The invention provides a quick installation method for fully-mechanized coal mining equipment of a fully-mechanized coal mining face. The quick installation method comprises the following steps that 1, preparation work is conducted; and 2, equipment installation is conducted, and the specific steps comprise that 21, scraper installation is conducted, specifically, a system winch is used for hitting and conveying a scraper chute car to the position of an upper-opening four-corner-channel, and then a cut-hole opposite-pull winch is used for hitting and conveying the scraper chute car to a corresponding position of installation; and then a hydraulic crane is utilized to hoist the chute car to be separated from an installation forklift, after the installation forklift is hit away, the crane continues to hoist and rotate, and the chute car is installed to be in place; and 22, installation of hydraulic supports is conducted, specifically, after hitting, conveying and installing of a working face scraper and a coal machine are completed, a cut-hole upper-opening winch is used for hitting and conveying a hydraulic forklift to pass a four-corner channel to be parked in front of the winch, the hydraulic forklift is parked to be stable and hidden to be compact, and it is ensured that a support car can be smoothly hit and conveyed to the four-corner channel; and then the hydraulic supports are installed sequentially. The fully-mechanized coal mining face equipment is installed and dismantled by using mechanized equipment, the labor intensity of employees is relieved, the working efficiency is further improved, and a future development direction of installation and demolition of fully-mechanized coal mining equipment is pointed out.