Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

74results about How to "Reliable simulation" patented technology

Method for simulating GPS signal dynamic receiving environment and system thereof

The invention provides a method for simulating GPS signal dynamic receiving environment and a system thereof. The method comprises the following steps: reading satellite ephemerides and establishing asatellite motion model according to the current time; solving receiver carrier attitudes; calculating the incident direction of a satellite signal according to the receiver carrier attitudes and determining each visible satellite; calculating the transmission delay, the transmission error, the Doppler shift and the signal transmission error of the satellite signal; and generating an analog signal. The satellite motion model is established according to the satellite ephemerides, the receiver carrier attitudes are solved in the satellite motion model, and the incident direction of the satellitesignal is calculated by the solution structure of the receiver carrier attitudes. Finally, the transmission delay, the transmission error, the Doppler shift and the signal transmission error of the satellite signal are acquired to generate an analog signal. The method has simple calculation process and low complexity, and better realizes the real-time performance of signal reception analysis, thereby more accurately simulating the received signal in a dynamic environment. The method for simulating GPS signal dynamic receiving environment and the system thereof are applied to the field of signal processing.
Owner:NAT UNIV OF DEFENSE TECH

Training mine for simulating actual anti-mine training

The invention discloses a training mine for simulating actual anti-mine training. The training mine is characterized in that a training mine body comprises a housing, a fuse unit, a position indication unit, a power supply module, a balancing weight and a control unit, wherein the fuse unit, the power supply module, the balancing weight and the control unit are all fixedly mounted in the housing; the position indication unit is arranged at the upper end of the outside of the housing, and a connecting ring is arranged at the lower end of the outside of the housing; a mooring system comprises a connecting mooring system and a load rejection mooring system; a swivel of the connecting mooring system is connected to the connecting ring at the lower end of the outside of the pressure-resistant housing, one end of a chemical fiber rope is connected with the rotary ring through a shackle, and the other end of the chemical fiber rope is connected with an acoustic release transponder through a shackle; the front end of an anchor chain of the load rejection mooring system is connected with the acoustic release transponder through a shackle, the rear end of the anchor chain of the load rejection mooring system is connected with a ballast anchor through an inactive rope, and a floating ball and a pouring weight are sequentially connected to the anchor chain; the position indication unit consists of a communication module, a module housing and an antenna, and the communication module is connected with the power supply module in the training mine body through a wire; and the antenna is assembled at the upper part of the module housing.
Owner:CSIC NO 710 RES & DEV INST

Simulation method and system for magnetism loss fault of permanent magnet synchronous motor and medium

The invention relates to the technical field of motors, and discloses a simulation method and a system for magnetism loss fault of a permanent magnet synchronous motor, and a medium. The authenticityand validity of the magnetism loss fault simulation of the permanent magnet synchronous motor are improved, and a more real and reliable environment is provided for the magnetism loss fault simulationof the permanent magnet synchronous motor. The method comprises the following steps of: establishing a three-phase coordinate system of the permanent magnet synchronous motor under the condition of the magnetism loss fault; calculating a first synthesized voltage of the permanent magnet synchronous motor in the three- phase coordinate system; converting the first synthesized voltage into a secondsynthesized voltage under a two-phase rotating coordinate system; determining an internal constraint condition required for model construction based on the second synthesized voltage when the permanent magnet synchronous motor has the magnetism loss fault; establishing a torque equation, a rotor motion equation, and an internal voltage equation of the permanent magnet synchronous motor accordingto the internal constraint condition under the condition of the magnetism loss fault; and constructing a magnetism loss fault simulator according to the parameters construction of the affected permanent magnet synchronous motor, and using the magnetism loss fault simulator to perform fault simulation.
Owner:CENT SOUTH UNIV

Method and system for simulating stator inter-turn short circuit fault degradation process of permanent magnet synchronous motor

The present invention discloses a method and system for simulating stator inter-turn short circuit fault degradation process of a permanent magnet synchronous motor. The method has the advantages that: by establishing a discrete model and a stator resistance time-varying model of the stator inter-turn short circuit fault state of the permanent magnet synchronous motor, and an interaction model between the stator temperature and the stator winding degradation, according to the interaction model, a stator temperature value at next moment is obtained, according to the stator temperature value atthe next moment and the stator resistance time-varying model, the state update value is obtained, and according to the state update value, the simulation process of the stator inter-turn short circuitfault degradation process of the permanent magnet synchronous motor is realized through iterative. The method and system solves the technical problem that the prior art cannot simulate the stator inter-turn short circuit fault degenerating process, can analyze the change law of operating state of the permanent magnet synchronous motor under the state of the stator inter-turn short circuit fault degradation, and provides safe, reliable and near real fault emulation and simulation for technical research on detection and diagnose of the stator inter-turn short circuit fault of the permanent magnet synchronous motor
Owner:CENT SOUTH UNIV

