paste wet-method gold leaching technology, and using tailings after gold leaching for preferred selection of molybdenum in the next step; thirdly, performing preferred separation and floatation of the molybdenum on the gold leaching tailings to obtain qualified molybdenum concentrate; fourthly, activating molybdenum-selecting tailings, and performing separation and floatation of lead to obtain lead concentrate; fifthly, performing separation and floatation of copper on lead-selecting tailings to obtain copper concentrate; and sixthly, performing floatation of sulfur on copper-selecting tailings to obtain sulfur concentrate, performing filtration and backwater circulation on sulfur-selecting tailings, and applying the sulfur-selecting tailings to the carbon paste wet-method gold leaching technology for recovery of the gold and the silver. The method greatly improves the grade of separated metals. The following products can be obtained by utilization of the method: more than or equal to 95 percent of alloyed gold, more than or equal to 45 percent of the molybdenum concentrate, more than or equal to 40 percent of the lead concentrate and more than or equal to 35 percent of the sulfur concentrate. The tailings after floatation are filtered by a ceramic filter (the moisture content is less than or equal to 15 percent), subjected to dry-type stacking, and used for soil sealing and land rehabilitation in late stage.
Owner:LINGBAO CITY JINYUAN MINING

Method for reclaiming collapsed land of mines

InactiveCN102972112AAddressing the lack of organic soils suitable for plant growth conditionsSave the post-processing linkTreatment with aerobic and anaerobic processesSoil-working methodsSludgeFilling materials
The invention relates to a method for reclaiming collapsed land of mines. Coal gangue, building wastes, living wastes, excess sludge and clay are used as filling material and are directly filled into a collapsed basin, and are mixed with water to generate organic filling soil, the excess sludge and the stored water are formed into an oxidizing pond to treat production wastewater, living sewage and wastes, so the problem of the reclaimed land lacking of organic soil suitable for plant growing is solved; the problem of land occupation for the storage of the coal gangue and the filling of the wastes and the excess sludge is solved; the excess sludge directly flows from a sludge concentrated tank of a sewage treatment plant, so the subsequent treatment procedure of the sludge is omitted, and the running cost of the sewage treatment plant is reduced; and meanwhile, the standard emission of the treated sewage is realized, or the requirement of the water quality of the reclaimed water which is reclaimed for the production and living of the coal mines is met. The method has the advantages that the operation is convenient, the investment is little, and the reclaiming cost is low. The method is especially suitable for reclaiming the collapsed land with large area in the large mines.
Owner:CHANGZHOU UNIV

Process for treating free alkali in red mud by microorganisms

The invention relates to a process for treating free alkali in red mud by microorganisms. The process comprises the steps of: injecting red mud in a stirring tank in percentage by weight after size mixing; adding an acid solution containing domesticated lactic acid bacteria or thiobacillus ferroxidans, controlling the temperature, pressure and a pH value, filtering ore pulp after being treated by microorganisms to obtain a microorganism-containing solution and red mud after being treated by the microorganisms, and sending filtrate to a microorganism culture tank for continuing culturing the microorganisms, wherein the free alkali in the red mud is less than 0.95 percent, and reaches the requirement of land rehabilitation. The process has the beneficial effects that the acid used by the process is microorganism organic macromolecule weak acid, thus compared with a treatment method using inorganic acid or alkali in the prior art, the process has the advantages of reducing cost, being high in rate of removing the free alkali, short in period, simple in process, low in cost, few in impurities in leachate, low in equipment corrosion rate, convenient for storage and transportation, and beneficial to culture and recycling of microorganisms in a subsequent solution; the treated red mud filter cake contains less than 0.95 percent of free alkali, the environmental harm to the soil is reduced, and the land rehabilitation and utilization can be performed.
Owner:JILIN JIEN NICKEL IND +1

Earthwork balance based dike-pond layout method used for coal mining while refilling in coal-mining subsidence

