The present application relates to the technical field of construction safety management, and discloses a construction safety penetration type management multi-stage linkage
early warning system.The
system comprises a management layer, an execution layer and a work layer node.The management layer generates a global safety strategy, the execution layer decomposes and issues tasks, and the work layer collects on-site multi-
modal safety data, including equipment vibration characteristics, environmental
image flow, personnel positioning trajectory and safety operation records.The
system first analyzes the changes in equipment vibration characteristics, divides stable and abnormal working condition periods, and selects high-risk areas according to the difference amount;in each high-
risk area, the safety state deviation of the work layer node is calculated in combination with the task identifier and the environmental
image flow;then, the responsibility trace weight is generated according to the spatio-
temporal correlation and deviation of the personnel trajectory and operation
record in the abnormal period;finally, the root node is selected according to the weight, multi-
modal data is associated to construct a
safety risk propagation tree, and multi-stage linkage precise safety management is realized.