Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

100results about How to "Play a pulling role" patented technology

Dust exhausting device for textiles

InactiveCN105908471ATo achieve the effect of preliminary dust removalPlay a pulling roleMechanical cleaningPressure cleaningEngineeringIon
The invention relates to the field of textiles, and especially relates to a dust exhausting device for textiles. With the dust exhausting device, fluff, dust or threads on the surface of textile fabric can be cleaned effectively to ensure smooth conduction of next working procedure. The dust exhausting device comprises a working bin which has a feed port and a discharge port. The inner top of the working bin is equipped with a winding-up roller through a first support near the left end, the surface of the winding-up roller is equipped with a hairbrush, and the hairbrush is equipped with a plurality of hooks. A second support is arranged at the right side of the first support, a scraper is hinged to the bottom of the second support, and a tension spring is arranged between the left side of the scraper and the bottom of the second support. A negative ion generator is arranged at the right side of the second support through a third support, and a flat plate is arranged at the bottom of the negative ion generator. A nozzle is obliquely arranged at the right side of the flat plate, and the nozzle is connected with an external hairdryer. The dust exhausting device for textiles is simple to operate and easy to use, and is applicable to a variety of places.
Owner:SUZHOU COMFORT TEXTILE NEW MATERIALS TECH CO LTD

Pressure-relief type automatic multi-buffered reset explosion door

The invention discloses a pressure-relief type automatic multi-buffered reset explosion door, and relates to the field of a coal mine ventilation system. The explosion door comprises a sealing base, two side vertical plates, two slant opening doors and a tension spring component, wherein the tension spring component comprises two tension spring mounting seats and a tension spring; the tension spring mounting seats are connected to the outer sides of the slant opening doors; the two ends of the tension spring are connected with the tension spring mounting seats respectively; a driving shaft and a driven shaft are supported between the two side vertical plates and are both connected with a group of crank gear link mechanism; each group of crank gear link mechanism comprises two gears, two cranks and two links; one end of each crank is connected with one gear, and the other end of each crank is hinged to one end of one link; the other end of each link is hinged to one slant opening door respectively; the gear on the driving shaft is engaged with the gear on the driven shaft; one end of the driving shaft is connected with an electromagnetic clutch, a speed reducer and a motor in sequence. According to the door, pressure relief and timely reset can be realized, and the two doors are synchronously opened and closed.
Owner:YANGZHOU JIANGLONG MINING EQUIP +1

Electric power facility protection supervision and control system and use method thereof

The invention discloses an electric power facility protection supervision and control system and a use method thereof, and belongs to the field of power management and control. The invention disclosesan electric power facility protection supervision and control system and a use method thereof. A one-way expansion air bag is arranged at a joint of a cable bus, upon occurrence of an accident, the one-way expansion air bag can be intelligently controlled to expand. Meanwhile, under the action of the non-elastic inhibition ropes which are transversely arranged, the one-way expansion air bag intelligently performs longitudinal expansion along the direction of the longitudinal connection part of the cable. Therefore, in the process of continuous expansion, the two plug-in type joints are disconnected, power-off effect is automatically realized. The situation that accidental dangerous cases continue to spread is prevented, secondary damage is reduced, and safety is improved. Meanwhile, wheninflation continues to be conducted, the one-way expansion air bag can burst, so that the pre-breaking ball point can be scattered outwards along with the non-elastic restraining rope and hit againsta nearby object to be broken, insulating oil can overflow from the interior of the pre-breaking ball point, and the insulativity and the safety after the cable bus is broken are effectively guaranteed.
Owner:肖安南

Scale clearing device for of vacuum bottle liner based on elastic deformation

The invention discloses a scale clearing device for a vacuum bottle liner based on elastic deformation, and relates to the technical field of living goods. The scale clearing device for the vacuum bottle liner based on elastic deformation comprises a connecting block, the top of the inner wall of the connecting block is fixedly connected with a telescopic mechanism, and sliding grooves are formedin the positions, on the left and right sides of the telescopic mechanism, of the front and rear sides of the inner wall of the connecting block correspondingly; the inner walls of the sliding groovesare slidably connected with sliding blocks, the surfaces of the sliding blocks are sleeved with supporting mechanisms, and the surfaces of the supporting blocks are slidably connected with the innerwall of the connecting block. According to the scale clearing device for the vacuum bottle liner based on elastic deformation, a rubber belt is expanded, thus a brush is in a semicircular shape and makes contact with the bottom of the inner wall of the liner, the clearing device is rotated, the scale at the bottom of the inner wall of the liner is cleared through the brush, and thus the problems that at present, a bottle opening of the vacuum bottle liner is small, the bottom of the vacuum bottle liner is in a semicircular-ball shape, a brush head of an existing brush cannot make contact withthe bottom of the liner, and the liner cannot be cleared completely are solved.
Owner:涡阳县华腾日用化学品有限公司

