The utility model relates to a direct burial
heat supply pipeline, and belongs to the technical field of municipal construction. The steel
pipe joint comprises steel
pipe joints which are welded in pairs and wrapped by heat preservation material
layers, PE outer protection
pipe joints are wrapped on the portions, corresponding to the steel pipe joints, of the outer portions of the heat preservation material
layers, an electric hot melting sleeve is wrapped in a gap between every two adjacent PE outer protection pipe joints in a sealed mode, a rubber and plastic
sponge sleeve is wrapped outside each electric hot melting sleeve, and a heat shrinkage sleeve is wrapped outside each rubber and plastic
sponge sleeve in a sealed mode. The joint
coating structure of the direct burial
heat supply pipeline is scientific in design, reasonable in structure, simple in construction and good in protection effect, joint
coating quality is improved qualitatively, and the problem that water is prone to seeping at the joint
coating position is solved, so that the temperature of a conveying medium is effectively guaranteed, shutdown or first-aid repair of a pipeline conveying
system is avoided, construction cost is saved, and construction efficiency is improved. And the economic benefit is improved.