Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

89 results about "Intertidal area" patented technology

The intertidal zone is the area where the ocean meets the land between high and low tides. A tide pool within Monterey Bay National Marine Sanctuary. Intertidal zones exist anywhere the ocean meets the land, from steep, rocky ledges to long, sloping sandy beaches and mudflats that can extend for hundreds of meters.

Pile sinking method for driving large-diameter steel pipe pile in intertidal zone

ActiveCN102425167AReduced maximum lifting capacity requirementsLifting safetyWaterborne vesselsBulkheads/pilesEngineeringStructural engineering
The invention relates to a pile sinking method for driving a large-diameter steel pipe pile in an intertidal zone. The method is characterized in that: a ship special for large-diameter steel pipe pile transportation and auxiliary pile hoisting construction is matched with a full rotary hoisting ship to realize the large-diameter steel pipe pile sinking operation as the following steps of: machining the steel pipe pile and hoisting the steel pipe pile to the special ship; positioning the hoisting ship; arranging a tilt sensor at the top of the steel pipe pile; vertically hoisting the steel pipe pile; automatically sinking the vertical steel pipe pile into the mud; hoisting a steel wire rope to automatically throw off a hook; recording the vertical reading of the steel pipe pile; and hammering the sunken pile by using a hydraulic hammer. The method has the advantages that: the ship special for large-diameter steel pipe pile transportation and auxiliary pile hoisting construction is matched with the full rotary hoisting ship to realize the large-diameter steel pipe pile sinking operation, so that the steel pipe pile of 300 to 600 tons can be easily hoisted and turned over in the air, the requirement for the maximum hoisting weight of the hoisting ship is reduced, hoisting safety and convenience are ensured and the engineering cost is greatly saved.
Owner:天津港航工程有限公司 +1

Intertidal zone simple ocean platform and construction method thereof

The invention discloses an intertidal zone simple ocean platform and a construction method thereof. The intertidal zone simple ocean platform comprises a lower pile-barrel combination foundation and an upper platform block. The lower pile-barrel combination foundation comprises four barrel-shaped foundation bodies, the four barrel-shaped foundation bodies are opposite in pairs and distributed at intervals, every two of the four barrel-shaped foundation bodies are connected with each other to form a whole, the upper portion of the outer wall of each barrel-shaped foundation body is provided with a sleeve, and the top of each barrel-shaped foundation body is provided with a positioning pillar and a water feeding/discharging valve; the upper platform block is formed by welding four stand columns to an upper-end platform plate of the upper platform block, and the lower portions of the outer walls of the four stand columns are provided with sleeving pipes matched with the positioning pillars; and when the lower pile-barrel combination foundation and the upper platform block are assembled, the four sleeving pipes of the upper platform block sleeve and fix the four positioning pillars of the lower barrel-shaped foundation bodies. The intertidal zone simple ocean platform is large in foundation rigidity, the perpendicularity of the barrel-shaped foundation bodies automatically meet requirements, the weight of each independent component is small, construction is easy and convenient, the barrel-shaped foundation bodies penetrate into a seabed with the help of the seawater weight, and the intertidal zone simple ocean platform has economy and practicability.
Owner:HEFEI UNIV

Method for planting suaeda salsa in coastal beach and application

The invention belongs to the technical field of plant planting and discloses a method for planting suaeda salsa in a coastal beach and an application. The method comprises the steps of 1, planting area selection, selecting an area suitable for planting from a mid-tide area and a high-tide area of an intertidal zone and building a wave blocking zone; 2, seeding, namely selecting temperature, seeding rate and seeding time; and 3, management after seeding, namely carrying out net covering, diversion and drainage for preventing flooding. The step 1 specifically comprises the content of selecting the area suitable for planting from the mid-tide area and the high-tide area of the intertidal zone; building the water blocking zone in a tidewater entering direction and building a dam in an offshoredirection in the planting area; or planting phragmites australis, high-stalk straws and phyllostachys pubescens in the tidewater entering direction in the planting area. According to the method, thesuaeda salsa is planted in a suitable environment on the beach, so that the growth area of the suaeda salsa is increased, the growth environment of the suaeda salsa on the beach is repaired and a support is provided for the stabilization of the biological diversity on the beach.
Owner:江苏盐城国家级珍禽自然保护区管理处

Method for arranging wind power generation equipment in shallow water of intertidal zone

