Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

36results about How to "Act as an anchor" patented technology

Special-shaped wall integral anchor rod

The invention discloses an abnormal wall integral anchor-pouring anchor rod, which comprises a steel pipe body drilled with eyelets, wherein an exposed section of the steel pipe body is processed with screw threads, and the wall thickness of the end of the exposed section of the steel pipe body is enlarged so that the steel pipe body becomes an abnormal wall steel pipe; the front end of the steel pipe is processed into a braided shape and is used as the anchoring end; and a reducing part of the steel pipe body is in a convex ring shape. The anchor rod has the advantages that the front end of the steel pipe is provided with the anchoring end to play a role of the anchor rod and prevent the abnormal wall steel pipe from rushing out of a bore hole in the process of slip casting; the exposed section of the steel pipe is processed with the screw threads after the wall thickness thereof is enlarged so as to ensure the effective wall thickness of the exposed section of a slip-casting anchor rod and enhance the tensile strength thereof so that the abnormal wall steel pipe plays the role of the anchor rod and plays the role of the slip casting; the wall thickness of the externally exposed end, and the tensile strength is enhanced, thus the anchoring force is improved; and because a convex ring at the reducing part plays a role of a check ring, a stop-grouting plug has good leak tightness, and slurry is not thrown up in the slip casting.
Owner:王光平 +3

Floating waterborne photovoltaic solar azimuth tracking system

The invention relates to a floating waterborne photovoltaic solar azimuth tracking system, which comprises a photovoltaic array, a rotation guide rail, gear teeth and drive devices. The photovoltaic array is circular. The photovoltaic array is peripherally equipped with the rotation guide rail. The rotation guide rail is provided with the gear teeth. The photovoltaic array is peripherally providedwith the drive devices uniformly. Each drive device comprises a pile, a buoyancy tank, a motor, a driving wheel and a connection shaft. The piles are hit into the bottom portion of a reservoir; the top portion of each pile is provided with a circular slot; an up-down-running-through circular hole is reserved in each buoyancy tank; and the connection shaft is in the shape of an umbrella, and is formed by an umbrella pole and an umbrella hat. The beneficial effects are that the system is suitable for different solar azimuths by adjusting direction of a photovoltaic assembly so as to improve power generating efficiency; and when water level changes, the buoyancy tank at the photovoltaic array side and the buoyancy tanks at the drive device sides float up and down with the change of the waterlevel, so that the driving wheels are allowed to be always in the same plane with the rotation guide rail.
Owner:ZHEJIANG JINGGONG ENERGY TECH GRP CO LTD

Construction method of pre-stressed anchor cable frame beam structure

The invention discloses a construction method of a pre-stressed anchor cable frame beam structure, and relates to the technical field of slope support. The construction method comprises the following steps that 1, a side slope is excavated; 2, after the side slope is excavated, anchor holes are formed in the side slope, the hole opening positions of the anchor holes are marked at a node A and a node B, and the node A and the node B are both located in the center of the intersection position of a cross beam and a vertical beam in a prefabricated frame beam; 3, anchor holes are drilled, anchor cable bodies are installed, and then anchor hole grouting is conducted; 4, after anchor hole grouting is completed, a frame beam foundation trench is excavated, and a frame beam is constructed; 5, after frame beam construction is completed, the anchor cables are tensioned and locked; and 6, after the anchor cables are tensioned and locked, grout supplementing and anchor sealing are conducted on the anchor head. By the adoption of the scheme, the pre-stressed anchor cables can be combined with the frame beams, the frame beams play a role of anchorage piers, and due to the fact that the effective contact area of the frame beams and the slope surface is large, deformation of the slope body under the action of the anchor cables can be limited.
Owner:RANKEN RAILWAY CONSTR GROUP

Method for treating water-absorbing heaving floor of bottom plate of coal mining roadway