Urban different underlying surface disaster reduction effect analysis method

ActiveCN110287595AImprove the effect of disaster reductionReliable simulationDesign optimisation/simulationResourcesTerrainNumerical models
The invention discloses an urban different underlying surface disaster reduction effect analysis method, which comprises the following steps: step 1, simulating a ponding evolution process under rainstorm situations of different recurrence periods by adopting a two-dimensional hydrodynamic numerical model, analyzing a waterlogging risk distribution situation under urban current situation conditions, and constructing a rainstorm waterlogging calculation model; step 2, according to the current urban land utilization situation, selecting several kinds of underlying surface drainage measures at least including permeable pavement, horizontal green land and concave green land arrangement, grass planting ditch arrangement and roof greening, and analyzing the elastic waterlogging resistance effect of the underlying surface drainage measures; step 3, analyzing combined waterlogging resistance effects of different underlying surface measures; and step 4, performing cost benefit comparative analysis on the waterlogging drainage schemes of different underlying surfaces. According to the method, different types of underlying surfaces are considered on the basis of high-precision terrain, a refined model is established, and rainstorm waterlogging is reliably simulated.
Owner:TIANJIN UNIV

Fault injection method and fault injector of squirrel cage asynchronous motor rotor conducting bar

The invention relates to the technical field of motors, and discloses a fault injection method and a fault injector of a squirrel cage asynchronous motor rotor conducting bar, so as to simulate the performance degradation rule of the conducting bar in an entire crack evolution stage under the influence of temperature and provide a real and reliable simulation environment for asynchronous motor conducting bar faults. The method provided by the invention comprises the following steps: establishing a relationship between a damage rupture degree of the asynchronous motor conducting bar in a whole process from the occurrence of cracks to complete rupture and a resistance value, and meanwhile considering the influence of a temperature factor to the crack evolution to obtain a fault evolution rule of the rotor conducting bar resistance under the influence of temperature; and after the conducting bar fault is determined, replacing the conducting bar resistance corresponding to the conducting bar fault with the conducting bar resistance under normal conditions according to the varying matrix elements in an asynchronous motor multiloop mathematic model, and establishing the multiloop mathematic model of the asynchronous motor rotor conducting bar faults under the influence of the temperature for solving and implementing fault injection.
Owner:CENT SOUTH UNIV

Reverse starting test method and device for traction system

The invention discloses a reverse starting test method and device for a traction system. The method comprises the following steps that: S1, a test accompanying traction system and a to-be-tested traction system are connected with each other, so that the a reverse starting test system is constructed, the test accompanying traction system simulates the load of the to-be-tested traction system; S2, when a test is started, the reverse of the test accompanying traction system is controlled to be started, and the test accompanying traction system is controlled to operate according to control parameters calculated according to operation conditions required by the test; S3, when the test accompanying traction system operates under a specified operation working condition, the to-be-tested tractionsystem is started, a forward torque is applied onto the to-be-tested traction system, and the to-be-tested traction system and the test accompanying traction system are controlled to realize reverse twin trawling according to the torque direction of the test accompanying traction system, so that a vehicle reverse starting working condition can be simulated; and S4, the operation states of the to-be-tested traction system and the test accompanying traction system are monitored, a test result is judged. The method has the advantages of simple test operation, low implementation cost, high test reliability, good test performance and the like.
Owner:ZHUZHOU CSR TIMES ELECTRIC CO LTD

Metal layer molten pool heat transfer characteristic simulation material, preparation method and application

The invention discloses a metal layer molten pool heat transfer characteristic simulation material, and a preparation method and application thereof. The metal layer molten pool heat transfer characteristic simulation material comprises metal bismuth and bismuth iodide, and the Pr of the metal layer molten pool heat transfer characteristic simulation material under the condition of 500 DEG C is 0.08-0.12. The preparation process of the metal layer molten pool heat transfer characteristic simulation material comprises the following steps: preparing a bismuth iodide molten salt; heating the metal bismuth until the metal bismuth is completely molten, and continuously heating to a temperature T; slowly adding the prepared bismuth iodide molten salt into the molten metal bismuth for multiple times at the temperature T; and completely melting the bismuth iodide crystals on the surface layer of the metal bismuth to obtain the metal layer molten pool heat transfer characteristic simulation material. The Pr number of the metal layer molten pool heat transfer characteristic simulation material provided by the invention in a working state is 0.08-0.12, is closer to the Prandtl number of a real material; therefore, the real material of the metal layer can be simulated more accurately and reliably, the heat transfer characteristic of the metal layer of the metal layer molten pool in the reactor prototype lower end socket can be reflected more accurately, the uncertainty of the heat transfer relational expression obtained through experiments is effectively reduced, and data support is provided for formulation and implementation of a melt in-reactor retention strategy.
Owner:NUCLEAR POWER INSTITUTE OF CHINA