InactiveCN102092645ASuitable for bulk installationImprove installation efficiencyWind energy generationCranesEngineeringBARGE
The invention discloses a method for arranging wind power generation equipment in the shallow water of an intertidal zone, which aims to solve the problems of equipment arrangement by adopting a construction method skillfully combining tracked carriers, crawler cranes, a crane ship, a barge and the like. The method is characterized by comprising the following steps that: the crane ship carries anauxiliary crane, and automatically voyages to a position with the smallest draught; the barge transports equipment comprising fan parts, the tracked carriers, platform blocks, approach bridges, a main crawler crane, an auxiliary crawler crane and the like to the position with the smallest draught; the tracked carriers transport the fan parts, the platform blocks, the approach bridges and the maincrawler crane part to a fan mounting station; the auxiliary crawler crane finishes the assembly of a construction platform at the fan mounting station and the complete main crawler crane; the main crawler crane and the auxiliary crawler crane finish the assembly and hoisting of the fan parts; and after the steps are finished, the auxiliary crawler crane disassembles the main crawler crane and theconstruction platform to a transportable weight, and the tracked carriers transport the main crawler crane and the construction platform to the next fan mounting station.
Owner:DALIAN HUARUI HEAVY IND GRP CO LTD

Intertidal zone benthonic animal layered sampler

The invention relates to an intertidal zone benthonic animal layered sampler. The intertidal zone benthonic animal layered sampler comprises a handle part and a box part of which the upper part and the lower part are opened. The handle part is T-shaped, and is connected with the box part through a locking button. Three faces of the box part are fixing vertical plates, and one face is a moveable vertical plate which can be upwards pulled out and in which a separating hole is reserved. A separating plate is inserted into the box from the separating hole. The intertidal zone benthonic animal layered sampler uses a split-type structure, and is convenient for transportation, storage and use. The T-shaped handle is used for sampling by using a hand to downwards press or sampling by using a rubber hammer to knock, the operation is simple and convenient, labor-saving, and suitable for multiple types of mud flat, such as muddy, sandy and mixed muddy and sandy. A box-type structure is used, so asampling depth is precision, and an area is accurate. The separating hole is reserved in the moveable vertical plate of the box part, and the separating plate is used for separating samples hierarchically, and a mud layer sequence is maintained, so the distribution hierarchy of benthonic animals in a mu sample is conveniently analyzed. The moveable vertical plate is used for, according to the sampling requirements, manufacturing the moveable vertical plate reserved with the different depths of the separating holes, and satisfying the different sampling hierarchical requirements.
Owner:THE FIRST INST OF OCEANOGRAPHY SOA

Monitoring device for local erosion and deposition deformation of tidal flat bed in intertidal zone

ActiveCN112880582APrevent movementRealize scour-silt deformation measurementUsing optical meansCamera lensTidal flat
The invention discloses a monitoring device for local erosion and deposition deformation of a tidal flat bed in an intertidal zone, which belongs to the technical field of micro-landform evolution monitoring. The device is scientific and reasonable, is safe and convenient to use, and comprises a monitoring assembly, a diversion assembly and a wireless signal transmission assembly. The monitoring assembly comprises at least one monitoring box, and a camera is installed in each monitoring box through a lifting shaft. A base internally provided with a storage battery is fixed to the lower portion of each monitoring box, and one side of each base is movably connected with a supporting rod for preventing the corresponding monitoring box from sinking. The monitoring box is fixed in the beach body through the base and the supporting rod, the camera lens is flush with the beach face through the lifting shaft, bed surface erosion and deposition deformation measurement in the extremely shallow water period of the tidal beach in the intertidal zone is achieved, and the problem that a traditional instrument cannot measure bed surface deformation under the extremely shallow water depth condition is solved. Scale marks for quantifying bed surface deformation are arranged on the monitoring box, so that the bed surface deformation process can be quantitatively acquired, and the bed surface deformation in the extremely shallow water period is digitalized.
Owner:HOHAI UNIV

Intelligent robot for analyzing and sampling intertidal sediments

InactiveCN113203432AEnsure safetyMeet automatic fixed-point analysis samplingWithdrawing sample devicesEndless track vehiclesTerrainRemote control
The invention discloses an intelligent robot for analyzing and sampling intertidal sediments, which comprises a crawler chassis, an observation module, a communication and positioning module, a data acquisition control module, a power supply module, an analysis module, a sampling module and the like which are fixed on an equipment bearing area in the middle of the crawler chassis, and can safely run on complex matrix terrains in intertidal zones. The observation module collects images in the advancing direction, the sampling module is used for sampling, the analysis module can obtain environment parameters, and the communication and positioning module achieves communication between the robot and a shore operation terminal. The intelligent robot can move according to a set route, can also be commanded in a remote control mode, is suitable for advancing of intertidal zone topography and salinity, can automatically collect sediment samples and automatically analyze key parameters in situ, has the functions of sending back data and images in real time and the like, meets the requirements for automatic fixed-point analysis and sampling of the intertidal zone, can greatly save manpower and other cost, personnel safety is guaranteed, and sampling analysis tasks are efficiently completed.
Owner:ZHEJIANG UNIV +1