The invention, which relates to the field of mine hydrogeology, discloses a method for treating a water-absorbing heaving floor of a bottom plate of a coal mining roadway. The method comprises the following steps: step one, observing a heaving floor of a bottom plate of a roadway to obtain a maximum height h of the heaving floor and a coordinate of the plane at which the maximum height is located;step two, carrying out slip casting and hole drilling on two bottom corners of the bottom plate the roadway; step three, carrying out slip casting reinforcement through the slip-casting drilling hole; step four, carrying out water-drawing hole drilling on the bottom plate the roadway and arranging a water pumping pipe and a floral tube in the water-drawing hole; step five, arranging sensors at the top plate and two sides of the roadway; step six, laying a vacuum pumping system on the bottom plate the roadway; step seven, starting the vacuum pumping system; step eight, stopping water pumping after reaching a water-drawing stopping standard; step nine, filling sedimentation, caused by the water pumping, of the bottom plate the roadway; and step ten, at coal mine tunneling and exploitation stages, repeating the steps from the step six to the step nine until scrap of the roadway under the condition of reaching the h by the height of the heaving floor. According to the invention, vacuum water pumping is carried out on the heaving floor, so that the water-absorbing expansion is eliminated.
Owner:LIUPANSHUI NORMAL UNIV

Distributed monitoring device and monitoring method of internal stress of tunnel surrounding rock, and construction method

The invention discloses a distributed monitoring device and monitoring method of internal stress of a tunnel surrounding rock, and a construction method. The device comprises a supporting rod member and a coupling base arranged on the outer side of the supporting rod member, a plurality of first grooves and second grooves arranged in a stagger manner are formed in an outer side wall of the coupling base along the circumferential direction, and sensing optical fibers are uniformly distributed in each second groove. The method comprises the steps of: deploying the distributed monitoring device of the internal stress of the tunnel surrounding rock in a drill hole of the tunnel surrounding rock; after the distributed monitoring device of the internal stress of the tunnel surrounding rock is deployed in the drill hole of the tunnel surrounding rock, performing hole sealing slip casting treatment on the drill hole of the surrounding rock; generating, by the sensing optical fibers located inthe monitoring device in the drill hole of the surrounding rock, Brillouin backscattering after being subjected to a longitudinal or lateral stress change; and after a Brillouin scattering measuring instrument measures the change amount of the sensing optical fibers, performing data analysis to determine the stress change position and size of the internal stress of the surrounding rock along the direction.
Owner:SHANDONG UNIV

Method for constructing hybrid catalyst and cascade degradation of organophosphorus nerve poison by fixing palladium and organophosphorus hydrolase by using COFs

The invention discloses a method for constructing a hybrid catalyst and cascade degradation of an organophosphorus nerve poison by fixing palladium and organophosphorus hydrolase by using COFs (Covalent Organic Frameworks), and the method comprises the following steps of: preparing a hydroxyl-containing covalent organic framework material from a monomer with triazinyl and a monomer with hydroxyl by using a hot solvent method; fixing palladium in situ into holes of the covalent organic framework material by using a two-phase method, and then carrying out carboxylation modification and activation; and finally, performing mixing with an OPH solution for enzyme immobilization to obtain the hybrid catalyst. The palladium nanoparticles and the organophosphorus hydrolase are co-immobilized on the covalent organic framework, so that the stability of the palladium nanoparticles and the organophosphorus hydrolase in the use process is improved. Specifically, the palladium nanoparticles are located in the pores, the enzyme is located on the surface, and the structure can ensure the accessibility of each chemical component and avoid mutual inhibition of different catalysts. The constructed hybrid catalyst is used for cascade degradation of the organophosphorus nerve poison, the degradation efficiency is high, degradation is more thorough, and the hybrid catalyst can be repeatedly used.
Owner:HEBEI UNIV OF TECH

Anchor-pulling construction method suitable for sedimentation deformation of overlaying soil layer of shallow-buried tunnel

