Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

42results about How to "Small hole diameter" patented technology

Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method

The present invention discloses a running sand layer and sandy gravel layer dynamic-water double-liquid high-pressure slurry-injecting water-shutoff construction method which comprises the following construction steps: drilling a hole, flushing the hole, executing double-liquid high-pressure slurry-injecting operation and sealing the hole. The running sand layer and sandy gravel layer slurry-injecting liquid adopts an ordinary portland cement (P.O.42.5) and 40''Be sodium silicate as material for preparing the slurry, according to the weight proportion of water: cement, namely the cement slurry is prepared with the water cement ratio for 0.5-1.2:1. Then the slurry-injecting liquid is prepared with the volume ratio of cement slurry: sodium silicate for 1:0.08-0.15. The sodium silicate is taken as additive for regulating the initial setting time of the slurry-injecting liquid. The cement slurry can also be doped with fly-ash with cement consumption (weight proportion) for 10%-15%. The invention executes water-insulating construction aiming at the characteristics of large pressure of the underground dynamic water and high flowing velocity in the running sand layer and sandy gravel layer, and can obtain the maximal application sphere and optimum water-shutoff effect.
Owner:HUNAN CONSTR ENG GRP COR

Method for treating landslide projects through combining chemical electroosmosis method with micro anti-slide piles

The invention relates to a method for treating landslide projects through combining a chemical electroosmosis method with micro anti-slide piles. The method comprises the following steps of: arranging metal electrodes and pouring different chemical solutions in boreholes and forming electroosmosis and chemical reaction under the action of a direct current field so as to enhance the shear strengthof potential failure surfaces of sliding zones; and then casting concrete in the boreholes and forming a micro reinforced concrete anti-slide pile system so as to provide a slide-resisting force. Themethod for treating the landslide projects through combining the chemical electroosmosis method with the micro anti-slide piles has the advantages and effects that: through carrying out electroosmosis reinforcement on the soft soil layers of potential landslide zones by using the chemical electroosmosis method, the coefficient of the shear strength of the potential landslide zones is remarkably increased, and the processing cost for the anti-slide piles or other treatment methods is effectively reduced; the bore diameter of the boreholes required by the micro anti-slide piles is small and themicro anti-slide piles are formed in identical boreholes to those for the chemical electroosmosis method through sequentially constructing, thus the difficulty and the cost for boring are low; and the shear strength and the slide-resisting force for landslide sliding zones are effectively enhanced. The method provided by the invention has the characteristics of simple construction technology, strong operability, convenience for quality control, obvious economic benefit and remarkable effect for treating landslides.
Owner:HOHAI UNIV

High slope earthwork and support engineering construction method

The invention discloses a high slope earthwork and support engineering construction method which comprises the following steps of: carrying out construction measurement, pay-off and positioning; clearing and excavating a temporary drainage ditch; excavating a first layer of earthwork of a current-class slope; finishing a side slope of the current-class slope; drilling on the current-class slope according to a preset anchor cable installation position to form an anchor cable mounting hole; manufacturing and installing an anchor cable on the current-class slope; grouting the anchor cable mounting hole on the current-class slope; excavating a lower layer of earthwork of the current-class slope; constructing a waist rail on the current-class slope; carrying out prestressed anchor cable tensioning and locking on the current-class slope; sealing and anchoring the current-class slope; repeating the construction step of the current-class slope and completing the construction of a subsequent-class slope; and monitoring the side slope. Due to the adoption of the high slope earthwork and support engineering construction method disclosed by the invention, the high slope earthwork and support engineering construction method capable of effectively ensuring the stability of the side slope after the side slope is excavated is implemented. The high slope earthwork and support engineering construction method has the characteristics that after construction, a rock-soil body has stable structure; the process is simple and convenient; the high slope earthwork and support engineering construction method is safe to construct; the investment of large-scale mechanical equipment is reduced; and the cost is saved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