The invention relates to an earthwork balance based dike-pond layout method used for coal mining while refilling in a coal-mining subsidence, belonging to the technical field of the mining technique, land utilization and land rehabilitation. The method which is mainly suitable for a single coal layer comprises the steps of: obtaining a subsidence section line of each section by combining probability integral way based coal-mining subsidence prediction with a geographic information system; determining stripping and refilling ranges of multiple earthworks sequentially at equal distances from the edge of a subsidence basin to the center of the subsidence basin based on each subsidence section line, and further estimating an earthwork stripping amount and an earthwork refilling amount within the stripping and refilling ranges; when the earthwork stripping amount is nearly equal to the refilling amount, regarding the determined stripping and refilling ranges as the optimal dike-pond space layout. When determining the optimal earthwork stripping region and the refilling region, the earthwork balance based dike-pond layout method used for coal mining while refilling in the coal-mining subsidence protects and utilizes the land resource to the maximum extent, improves a second plowing rate to the maximum extent, reduces reclamation cost per mu, and ensures harmonious development of exploitation of mineral resources and land protection to create harmonious and green mines.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Technological method for achieving soil water content classified identification through geological radar technology

The invention discloses a technological method for achieving soil water content classified identification through a geological radar technology. The technological method comprises the four parts of data preprocessing, soil water content parameter extraction, neural network classified identification and result display. Data preprocessing comprises the steps of null line correction, wavelet transformation and lowpass filtering. Soil water content parameter extraction comprises the steps that the power spectrum of reflection signals is solved with an autoregression moving average spectrum estimation method, data normalization is conducted, feature vectors and feature values of the power spectrum are extracted with a principle component analyzing method, and a sample feature vector database is constructed. Neural network classified identification comprises the steps that a neural network is trained through sample feature vectors, the trained mature network is used for conducting classified identification on data to be identified. Result display comprises the step that classified results are mapped and displayed. According to the technological method for achieving soil water content classified identification through the geological radar technology, automatic fast classified identification of the water content of soil is achieved, and a guiding function is performed on land detection and land rehabilitation.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Method for dynamically filling coal mining subsidence area with Yellow River sediment

ActiveCN109372511AAlleviate conflicts between people and landIncrease the area of ​​cultivated landUnderground miningSurface miningTime functionMining engineering
The invention provides a method for dynamically filling a coal mining subsidence area with Yellow River sediment and belongs to the technical field of mining, land utilization and land rehabilitation.The method for dynamically filling the coal mining subsidence area with the Yellow River sediment comprises the steps that according to a mining plant and the geological conditions of the coal miningsubsidence area, mining units are marked out, based on a Knothe time function, dynamic subsidence isopleths of all the mining time intervals of each mining unit are obtained by means of a probabilityintegral method; according to the rehabilitation range, each filling unit is marked out; the rehabilitation filling moment of the whole rehabilitation range Dt on the earth surface and the rehabilitation designed elevation of each filling unit are sequentially determined; the filling manner of the subsidence area is selected to be multi-layer repeated Yellow River diverting filling, and the features of each soil structure are determined; the number of times of multi-layer repeated Yellow River diverting filling of each filling unit and the filling time interval between two filling units are determined; the thickness of each type of soil structure layers is determined; according to the above determined filling parameters, multi-layer repeated Yellow River diverting filling is conducted oneach filling unit. By the adoption of the method for dynamically filling the coal mining subsidence area with the Yellow River sediment, the cultivated land rate can be greatly improved, and the rehabilitation period is shortened.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Underwater terrain inversion method for coal mining subsidence ponding area by utilizing InSAR monitoring data

The invention discloses an underwater terrain inversion method for coal mining subsidence ponding area by using InSAR monitoring data. The method comprises the steps: firstly obtaining SAR images before and after the subsidence of a research area and DEM data before the subsidence of the subsidence area, and obtaining surface subsidence information after subsidence through employing the D-InSAR technology; solving a probability integral method parameter of a working surface according to the surface subsidence information and parameters such as working surface angular point coordinates, miningthickness and inclination angle; and finally, inverting the dynamic change of the underwater topography of the subsidence area and the final form of the underwater topography after stopping mining byadopting a model based on a probability integral method. According to the method, the InSAR data acquisition cost is low; the surface subsidence data obtained by the D-InSAR technology is high in precision and large in data volume; the parameter inversion is based on semi-measured data, a parameter inversion result is suitable for the research area, the underwater topography of a ponding area in the mining process of a working face can be inversed, the establishment of an amphibious composite ecosystem of the subsidence area is guided, and an important reference is provided for land utilization planning, land reclamation, ecological restoration and the like of the land surface of the subsidence area.
Owner:ANHUI UNIVERSITY