The invention discloses an anchor-pulling construction method suitable for sedimentation deformation of an overlaying soil layer of a shallow-buried tunnel. The anchor-pulling construction method comprises the following steps that 1, pretreatment before tunnel excavation is conducted; 2, a grouting anchoring rod is constructed on each of the left portion and the right portion of the spandrel position of the overlaying soil layer of the tunnel; 3, foundation beams are constructed nearby the ground surface above the tunnel to fix anchoring heads of the anchoring rods; and 4, the tunnel is excavated through an upper-middle-lower three-step method. According to the anchor-pulling construction method, the anchoring rods are constructed on the spandrel position of the tunnel and connected with the foundation beams, anchoring force is exerted to the overlaying soil layer of the tunnel, and thus anchor-pulling effect is achieved; effective strengthening is conducted for avoiding loosening, andthe very good limiting and reducing effects are achieved on sedimentation deformation of the overlaying soil layer of the stratum shallow-buried tunnel; and the construction method is short in construction period, low in manufacturing cost and high in construction efficiency, unbalanced force generated in tunnel excavation can be dissipated, the strain state is adjusted, development of deformation is slowed down, the self-constraining effect is achieved, and the very good practical value is achieved.
Owner:XIAN UNIV OF TECH

Large-mining-height rib-spalling-preventing coal anchoring and roof grouting device and use method thereof

ActiveCN112282808APlay an integrated roleAct as an anchorAnchoring boltsCoalSoil science
The invention provides a large-mining-height rib-spalling-preventing coal anchoring and roof grouting device and a use method thereof. The coal anchoring and roof grouting device comprises a groutingpipe, bags and a blasting structure. The grouting pipe is a grouting liquid channel; the bags are arranged on the periphery of the grouting pipe; first grout outlets are formed in the positions, corresponding to the bags, of the grouting pipe; grouting liquid in the grouting pipe flows into the bags from the grout outlets; the grouting liquid in the bags flows out of the bags from small holes; andthe blasting structure is arranged at the end part of the grouting pipe and used for being opened to allow the grouting liquid to pass when the grouting pressure reaches a set value. A small amount of the grouting liquid is diffused to a hole sealing section through the small holes to fragmentize a coal body, and the fragmentized coal body is cemented, so that the anchoring effect is achieved; when the pressure of the grouting liquid reaches a certain value, the blasting structure is opened, and the grouting liquid with a certain pressure is injected into the cementing position of the coal body and a roof and diffuses towards the broken roof along the cementing surface, so that the effect of directionally reinforcing the broken roof and the coal wall is achieved; and therefore, the occurrence of a rib spalling accident is prevented.
Owner:HENAN POLYTECHNIC UNIV

System and method for adjusting seepage water pressure in slope with variable water level

The invention discloses a system and a method for adjusting seepage water pressure in a slope with a variable water level. The system comprises a water collecting anchor pipe at least partially arranged in the slope, a driver and a drainage pipe connected with the driver and the water collecting anchor pipe; when the water level drops, water in the water collecting anchor pipe enters the driver through the drainage pipe and is discharged through the driver; the method comprises the following steps: water level decline internal seepage water pressure adjustment is conducted; according to water level decline internal seepage water pressure adjustment, when the reservoir water level declines, decline of the underground water level in the slope lags behind the water level outside the slope, water in the water collecting anchor pipe is discharged under the combined action of suction force and pressure difference, and the water level in the slope is lowered. The system for adjusting seepage water pressure in the slope with the variable water level has the advantages that disturbance to the undisturbed soil body of the bank slope is small, underground water in the slope body above the reservoir water level can be synchronously discharged along with descending of reservoir water, the outward seepage water pressure in the bank slope is effectively reduced, and the stability of the bank slope is improved.
Owner:CHINA THREE GORGES UNIV