Flue-cured tobacco open field culture round hole type transplanting method

The invention discloses a flue-cured tobacco open field culture round hole type transplanting method. The method comprises the following steps: (1) carrying out land preparation, ditching, applying a basic fertilizer and ridging; (2) carrying out punching to form round holes on ridge bodies by adopting a puncher; (3) vertically placing the tobacco seedlings into the round holes in a mode that roots are downwards to carry out transplanting; (4) sprinkling root fixing water in which a seedling improvement fertilizer is dissolved along the hole walls and at the same day, spraying a pesticide; and (5) after transplanting seedlings for 3 to 5 days, checking and supplementing the seedlings, applying an additional fertilizer after 10 days, filling the round holes after 15 days, earthing to ditches until ridge bodies are full after 35 days, and then entering the management stage. The method has the following advantages that 1, the transplanting round holes have small diameters so as to cause low damage to the ridge bodies and a mulched plastic film; 2, the method has no compressing effect on soil in the holes; 3, tobacco seedling transplanting efficiency is improved; 4, the tobacco seedlings are promoted to early grow and quickly tiller and growth neatness of the tobacco seedlings is improved; and 5, the method is simple to operate and is easy to popularize. The method is suitable for planting flue-cured tobacco.
Owner:GUIZHOU TOBACCO SCI RES INST

Distributed soil heat conductivity coefficient testing system and testing method thereof

The invention discloses a distributed soil heat conductivity coefficient testing method and testing system, and the testing method comprises the following steps: burying a composite optical cable in ato-be-tested soil body, wherein the composite optical cable comprises an optical fiber and a thermal resistance material layer wrapping the optical fiber; a heating control module is used for heatingthe to-be-measured soil body through the thermal resistance material layer, and an optical signal processing control module is used for continuously collecting heating temperature data of the stratum; processing the heating temperature data by using an optical signal processing control module, calculating and outputting heat conductivity coefficients of the soil body to be measured at different depths according to a heat conductivity coefficient calculation formula, and drawing a curve graph of the heat conductivity coefficients and the depths. According to the invention, the testing system is small in size, convenient to carry, long in testing distance, capable of monitoring the temperature change of the rock-soil body in a deeper range, high in testing efficiency, small in testing result error and capable of obtaining a refined stratum heat conductivity coefficient within a short testing time.
Owner:NANJING UNIV +1

Double drill push-the-bit type guide section

The invention discloses a double drill push-the-bit type guide section which includes an oil cylinder outer wrap, an oil cylinder, an internal drill pole and a support plate. The internal drill pole is arranged in the oil cylinder outer wrap and moves along the direction of the axle of the oil cylinder outer wrap. An accommodating cavity is arranged on the outer wall of the oil cylinder outer wrap. A decompression hole is formed in the bottom of the accommodating cavity. The oil cylinder is arranged in the decompression hole. The hole wall of the oil cylinder and the decompression hole slides correspondingly. A seal ring is used for sealing between the hole wall and the oil cylinder. The plunger of the oil cylinder is fixedly connected with the support plate. The oil cylinder outer wrap includes a drilling end and a dynamic end. A convex plate is arranged along the circumference of the inner wall of the oil cylinder outer wrap which is between the accommodating cavity and the dynamic end. The internal drill hole includes a drill pole neck and a drill pole body. The outer diameter of the drill pole body is greater than the outer diameter of the drill pole neck. When the drill pole neck of the internal drill pole moves to correspond to the convex plate, the place between the drill pole neck and the convex plate is provided with an annulus. When the drill pole body of the internal drill pole moves to correspond to the convex plate, the drill pole body is matched with the gap of the convex plate. The double drill push-the-bit type guide section adjusts the extension length of the support plate by adjusting the pressure of the drilling fluid and thus the rate of deviation change of the drilling tools is adjusted.
Owner:CHINA UNIV OF GEOSCIENCES (BEIJING)

