The invention provides a method for preventing and controlling
rock burst through energy release modification of a deep well high-stress main roadway
coal pillar, and belongs to the technical field ofmining. The method comprises the following steps: firstly, large-
diameter pressure relief drilling is implemented, to release accumulated
elastic energy of a
coal mass; secondly, ultrahigh-pressure fixed-point
hydraulic fracturing is carried out in the large-
diameter drill hole, the complete
coal pillar is cracked, and the
energy storage capacity of the main roadway
coal pillar is weakened; then,grouting reinforcement is carried out on the fractured main roadway
coal pillar, the strength of the main roadway
coal pillar is improved, and the
impact threshold value is increased; and finally, reinforcing support is implemented, and the
impact resistance of the main roadway coal pillar is improved. According to the method, the
elastic energy accumulated by the main roadway coal pillar is released, the physical and mechanical properties of the main roadway coal pillar are changed, the
impact threshold of the main roadway coal pillar is improved, the
elastic energy accumulated by the high-stress main roadway coal pillar can be effectively reduced, and the problem that after pressure relief of the main roadway coal pillar, the strength is reduced, and surrounding rock
large deformation is likely to happen is solved.