Metal liquid filling type flow regime viewer

The invention discloses a metal liquid filling type flow regime viewer which can be used for directly observing the cast metal liquid filling type state. The viewer is composed of an endoscope 1, a steel tube 2, a limiting clamp 3, a signal transmission line 4, a computer 5 and a die 6. The endoscope 1 is arranged in the steel tube 2, the steel tube 2 is pre-buried in the die 6, the limiting clamp 3 is clamped at one end of the steel tube 2, one end of the signal transmission line 4 penetrates through the limiting clamp 3 to be connected with the endoscope 1, and the other end of the signal transmission line 4 is connected with the computer 5. By means of the viewer, the filling type flow state when metal liquid leaves an ingate can be directly observed, reasonability of the design of a pouring system is determined, and the pouring system is optimized by adjusting parameters and the structure of the pouring system so as to enable the metal liquid filling process to reach an ideal state and overcome casting defects generated by unreasonable design of the pouring system; the viewer can be used for direct observation, is more reliable than computer simulation, safer and more convenient to use than an X-ray observation filling process, and the viewer is simple in structure and low in use cost.
Owner:HOHAI UNIV

Circuit based on linkage among access admission of card swiping machine with elevator calling and lighting and realizing method of same

The invention discloses a circuit based on the linkage among the access admission of a card swiping machine with elevator calling and lighting and a realizing method of the same. The circuit comprisesan output linkage signal module and a receipt linkage signal control module, wherein the input of the receipt linkage signal control module is connected with the output of the output linkage signal module through an outer connecting wire; the output linkage signal module comprises an access control machine, a door lock, a door-open button, a switching tube Q1, a resistor R1, diodes D1, D2 and D3and a direct current power supply; one end of the door-open button is connected to the positive pole of the direct current power supply, the other end of the door-open button is connected to the positive pole of the door lock, the negative pole of the door lock is connected to the DOOR+ end of the output switch of the access control machine, and the DOOR- end of the output switch of the access control machine is connected to the negative pole of the direct current power supply; one end of the resistor R1 is connected to the positive pole of the direct current power supply, the other end of theresistor R1 is connected to the anodes of the diodes D1 and D3 in parallel; the cathode of the diode D3 is connected to the DOOR+ end of the output switch of the access control machine; the cathode of the diode D1 is connected to the anode of the diode D2; the cathode of the diode D2 is connected to the control end of the switching tube Q1; the positive pole of the direct current power supply isconnected to the positive pole of the receipt linkage signal control module through an outer connecting wire; the high potential end of the switching tube Q1 is connected to the negative pole of the receipt linkage signal control module through an outer connecting wire; the low potential end of the switching tube Q1 is connected to the negative pole of the direct current power supply; the D3 withthe cathode being connected to the DOOR+ end of the output switch of the access control machine is placed in the circuit; and the anode of the D3 is connected to the anode of the D1. The realizing method is characterized in that when the door is opened by swiping a card through the card swiping machine and the elevator on the same floor is called at night, a sound is produced from a close distanceto enable the lighting lamp in the elevator hall to be turned on by a sound-light controlled switch, and that a sound is produced on purpose from a remote distance to enable the lighting lamp in theelevator hall to be turned on is reduced.
Owner:於铉

Method for determining electromagnetic parameters of radio wave propagation environment

The invention provides a method for determining electromagnetic parameters of a radio wave propagation environment, and the method comprises the steps: actually measuring radio propagation informationof a plurality of test points of the radio wave propagation environment, and drawing an actual measurement radio propagation environment map according to the radio propagation information; establishing a radio wave propagation environment simulation model, and simulating the simulation model by adopting a rasterization processing method to obtain a plurality of simulation radio wave propagation environment diagrams; comparing the actual measurement radio propagation environment diagram with each simulation radio propagation environment diagram to obtain a simulation radio propagation environment diagram closest to the test point; and extracting corresponding electromagnetic parameters from the radio wave propagation environment simulation model according to the obtained simulation radio propagation environment diagram closest to the test point. According to the method, the electromagnetic parameters required by ray tracking can be corrected or estimated only by performing local actualmeasurement, so that the operation complexity is reduced, and more accurate and reliable ray tracking channel simulation and channel prediction can be realized.
Owner:BEIJING JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products