Intertidal zone corrosion detection device for offshore wind turbine tower tube

The invention discloses an intertidal zone corrosion detection device for an offshore wind turbine tower tube. Herein, encircling measurement is carried out through a combined floating element, so that the detection device adapts tower drums with different diameters and is convenient to disassemble and assemble; the device is characterized by comprising a baffle table, a floating element and a positioning rod, wherein the floating elements are connected end to end through bolts to form a semi-floating ring; the two semi-floating rings are connected through two telescopic positioning rods to form a whole floating ring; the baffle table is located above the whole floating ring. The positioning rod is connected with the baffle table; a floating block is arranged on the positioning rod; the tower crane intertidal zone monitoring device is simple in structure, convenient to assemble and disassemble, convenient for personnel to assemble, maintain and disassemble, and capable of performing camera monitoring on a tower crane intertidal zone along with tide fall, finding tower crane corrosion traces in time, performing maintenance treatment early, and ensuring the service life and equipmentsafety of the tower drum.
Owner:江苏华淼电子科技有限公司

Satellite remote sensing quantitative evaluation method for intertidal zone erosion and deposition conditions caused by offshore wind turbines

PendingCN112381033AImprove fragmentationRealize the analysis of scour and silt statusImage enhancementImage analysisEngineeringAtmospheric sciences
The invention discloses a satellite remote sensing quantitative evaluation method for an intertidal zone erosion and deposition condition caused by an offshore wind turbine, and the method comprises the steps that a high-precision DEM reflecting the detail features of the surface microtopography of an intertidal zone is constructed through an improved remote sensing waterline method; an imaginarysand body surface discrimination method is further creatively provided, and the imaginary sand body beach face elevation under the draught-fan-free state at the draught fan point position of the intertidal zone is simulated; secondly, the elevation of the draught fan point position is extracted from the high-precision intertidal zone DEM, the elevation difference between the elevation of the draught fan point position and the elevation of an imaginary sand body beach face at the draught fan point position is calculated, the intertidal zone scouring and silting rate of the draught fan point position is quantitatively estimated, and the intertidal zone scouring and silting intensity grade caused by draught fan construction is evaluated. The method provides a feasible scheme for monitoring and evaluating the intertidal zone topographic change caused by intertidal zone wind power plant construction by using a satellite remote sensing technology, and also provides a technical support for analyzing the intertidal zone topographic change caused by an offshore small target object based on DEM data.
Owner:NANJING NORMAL UNIVERSITY

CO2 flux measurement device and method used in intertidal wetland

ActiveCN104535522AAddressing Difficulty Measuring Intertidal Wetlands EffectivelyImprove automation performanceMaterial analysis by optical meansMeasurement deviceThermodynamics
The invention relates to a CO2 flux measurement device used in intertidal wetland. The device comprises an infrared gas analyzer, a gas path and an erector, wherein the gas path is connected with the infrared gas analyzer, the erector is used for placing the infrared gas analyzer and the gas path, the gas path comprises a transparent water-touching cover and a wave protection pipe; a plurality of sharp angles are uniformly distributed on the lower edge of the water-touching cover; scales are arranged on the side wall of the water-touching cover; a level gauge is arranged on the water-touching cover; the other end of the wave protection pipe is connected with a carbon flux air chamber contact cover; the wave protection pipe is connected with a lifting rod at one side angle of the erector through a fixing ring; the erector comprises a table top and table legs; the table legs comprise fixed sections and stretching sections positioned inside the fixed sections; sharp ends are arranged at the front ends of the stretching sections; the fixed sections are connected with the stretching sections by virtue of a locking device. Based on mutual cooperation of the gas path and the erector as well as the infrared gas analyzer in the measuring device, the problem that the traditional CO2 flux measurement method for inland wetland is difficultly used for effectively measuring the intertidal wetland for a long time is solved, the high automation capability is realized, the operation is time-saving and labor-saving, and the aim of continuously measuring for a long time is achieved.
Owner:THE FIRST INST OF OCEANOGRAPHY SOA