Open pit coal mine rock dump-based waste rock soil formation method for land reclamation

The invention belongs to the technical field of ecological environment control and discloses an open pit coal mine rock dump-based waste rock soil formation method for land reclamation. The waste rocksoil formation method is a technique as follows: on the basis of evaluating and calculating lithologic differences and spatial distribution of different sedimentary rocks on a minable seam of an openpit coal mine, staggered excavation and classified stripping are carried out on different types of rocks (waste rocks) on the minable seam; the waste rocks are transported and stacked at different positions of a rock dump (waste dump) in a classified manner; layered compaction is carried out; and existing weathered coal, carbonaceous shales, shales, mudstones and the like of the open pit coal mine are stacked on a surface layer to replace soil for land reclamation, and are mixed and fermented with kitchen wastes and household wastes of mine workers for nutrification and organification, thereby completing waste rock soil formation. A treatment method for waste rock soil formation, waste rock reclamation and household waste harmless treatment of the workers for green mining is achieved; a novel soilless land reclamation mode for land reclamation of the open pit coal mine is innovatively formed; and the waste rock soil formation method has great environmental effect, economic effect andsocial effect.
Owner:XIAN CENT OF GEOLOGICAL SURVEY CGS

Equipment system for processing and utilization of low-grade sandstone

The invention discloses an equipment system for processing and utilization of low-grade sandstone. The equipment system comprises vibrating screens, feeding machines, a jaw crusher, a PYFB1636-type cone crusher, a PYFB1313-type cone crusher and a screening machine, wherein the vibrating screens, the feeding machines, the jaw crusher, the PYFB1636-type cone crusher, the PYFB1313-type cone crusher and the screening machine are sequentially connected; a coarse material outlet of the screening machine is connected in a raw material converging position at the front ends of the vibrating screens, and is connected in a material collecting position used for land rehabilitation; a fine material outlet of the screening machine is connected in the position of a fine material storage bucket. The equipment system disclosed by the invention has the advantages that the effects of simplicity and convenience in use are achieved, low-grade quartz sandstone is subjected to hierarchical crushing treatment and is screened, so that quartz sand with smaller granularity is used for manufacturing cement and steel, and quartz sand with larger granularity is re-crushed or subjected to land rehabilitation, therefore the low-grade quartz sandstone is effectively utilized, and the economic benefits are improved.
Owner:安徽牛山新型材料科技有限公司

Iron ore waste-rock yard land rehabilitation integral regulation method

The invention discloses an iron ore waste-rock yard land rehabilitation integral regulation method comprising the following steps: cleaning large size rocks and foreign materials on the waste-rock yard land surface, keeping original roads and public & auxiliary facilities, and leveling the waste-rock yard land and slopes and rolling out; keeping and reconstructing original draining systems according to plans, and newly constructing water supply and power supply facilities; building a retaining wall, an apron wall, a waterway, and / or catch water drain on a slope with easy water and soil floating; covering an iron ore open pit mining erosive rehabilitation pile-up topsoil layer with a thickness of at least 40cm on a compacted platform and a slope, leveling and naturally depositing the soil;building a sprinkling facility on a platform, and covering a humus soil of at least 5cm on a planting soil surface layer, and planting city greening normal tree species; digging planting pits with theline spacing of at least 1.5m*1.5m on other platforms and smooth slopes, setting an impervious layer on the bottom, refilling the rehabilitation pile-up topsoil, and finally planting fast-growing forest trees. The iron ore waste-rock yard land rehabilitation integral regulation method is low in rehabilitation cost, high in land treatment rate, and stable in post-rehabilitation geology, and has sustainable benefits.
Owner:YUXI DAHONGSHAN MINING

