An embodiment of the invention provides a scheduling
management system for garbage cans. The scheduling
management system can comprise compartment-detachable garbage
truck, the multiple networked garbage cans, a
network service platform, a request terminal, a scheduling terminal and a transport terminal. The compartment-detachable garbage
truck capable of providing garbage clearing service is determined by the scheduling terminal according to garbage can clearing requests and garbage
truck state information, garbage can clearing scheduling commands can be transmitted to the transport terminal, and the full networked garbage cans can be loaded in the compartment-detachable garbage truck after the garbage can clearing scheduling commands are acquired by garbage transport staffs via the transport terminal. The scheduling
management system in the embodiment of the invention has the advantages that the problem that existing garbage cans are not filled with garbage or are overfilled with the garbage when manually cleared is solved, and the garbage clearing efficiency can be improved; the scheduling management
system can have automatic garbage can forecasting clearing functions, and the garbage cans can be managed in a centralized manner; the garbage transport staffs can selectively
handle the garbage cans at fixed points by the aid of information on the
network service platform as needed, the garbage can inspection frequencies can be reduced, and the clearing cost can be lowered.