Double-tube raft frame

The invention discloses a double-tube raft frame which comprises ropes which are provided with anchors. The ropes are connected with a pair of floating tubes which are arranged in parallel. Each floating tube is in a closed hollow structure. Sink type mesh pieces are arranged at the lower side of each floating tube. A control device which is capable of charging air or discharging the air for the floating tubes is connected with the end portion of each floating tube. Balance floating balls are arranged on the floating tubes between the mesh pieces in a berthing mode. The mesh pieces are capable of effectively hanging and loading shellfish to conduct concentrated aquaculture. The double-tube raft frame is capable of well resisting waves by adopting the inflatable floating tubes. When stormy waves are heavy, the double-tube raft frame is capable of draining off water and sinking to avoid the stormy waves. The long and narrow structure is relatively beneficial for reducing tractive effort of directional water current. When the floating tubes are sunk at the bottom, the balance floating balls play a role of pulling and are capable of preventing the floating tubes from rupturing due to overlarge gravity. The double-tube raft frame has the advantages of being low in cost, resistant to high flow rate and high waves, firm in structure, high in aquaculture capacity and good in water flow performance.
Owner:浙江海洋学院普陀科学技术学院

Embedded anchoring type concrete crack repairing process

The invention discloses an embedded anchoring type concrete crack repairing process, and belongs to the technical field of concrete repairing. A repairing rod is inserted into a repairing groove cavity, a plurality of transverse anchoring rods with the inner ends bonded with inner embedded rods are distributed on the end wall of an outer inserting rod from bottom to top, after a heated crack repairing agent is injected into the repairing groove cavity through the inner embedded rods, the inner embedded rods are heated to enable the inner ends of the transverse anchoring rods to be separated from the inner embedded rods and the outer inserting rod in sequence, a plurality of transverse anchoring rods are embedded into the crack repairing agent, the outer tip ends of the transverse anchoringrods are inserted into the repairing groove cavity to achieve the anchoring effect, then the outer inserting rod is pulled out upwards, secondary material injection is carried out, a concrete supplementing layer is formed in the crack repairing cavity, the inner embedded rods, a conical material guide part and the plurality of transverse anchoring rods are embedded into the repairing groove cavity, and the multiple transverse anchoring rods are distributed up and down, so that the transverse bonding degree between the concrete supplementing layer and the repairing groove cavity and the overall mechanical strength are effectively enhanced to a certain extent.
Owner:高洋

Weak connection structure of super high-rise corridor

The invention relates to a weak connection structure of a super high-rise corridor. The weak connection structure includes the corridor and a main building. The main building includes an upper body and a lower body. Concrete corbels are integrally formed on the outer side wall of the lower body, and the bottom surface of the corridor is fixed with an extension column. The weak connection structureincludes sliding supports fixedly connected to the top surfaces of the concrete corbels, the top surfaces of the sliding supports are fixedly connected first hinge supports, and the top surfaces of the first hinge supports are fixedly connected with first connecting rods. The ends, away from the first hinge supports, of the connecting rods are fixedly connected with second hinge supports, and thesecond hinge supports are fixedly connected to the bottom surface of the corridor. The outer side wall of the concrete corbels are fixedly connected to third hinge supports, the bottom surface the extension column is fixedly connected to fourth hinge supports, second connecting rods are rotatably arranged between the third hinge supports and the fourth hinge supports, and a traction mechanism isarranged between the upper body and the corridor. The weak connection structure has the effects of reducing the large displacement of the corridor caused by strong wind and earthquake at the time of realizing the weak connection and improving the safety between the corridor and the main building.
Owner:广东现代建筑设计与顾问有限公司

Original-soil and in-situ slurrying-based underground wall construction method

ActiveCN108104112AEasy to construct and manufactureQuality is easy to controlBulkheads/pilesSlurryEngineering
The invention relates to the technical field of underground construction and discloses an original-soil and in-situ slurrying-based underground wall construction method. The original-soil and in-situslurrying-based underground wall construction method comprises the following steps of a, performing a grooving process, b, during the grooving process, injecting water into soil via a high-pressure pipe through a grooving machine, then performing stirring to form slurry, performing multi-spot sampling, detecting the density of slurry samples through a slurry densitometer, injecting water to adjustthe density of the slurry, performing sampling and detecting processes until the density of the slurry reaches a required density rho, and c, transversely and monolithically pouring a first wall piece on a support plate, after the first wall piece is formwork-removed, sinking the top surface of the first wall piece through a hoist till being level to the ground, and transversely and monolithically pouring a second wall piece on the first wall piece, wherein the second wall piece and the first wall piece are longitudinally overlapped, and sequentially transversely and monolithically pouring and sinking a plurality of wall pieces and son on in the identical manner until underground wall construction is completed. An underground wall constructed according to the original-soil and in-situ slurrying-based underground wall construction method is high in quality, free from leakage and secondary construction and capable of greatly reducing the construction cost and shortening the constructionperiod.
Owner:章胜南 +2