Boron tailings planting soil and preparation method thereof

The invention provides boron tailings planting soil, which is mainly prepared from the following raw materials in parts by mass: 60-80 parts of seabed sludge, 30-40 parts of industrial residues, 25-35parts of de-alkalized boron mud ceramsite sand, 3-5 parts of boron-magnesium fertilizer and 6-8 parts of compound fertilizer. The boron tailings planting soil enables the performance of a ceramsite sand product prepared by using boron mud to be more stable, and avoids or reduces the problem that the free magnesium oxide causes the alkali returning and bursting to the ceramsite product. Furthermore, when being used for planting soil, the prepared de-alkalized boron mud ceramsite can be used as a carrier material due to the unique microporous structure, and water and trace elements such as nitrogen, phosphorus and potassium are slowly released, so that the utilization rate of water and fertilizer is increased. In addition, wastes such as feldspar tailings, gold tailings, coal series kaolinite, the industrial residues and the seabed sludge are widely used in abandoned mine land reclamation projects, so that the problems of land resource occupation and environmental pollution are reduced,and the effective utilization ways of resources are improved.
Owner:DALIAN DEETOP ENVIRONMENTAL TECH CO LTD

A kind of vegetation recovery method of dump site in acid mine area

ActiveCN108541522BStrong ability to survive adversityAlleviate the status quo of rapid degradation of improvement effectSuperphosphatesExcrement fertilisersRevegetationLivestock manure
The invention relates to the technical fields of land reclamation, ecological reconstruction and soil and water conservation and discloses a vegetation recovery method for a soil discharging field inan acidic mining area. The method includes the following steps of S1, adjusting the pH of soil, wherein a neutralizing agent is applied to topsoil of the acidic waste soil of the soil discharging field, the pH of the soil is less than 4, uniform stirring is conducted until the pH of the soil is 5.0-7.5, and the thickness of the topsoil is greater than 25 cm; S2, applying a nutrient supplement agent, wherein nitrogen fertilizer and phosphate fertilizer are applied to the topsoil in step S1 and stirred uniformly; S3, applying an organic material, wherein the organic material is applied to the topsoil and stirred uniformly after step S2 is completed to obtain improved soil with the soil conductivity of 2.5 ms cm<1> or below, and the organic material is plant straw powder or livestock manure;S4, planting pioneer plants on a soil improved layer in S3, wherein the pioneer plants can grow normally on the improved soil. By adopting an improvement method of cooperatively applying limestone powder, the organic material and the inorganic fertilizer, the cost is low, and the improvement effect is good.
Owner:SOUTH CHINA AGRI UNIV

A method of dynamically filling coal mining subsidence land with sediment from the Yellow River

ActiveCN109372511BAlleviate conflicts between people and landIncrease the area of ​​cultivated landUnderground miningSurface miningSoil scienceEngineering
The invention provides a method for dynamically filling a coal mining subsidence area with Yellow River sediment and belongs to the technical field of mining, land utilization and land rehabilitation.The method for dynamically filling the coal mining subsidence area with the Yellow River sediment comprises the steps that according to a mining plant and the geological conditions of the coal miningsubsidence area, mining units are marked out, based on a Knothe time function, dynamic subsidence isopleths of all the mining time intervals of each mining unit are obtained by means of a probabilityintegral method; according to the rehabilitation range, each filling unit is marked out; the rehabilitation filling moment of the whole rehabilitation range Dt on the earth surface and the rehabilitation designed elevation of each filling unit are sequentially determined; the filling manner of the subsidence area is selected to be multi-layer repeated Yellow River diverting filling, and the features of each soil structure are determined; the number of times of multi-layer repeated Yellow River diverting filling of each filling unit and the filling time interval between two filling units are determined; the thickness of each type of soil structure layers is determined; according to the above determined filling parameters, multi-layer repeated Yellow River diverting filling is conducted oneach filling unit. By the adoption of the method for dynamically filling the coal mining subsidence area with the Yellow River sediment, the cultivated land rate can be greatly improved, and the rehabilitation period is shortened.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Comprehensive recovery method of gold ore resource containing molybdenum multi-metal