Roadway-free ground drilling fluidization coal mining method

The invention discloses a roadway-free ground drilling fluidization coal mining method. A roadway-free ground drilling fluidization coal mining system comprises a physical fluidization coal mining part and a coal-rock mixture conveying part; the physical fluidization coal mining part comprises a coal mining vertical shaft, a high-pressure conveying pipe and a high-pressure jet device; and the coal-rock mixture conveying part comprises a process inclined shaft, a coal-rock mixture lifting vertical shaft and a coal-rock mixture conveying pipe. The bottom end of the coal mining vertical shaft and the bottom end of the coal-rock mixture lifting vertical shaft communicate with each other and are connected by adopting a directional drilling technology to form a coal-rock mixture self-flowing channel, by means of the height difference between the coal mining vertical shaft and the coal-rock mixture lifting vertical shaft, the coal-rock mixture which is cut by hydraulic power and is in a fluidized state automatically flows into a coal-rock mixture collecting bin and is pumped into the well through a slurry suction pump, the underground unmanned physical fluidized coal mining operation is achieved, and the coal mining vertical shaft, the process inclined shaft and the coal-rock mixture lifting vertical shaft can all adopt relatively small drilling apertures, so that relatively low coal mining cost is realized.
Owner:CHINA UNIV OF MINING & TECH

Hole forming process of hole bottom chambering device of anchoring hole

The invention provides a hole forming process of a hole bottom chambering device of an anchoring hole. The hole forming process comprises the following steps: the straight anchoring hole is struck; awater injecting guiding pipe (2) and a water pumping guiding pipe (3) are fixed into a rotary sleeve (1) through a fixing support (7), the bottoms of the water injecting guiding pipe (2) and the waterpumping guiding pipe (3) are made to stretch out of the rotary sleeve (1), and then the rotary sleeve (1) is placed into the straight anchoring hole; the water injecting guiding pipe (2) communicateswith an external high-pressure water pipe, and the water pumping guiding pipe (3) communicates with an external high-pressure water pump; the inner wall of the hole bottom of the anchoring hole is subjected to flow jet cutting through the water injecting guiding pipe (2), and meanwhile, the high-pressure water pump is adopted to pump mud at the hole bottom through the water pumping guiding pipe (3); after high-pressure flow jet hole cutting is completed, the high-pressure water pump is kept to continuously pump the mud at the hole bottom through the water pumping guiding pipe (3), and pumpingis stopped till the cement mud discharging amount of the high-pressure water pump is decreased; and the height of the water injecting guiding pipe (2) is adjusted to adjust the angle of a rotatable support (6), and the whole rotary sleeve (1) is taken out.
Owner:WUDA JUCHENG STRUCTURE CO LTD

Construction method for grouting by adopting highly spraying, drilling and grouting integrated machine

The invention discloses a construction method for grouting by adopting a highly spraying, drilling and grouting integrated machine. The construction method comprises the following steps: arranging a check ball valve at a spraying nozzle of the highly spraying, drilling and grouting integrated machine; performing drilling operation by adopting the highly spraying, drilling and grouting integrated machine, wherein a high-pressure medium which is used in a drilling process comprises the following components in parts by weight: 75 parts of cement, 45 parts of bentonite, 180 parts of clay, 6 parts of water glass and 300 parts of water; after drilling is completed, performing grouting operation directly, and simultaneously, adding 6 to 9 parts of a cement accelerating agent from the opening of a hole. The construction method has the beneficial effects that the problems of blockage of the spraying nozzle caused by the fact that fine grains in the hole fall back to the spraying nozzle because of blowing-out in a process of connecting a long drilling rod to a drilled hole and serious water leakage in the hole in the drilling process can be solved; meanwhile, the disturbance to a stratum caused by the fact that the spraying, drilling and grouting integrated machine takes air and slurry as drilling media avoided by taking the measures of the check ball valve, the drilling aperture is reduced, the drilling efficiency is improved, and the cost for treating drilling slag and protecting a wall of the drilled hole is reduced.
Owner:SINOHYDRO BUREAU 11 CO LTD