Biodegradable stent system for branch blood vessel at bifurcation

The invention discloses a biodegradable stent system for a branch blood vessel at a bifurcation. The biodegradable stent system for the branch blood vessel at the bifurcation comprises a biodegradablestent and a heteromorphic saccule. The biodegradable stent comprises a stent support part extended along the branch blood vessel and used for placing in the branch blood vessel; and a stent fixing part positioned at the bottom of the stent support part and used for anchoring at the connection part of a main blood vessel and the branch blood vessel. The heteromorphic saccule comprises a saccule fixing part extending along the main blood vessel and tightly adhered to the main blood vessel; and a saccule support part connected with the saccule fixing part and installed at the inner side of the stent support part, wherein the saccule support part is capable of supporting the external expansion of the stent support part, so the stent support part can be tightly adhered to the branch blood vessel. The above biodegradable stent system is capable of, through pressing the heteromorphic saccule to cause the plastic deformation of the stent fixing part so that the saccule fixing part is tightlyadhered to the main blood vessel wall, ensuring the complete cover of the biodegradable stent to the branch blood vessel lesion, preventing the stent fixing part from hindering the blood flow of the main blood vessel, and avoiding the stent displacement caused by the long-term impact of the blood flow of the branch blood vessel.
Owner:上海脉全医疗器械有限公司

drug-coated stent graft

The invention discloses a medicine-applying filming support. The medicine-applying filming support comprises a supporting body, an inner film and an outer film. The inner film is closely attached to an inner cavity of the support body and fixedly connected with the support body; filming areas are formed in the portions, provided with the inner film, of the support body, the outer film is wound around the support body relative to the outer surface of the filming areas, and the support body is firmly wrapped by the outer film in the middle of the inner film and the outer film; bare support areas are formed in the portions, not provided with the inner film, of the support body, and the bare support areas and the filming areas are sequentially and alternately arranged. According to the medicine-applying filming support, the bending performance of the filming support is improved through the filming mode; meanwhile, the wall attaching performance and the stability of the filming support are improved, and the problem that the filming support is prone to shifting is effectively solved. The inner cavity of the film is coated with anticoagulation medicine, and thrombosis is reduced; the whole outer wall of the filming support is loaded with medicine for inhibiting smooth-muscle-cell proliferation and migration, and restenosis of the inside and the two ends of the postoperation support cavity is effectively prevented.
Owner:ZHEJIANG BELONGS TO A MEDICAL INSTR

Integrated electromagnetic head structure

The invention discloses an integrated electromagnetic head structure, relates to the field of automobile variable-speed hydraulic electromagnetic valves, and aims to solve the problems that a traditional electromagnetic head structure has a large number of parts and high assembly requirements, and complex part shapes are needed to maintain an inverted magnetic path. According to the technical scheme, the integrated electromagnetic head structure is characterized by comprising a shell, a blocking iron is arranged in the shell, a sliding hole is formed in the middle of the blocking iron, an armature push rod is arranged in the sliding hole, and the side wall of the armature push rod is provided with a cascade ring groove which makes the armature push rod be dumbbell-shaped. According to theintegrated electromagnetic head structure, the structure of the electromagnetic head is simplified, a traditional armature, a valve core push rod and a pole shoe are integrated into a stepped core part, namely the armature push rod, so that the number of parts can be reduced. The armature push rod is made of the same material as an armature and plays the role of the armature, the structure can bemoved directly, complicated reverse magnetic paths are not needed, and assembly requirements are greatly reduced.
Owner:HILITE AUTOMOTIVE SYST (CHANGSHU) CO LTD

Metal sheet material with texture decorative effect and manufacturing method thereof

The invention relates to the technical field of decorative materials, and discloses a metal sheet material with a texture decorative effect and a manufacturing method thereof. The metal sheet materialis obtained by the following steps: (1) The slurry is coated or poured into a textured silicone mold to form a surface decoration layer, and the thickness of the coating or perfusion is 1-3 mm; (2) Warm the surface decoration layer to 50-150 DEG C until the surface decoration layer is in a semi-cured state; (3) Apply a 0.2-1 mm thick slurry layer on the non-textured back of the semi-cured surfacedecorative layer, and the metal sheet (frame) with holes is pressed on the slurry layer until the metal sheet (frame) with holes is solidified and formed. A variety of surface decorative layers withdecorative effects can be formed by silicone molds. Then, the semi-cured surface decorative layer is coated with the slurry and press-fastened with the perforated metal sheet (frame), and after the hole of the metal sheet (frame) is solidified after the slurry is filled, the perforated metal sheet (frame) can serve as an anchor after the slurry is solidified, so that the surface material is firmlyconnected with the metal plate (frame), and the perforated metal sheet (frame) also has a breathable effect.
Owner:GUANGXI PHOMI MCM CO LTD