The invention discloses a method for comprehensively recovering molybdenum-containing polymetallic gold ore resources, which comprises the following steps: firstly, crushing and grinding molybdenum-containing gold ores first, performing floatation on useful metallic elements to obtain bulk concentrate by a complete mixing floatation method, and discarding tailings; secondly, leaching out and recovering gold and silver from the bulk concentrate by CCL carbon paste wet-method gold leaching technology, and using tailings after gold leaching for preferred selection of molybdenum in the next step;thirdly, performing preferred separation and floatation of the molybdenum on the gold leaching tailings to obtain qualified molybdenum concentrate; fourthly, activating molybdenum-selecting tailings,and performing separation and floatation of lead to obtain lead concentrate; fifthly, performing separation and floatation of copper on lead-selecting tailings to obtain copper concentrate; and sixthly, performing floatation of sulfur on copper-selecting tailings to obtain sulfur concentrate, performing filtration and backwater circulation on sulfur-selecting tailings, and applying the sulfur-selecting tailings to the carbon paste wet-method gold leaching technology for recovery of the gold and the silver. The method greatly improves the grade of separated metals. The following products can be obtained by utilization of the method: more than or equal to 95 percent of alloyed gold, more than or equal to 45 percent of the molybdenum concentrate, more than or equal to 40 percent of the lead concentrate and more than or equal to 35 percent of the sulfur concentrate. The tailings after floatation are filtered by a ceramic filter (the moisture content is less than or equal to 15 percent), subjected to dry-type stacking, and used for soil sealing and land rehabilitation in late stage.
Owner:LINGBAO CITY JINYUAN MINING

Dynamic construction elevation determination method for mining while rehabilitating area

The present invention relates to a dynamic construction elevation determination method for a mining while rehabilitating area, and belongs to the technical fields of mining technologies, land utilization and land reclamation. The method comprises: predicating dynamic subsidence in stages by using a probability integration method; considering an original elevation of the ground surface and stimulating a dynamic subsidence status of the ground surface in all stages; according to a local natural socio-economic situation, determining a reclamation elevation in the mining while rehabilitating area; considering a scope of a cultivated land in a mining while rehabilitating spatial layout and local water table buried depth and determining the scope of a cultivated land dynamic construction position; and finally, according to the reclamation elevation and ground surface subsequent subsidence, determining the dynamic construction elevation in the mining while rehabilitating area. In the method, a scope of the reclamation area, a situation of ground surface subsidence, the subsequent subsidence and the reclamation elevation are considered comprehensively during construction of mining while rehabilitating area, thereby determining the dynamic construction elevation in the mining while rehabilitating area. The method is easy to understand, easy to be used to guide project construction, and provides powerful support for field implementation of a mining while rehabilitating technology.
Owner:CHINA UNIV OF MINING & TECH (BEIJING)

Open pit mine steep slope ecological restoration structure and restoration method

The invention discloses an open pit mine steep slope ecological restoration structure and a restoration method, and particularly relates to the technical field of ecological restoration and land reclamation. The open pit mine steep slope ecological restoration structure comprises first vegetation bags located on the top and the bottom of a slope. A steel wire net and vine plants are laid at the position, between the two first vegetation bags, of the slope. Anchors are arranged between the steel wire net and the slope. Nutrient soil is laid below the vegetation bag at the bottom of the slope. The vine plants are arranged on the nutrient soil. A second vegetation bag is arranged on one side of the nutrient soil, retaining walls are arranged on one side of the second vegetation bag at intervals, the positions between the retaining walls and the second vegetation bag are filled with planting soil, and vegetation is arranged on the planting soil. By the adoption of the technical scheme, theproblem that an existing mine slope cannot retain water and nutrients in soil, so that the vegetation dies off is solved, and the open pit mine steep slope ecological restoration structure and the restoration method can be used for large-gradient slope restoration.
Owner:中国建筑材料工业地质勘查中心湖南总队
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products