The invention relates to a high-side wall concrete construction joint zero-defect construction method. A poured bin side joint is polished to be flat, circumferential
cutting is carried out at the side joint to form a construction joint, the construction joint and a
grinding area are cleaned, a double-faced
adhesive tape is attached to the flat
grinding area. before pouring of a to-be-poured bin,a trolley template, the
cutting joint and the double-faced
adhesive tape are pressed and sealed, the trolley template is controlled to compress the thickness of the double-faced
adhesive tape, and therefore the trolley template and the poured bin side joint are closely attached without seam face fracturing. The high-side wall concrete construction joint zero-defect construction method overcomes the problems that the
joint angle of an original high side wall lining construction joint has defects,
lap joint sealing is not good, and the
lap joint opportunity selection deviation has defects, and the beneficial effects that the
lap joint is tight, the
joint angle of the construction joint is free from defects, jointing and sealing are good, during pouring of the to-be-poured bin, fracturing ofthe side joint is not prone to generating,
slurry seepage is not prone to happening, and operation is simple and convenient to achieve are achieved.