Intertidal zone offshore floating photovoltaic system and construction method thereof

The invention provides an intertidal zone offshore floating photovoltaic system and a construction method thereof, and the system comprises a floating pipe support system which comprises a floating pipe support and a plurality of floating boxes, wherein the two ends of the floating pipe support are respectively fixedly provided with a group of mooring piers; an anchoring and mooring system which comprises an anchoring pile, a rope, a ballasting block and a fixed pulley, wherein the fixed pulley is fixed to the top of the anchoring pile, the ballasting block is fixed to one end of the rope, andthe other end of the rope bypasses the fixed pulley in a crossed manner and is fixed to a set of mooring piers close to the anchoring pile; a floating type mooring system which comprises mooring piles and floating type mooring piers, wherein the floating type mooring piers are nested in the mooring piles, and the floating type mooring piers are connected with the mooring piers through ropes; anda photovoltaic system which comprises a plurality of groups of folding photovoltaic panels, wherein the inclination angles of the folding photovoltaic panels can be automatically adjusted to face sunlight. According to the present invention, the problems of singleness of offshore wind power generation and insufficient resource development and utilization are solved, and the overall benefit of offshore power generation is improved.
Owner:JIANGSU LONGYUAN OFFSHORE WIND POWER GENERATION

Coastal intertidal zone ecological restoration system and construction method thereof

The invention discloses a coastal intertidal zone ecological restoration system and a construction method thereof, relates to the technical field of coastal ecological restoration, and aims to solve the technical problems that water and soil loss is serious due to erosion of stormy waves during fluctuation and ebb tide, planted seedlings cannot be planted due to serious erosion of plant planting surfaces, and the survival rate is greatly reduced in the prior art. According to the coastal intertidal zone ecological restoration system and the construction method thereof, geotechnical cloth for preventing water and soil loss is laid at the bottom of a planting area, geocells and timber piles are assembled in the intertidal zone green planting area during ebb tide, the geocells are backfilled with planting soil, and the outer side edges are built into retaining walls for retaining water and soil through ecological bags. A gravel layer which is resistant to moisture and water scouring and has the particle size of 3-5 cm is laid on the surface layer of the planting area, and mangrove plants and aquatic plants which are resistant to scouring and salt and alkali are planted in the greening planting area to jointly act to construct a storm-resistant planting system, so that the survival rate of nursery stocks is increased, and the aim of ecological restoration of the coastal coast is achieved.
Owner:北京正和恒基滨水生态环境治理股份有限公司

Pile sinking method for driving large-diameter steel pipe pile in intertidal zone

ActiveCN102425167BReduced maximum lifting capacity requirementsLifting safetyWaterborne vesselsBulkheads/pilesPipeIntertidal area
The invention relates to a pile sinking method for driving a large-diameter steel pipe pile in an intertidal zone. The method is characterized in that: a ship special for large-diameter steel pipe pile transportation and auxiliary pile hoisting construction is matched with a full rotary hoisting ship to realize the large-diameter steel pipe pile sinking operation as the following steps of: machining the steel pipe pile and hoisting the steel pipe pile to the special ship; positioning the hoisting ship; arranging a tilt sensor at the top of the steel pipe pile; vertically hoisting the steel pipe pile; automatically sinking the vertical steel pipe pile into the mud; hoisting a steel wire rope to automatically throw off a hook; recording the vertical reading of the steel pipe pile; and hammering the sunken pile by using a hydraulic hammer. The method has the advantages that: the ship special for large-diameter steel pipe pile transportation and auxiliary pile hoisting construction is matched with the full rotary hoisting ship to realize the large-diameter steel pipe pile sinking operation, so that the steel pipe pile of 300 to 600 tons can be easily hoisted and turned over in the air, the requirement for the maximum hoisting weight of the hoisting ship is reduced, hoisting safety and convenience are ensured and the engineering cost is greatly saved.
Owner:天津港航工程有限公司 +1

Method for replacing spartina alterniflora community with suaeda salsa community in intertidal zone of mud flat