Long-line fishing bait hanging machine

PendingCN112753664AAct as an anchorSolve stale problemsFish-hooksEngineeringZoology
The invention discloses a long-line fishing bait hanging machine which comprises a line hook assembly, a bait hanging machine body and an anchoring weight. The line hook assembly comprises a hook collecting rod, a pay-off basin, a plurality of fishhooks, main lines and a plurality of sub-lines, the top of the pay-off basin is of an opening structure, the hook collecting rod is located above the pay-off basin, and the fishhooks are arranged on the hook collecting rod at equal intervals; and the main lines are placed in the pay-off basin at equal intervals, one end of each of the multiple sub-lines is fixedly connected with the corresponding fishhook, and the end, away from the corresponding fishhook, of each of the multiple sub-lines is fixedly connected with one end of the corresponding main line. The long-line fishing bait hanging machine is reasonable in design and good in practicability, the problems that in the existing long-line fishing process, baits are not fresh easily, the requirement for manual operation of workers is high, the requirement for the degree of skill of the workers is high, and the conditions that fishhooks fall off easily, the baits fall off and the fishhooks stab or scrape the hands easily occur can be solved, the automatic bait hanging function is achieved, the pulling amount of the workers is reduced, and the working efficiency is improved.
Owner:吴桂平 +1

A treatment method for water-absorbing floor drum of coal mining roadway floor

The invention, which relates to the field of mine hydrogeology, discloses a method for treating a water-absorbing heaving floor of a bottom plate of a coal mining roadway. The method comprises the following steps: step one, observing a heaving floor of a bottom plate of a roadway to obtain a maximum height h of the heaving floor and a coordinate of the plane at which the maximum height is located;step two, carrying out slip casting and hole drilling on two bottom corners of the bottom plate the roadway; step three, carrying out slip casting reinforcement through the slip-casting drilling hole; step four, carrying out water-drawing hole drilling on the bottom plate the roadway and arranging a water pumping pipe and a floral tube in the water-drawing hole; step five, arranging sensors at the top plate and two sides of the roadway; step six, laying a vacuum pumping system on the bottom plate the roadway; step seven, starting the vacuum pumping system; step eight, stopping water pumping after reaching a water-drawing stopping standard; step nine, filling sedimentation, caused by the water pumping, of the bottom plate the roadway; and step ten, at coal mine tunneling and exploitation stages, repeating the steps from the step six to the step nine until scrap of the roadway under the condition of reaching the h by the height of the heaving floor. According to the invention, vacuum water pumping is carried out on the heaving floor, so that the water-absorbing expansion is eliminated.
Owner:LIUPANSHUI NORMAL UNIV

Double-anchoring and double-packing tie-back system for staged fracturing string

PendingCN114059956AEasy to operateMeeting Fracturing NeedsSealing/packingEngineeringStructural engineering
The invention discloses a double-anchoring and double-packing tie-back system for staged fracturing string. The double-anchoring and double-packing tie-back system comprises a first tie-back plug, a tie-back barrel and a second tie-back plug, a first anchoring device is arranged on the first tie-back plug and comprises a locking slip. A plurality of locking grooves are formed in one end of the locking slip, one end of each locking groove is open, and a simply supported beam structure is formed; a self-locking male buckle is further arranged on the locking slip; a self-locking female buckle is arranged on the inner wall of the tie-back barrel, the tie-back barrel is detachably connected with the locking slip through a locking groove of the locking slip and is locked with the self-locking male buckle through the self-locking female buckle, the lower end of the tie-back barrel is connected with a lower end pipe column, and an anti-retreating slip and a packer are sequentially arranged on the lower end pipe column from top to bottom. The upper end of the second tie-back plug is connected with the lower end of the lower-end pipe column, and the lower end of the second tie-back plug is further connected with another tie-back barrel in an anchoring mode. The double-anchoring design is adopted, the standby releasing function and the standby packing function are achieved, the use reliability of the tool is improved, and the construction risk is reduced.
Owner:中石化石油工程技术服务有限公司 +2
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products