The present invention provides a bored
pile construction process and a construction device applied thereto, belonging to the technical field of drilling construction, including assembling a ground main frame, pulling a steel
wire rope obliquely around the ground main frame, reinforcing the ground main frame, starting a second driving device on the ground main frame to drive a hollow
drill rod to move vertically downward, and simultaneously starting a first driving device to drive an outer
drill tube and an inner
drill on a drill seat at the lower end of the hollow drill rod to rotate and drill holes, passing water through nozzles around the drill seat so that water is continuously ejected from the nozzles, and simultaneously starting detection cameras around the drill seat to take pictures, cleaning a
slag discharge pipe and a hollow drill rod, moving the drill seat to the bottom of the bored
pile hole, and connecting
cement mortar at the end of the
slag discharge pipe so that the
cement mortar passes from the hollow drill rod and the inner drill into the bored
pile hole, and using the reverse rotation vibration of the outer drill tube and the inner drill to vibrate and compact the
cement mortar until the bored pile hole is filled with the
cement mortar, thereby completing the construction of the bored pile. The present invention can greatly improve the construction efficiency and construction quality.