The invention belongs to the technical field of environmental restoration, and discloses a method for replacing a spartina alterniflora community with a suaeda salsa community in an intertidal zone of mud flat. The method comprises the steps that a cofferdam dam is constructed; after enclosure is conducted and before the new seedlings of spartina alterniflora are unearthed, water is stored to water the land; the watering time generally starts from winter or early spring of the next year; water is drained at the end of the current year after the stored water waters the spartina alterniflora habitat for more than 6 months or in mid-to-late April of the next year to expose the earth surface, and the field is naturally aired until the soil surface has dry crack gaps; local suaeda salsa seeds are selected and sown after the tide and when no extra heavy rain exists within 4-6 days; a water storage dam at a water inlet and a water outlet of a frame enclosure area is transformed into an overflow dam, and the overflow dam is enabled to be as high as or lower than the ground surface in the frame enclosure area; the reed and the spartina alterniflora are removed in a manual removing or chemical weeding mode to purify the suaeda salsa community. According to the method, the coastal mud flat wetland habitat is recovered, and the regional biodiversity can be protected.
Owner:YANCHENG INST OF TECH

Mangrove forest afforestation method for intensively weathered tuff geology and intertidal zones with high elevations

InactiveCN111771597AIncrease the areaConservation of germplasmClimate change adaptationGrowth substratesRhizophora stylosaGermplasm
The invention discloses a mangrove forest afforestation method for intensively weathered tuff geology and intertidal zones with high elevations. The method comprises the steps of a, site preparation,b, planting soil backfilling, c, water channel excavation and d, mangrove plant planting. One year after afforestation is completed, various mangrove nursery stocks grow well, the survival rate of avicennia marina, kandelia candel and Bruguiera gymnorrhiza is not lower than 60%, the survival rate of Rhizophora stylosa and aegiceras corniculatum is not lower than 70%, and the height of the nurserystocks is increased by 10-30 cm. By means of the method, the area of the mangrove forest in coastal areas in southeast and south China can be enlarged, and the important functions of the mangrove forest in the aspects of food supply, germplasm resource preservation, species diversity maintenance, wind prevention, wave dissipation, marine environment purification, ecological balance maintenance, carbon sink maintenance and the like are better played; meanwhile, the created water channel and mangrove forest coexist, diversified habitats are provided, and biodiversity conservation and recovery are better facilitated.
Owner:中交广州水运工程设计研究院有限公司 +1

Control method of invasive plants in intertidal zones

The invention relates to a control method of advanced invasive plants in the ecological remediation field of seaweed beds in intertidal zones, and specifically relates to a control method of invasiveplants, namely Spartina alterniflora Loisel in the intertidal zones. A control device of the Spartina alterniflora Loisel is provided with PVC boards and U-shaped steel nails for fixation. After withered Spartina alterniflora Loisel residue in a region is manually removed in an early growth stage (from March to April) of the Spartina alterniflora Loisel in a temperate-zone sea area, a layer of thePVC boards is uniformly and flatly laid close to the surface of earth, and two adjacent PVC boards are fixedly linked together through the U-shaped steel nails. The PVC boards are lightproof and arecapable of effectively preventing growth and propagation of the Spartina alterniflora Loisel. By utilizing the control method, the invasive plants can be effectively controlled; by combining with thesimple, convenient and effective control device of the Spartina alterniflora Loisel, the seaweed beds in the intertidal zones can be conveniently and rapidly remediated or reconstructed; and meanwhile, the PVC boards are capable of durably resisting stormy waves for two or more years and can be repeatedly used after recycling, so that the cost can be saved, the control method is economic and environment-friendly, and sea areas are not polluted.
Owner:INST OF OCEANOLOGY - CHINESE ACAD OF SCI

An integrated water and land adaptive surveying and mapping device for the intertidal zone

The invention provides integrated land and water self-adaptation mapping equipment for an intertidal zone. The integrated land and water self-adaptation mapping equipment comprises a high clearance four-wheel drive which comprises a drive body, and a mapping component is arranged on the upper rear portion of the drive body; extendable side skirts are arranged on the two sides of the drive body, and floats are fixedly connected to the side skirts. The mapping component comprises a supporting platform, a metal shell is arranged on the upper surface of the supporting platform, a GNSS receiver andan inertial navigation system are packaged in the metal shell, a laser scanner is connected to the metal shell, a metal frame is further arranged on the metal shell, the laser scanner is located in the metal frame, an industrial camera is connected to the metal frame, a connecting rod is connected to the industrial camera, and a GNSS antenna is arranged at the upper end of the connecting rod. A drag depth measuring device and a single beam depth measuring device are connected to the rear portion of the supporting platform. Through the integrated land and water self-adaptation mapping equipment for the intertidal zone, the multiple aspects of the carrier are optimized, and sufficient supports are provided when the blank region of the intertidal zone is measured.
Owner:山东省国土测绘院
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products