Beer fermentation equipment convenient to clean

The invention discloses beer fermentation equipment convenient to clean. The beer fermentation equipment comprises a fermentation vat body, wherein a feed port is formed in the upper part of the top of the fermentation vat body, liquid inlets are formed at the two sides of the feed port, a feeding hopper is connected to the feed port, a flow dividing table fit to the inner wall of the feeding hopper is arranged in the feeding hopper, a plurality of flow dividing holes penetrating through the top surface and the bottom surface of the flow dividing table are formed in the flow dividing table, amaterial mixing cylinder is connected to the lower part of the feed port, a spiral material mixing plate is arranged on the inner wall of the material mixing cylinder, a stirring shaft is connected tothe bottom of the fermentation vat body, a fermentation material frame with an opening in the top is connected to the side wall of the stirring shaft, the side wall and the bottom surface of the fermentation material frame are both of grid structures, an opening in the bottom end of the material mixing cylinder directly face the opening in the top of the fermentation material frame, and brush bristles are uniformly arranged on the outer wall of the fermentation material frame. According to the beer fermentation equipment, materials can be uniformly fed, and the mixing uniformity of the materials can be improved, so that the materials can be uniformly mixed in the continuous moving process, and meanwhile, the inner wall of the vat body can be cleaned conveniently.
Owner:德阳亚比斯企业管理咨询有限公司

Aluminum honeycomb plate suspended ceiling

The invention discloses an aluminum honeycomb plate suspended ceiling which does not cause structural damage to an aluminum honeycomb plate and can be disassembled for recycling. The aluminum honeycomb plate suspended ceiling is characterized in that four edge banding strips are spliced end to end to form a rectangular frame, and an aluminum cellular plate is arranged in the rectangular frame; each edge banding strip comprises a first plate body, wherein the top surface of the first plate body protrudes to form a first buckle, the first buckle is used for being inserted into a triangular keelto be fixed, the outer surface of the bottom of the first plate body protrudes to form two opposite second plate bodies, the two second plate bodies are used for clamping and fixing the edge of the aluminum honeycomb plate, and the edge of the second plate body at the upper portion is bent to form a hook-shaped downward third plate body; a safety piece comprises a seventh plate body, the two endsof the seventh plate body are bent to form V-shaped clamping plates, and the V-shaped clamping plate on one side of the first plate body is bent downwards and extends to form a hook-shaped eighth plate body; and the two ends of the top of the triangular keel are embedded between the two V-shaped clamping plates to be clamped and fixed, and the eighth plate body is hooked on the third plate body tobe pulled and fixed.
Owner:FSILON BUILDING MATERIAL TECH CO LTD

Train gripping mechanism of large roller coaster

The invention relates to a train gripping mechanism of a large roller coaster, which is amusement equipment. A car body and a hook head, a rotating shaft, a hook head and a guard plate are fixed in order to rotate a block. A rotating shaft is movably connected with a movable support. The extended end of the movable support is movably connected with a runner through a shaft pin. The extended top center position of the movable support is fixed with one end of another tension spring, the other end of another pull spring and the car body. The extended top end position of the movable support is fixed with one end of another tension spring, the other end of another pull spring and the guard plate. The extended top end position of the movable support is movably connected with the upper end of the pull rod, the lower end of the tie rod and the pulling block through the shaft pin. The pulling block is fixed by the screw through the guard plate chute and the rotating block. The rotating block is positioned in the round U groove of the hook head and movably connected. The slide block and the slide pin are movably connected with the ball, the hook through the hole and the ball, the top pin slide. There is a compression spring placed on the rear end of the top pin in the through hole. The rear end of compression spring in the through hole of the hook is connected with a screw thread. A pendant is put in a block U groove. The train gripping mechanism of the large roller coaster is a gripping mechanism, and has the advantages of being artful in structure and good in effect.
Owner:BEIJING SHIBAOLAI AMUSEMENT EQUIP

Spliced composite slab structure

The invention relates to the technical field of buildings, and discloses a spliced composite slab structure. The structure comprises a first composite slab and a second composite slab; the first composite slab comprises a first prefabricated slab, a first cast-in-place composite layer and a first welded steel bar frame; the second composite slab comprises a second prefabricated slab, a second cast-in-place composite layer and a second welded steel bar frame; a first stressed steel bar assembly and a first connecting steel bar net are arranged between the first composite slab and the second composite slab; the first prefabricated slab abuts against the second prefabricated slab; and the first cast-in-place composite layer and the second cast-in-place composite layer are integrated by pouring. According to the structure, the first welded steel bar frame and the second welded steel bar frame are of integral grid steel bar structures and play a role in welding fixing so that the thicknessof the first prefabricated slab and the second prefabricated slab can be reduced when being manufactured, the anti-shearing effect is evenly achieved, a large number of steel bars do not need to be bound on site, the workload on a construction site is greatly reduced, and the construction efficiency is improved.
Owner:ELITE ARCHITECTURAL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products