Enlarged shape memory alloy anchor rod and anchoring construction process thereof

The invention provides an enlarged shape memory alloy anchor rod and an anchoring construction process thereof. An anchor rod supporting structure of the anchor rod comprises a rod body and a rock and earth mass. A bearing table structure is arranged at the end of the rod body. The end of the rod body is sleeved with an annular shape memory alloy component. The rod body and the annular shape memory alloy component are combined and connected through a bearing table to form an integrated shape memory alloy anchor rod body. A predrilled hole is formed in the rock and earth mass, the shape memory alloy anchor rod body is inserted in the predrilled hole, and the shape memory alloy anchor rod body composed of the shape memory alloy component with complete shape memory recovery is locked through a building, a fastener, a carrying board and a table seat. The key construction process includes the steps that the annular shape memory alloy component is manufactured, so that the shape memory alloy anchor rod body, a cylindrical alloy anchor rod anchoring system and an enlarged alloy anchor rod system are formed, and finally an enlarged alloy anchor rod anchoring structure is obtained. By the adoption of the enlarged shape memory alloy anchor rod and the anchoring construction process, the anchoring force (pulling resistance) and the durability of the anchor rod structure can be improved, the application range of the anchor rod structure can be enlarged, the purpose of supporting the rock and earth mass is achieved, the construction process is simple, operation is convenient, and the effect is safe and reliable.
Owner:XUZHOU UNIV OF TECH

Parahydrogen enrichment device suitable for high-flow and high-pressure conditions

ActiveCN111115578ASpeed up temperature conductionSmall hole diameterHydrogen separationPhysicsEngineering
The invention provides a parahydrogen enrichment device suitable for high-flow and high-pressure conditions. The parahydrogen enrichment device comprises a temperature detection chamber, a temperaturedevice line protection pipe, a double-chamber connecting pipe, a parahydrogen enrichment chamber, a heat exchange rod, a pressure-maintaining filter cap, an input interface, a cooling pipe, an outputinterface, a catalyst and a temperature display, wherein the temperature detection chamber is connected with the cooling pipe, the double-chamber connecting pipe and the temperature device line protection pipe; the double-chamber connecting pipe is connected with the temperature detection chamber and the parahydrogen enrichment chamber; the parahydrogen enrichment chamber is in a sleeve form andis provided with the heat exchange rod and an outer pipe; the bottom of the parahydrogen enrichment chamber is connected with the double-chamber connecting pipe; the top of the parahydrogen enrichmentchamber is connected with the output interface; an annular cavity between the heat exchange rod and the parahydrogen enrichment chamber is filled with a catalyst; the heat exchange rod is mounted atthe bottom of an inner cavity of the parahydrogen enrichment chamber; the pressure-maintaining filter cap is provided with a filter layer and a pressure-maintaining layer and mounted at the top of theheat exchange rod; filter air holes are formed in the bottom of the pressure-maintaining filter cap; and pressure-maintaining air holes are formed in the side wall of the top of the pressure-maintaining filter cap. By means of such a technical scheme, heat transfer effect can be improved, certain pressure is kept, and high-flow conversion efficiency is improved.
Owner:XIAMEN UNIV

Draught fan silencing device and application of draught fan silencing device on transformer cooler draught fan

The invention provides a silencing device used for a transformer cooler draught fan. The silencing device comprises a silencing wind tunnel, a first silencing component, a second silencing component and a silencing material. The first silencing component is arranged in the silencing wind tunnel, the second silencing component is arranged in the first silencing component, windward parts of the first silencing component and the second silencing component form a taper structure, each of the first silencing component and the second silencing component is provided with several micropores and is filled with the silencing material. According to the invention, two layers of silencing components being of taper structures are arranged creatively, the silencing wind tunnel is arranged on the periphery of the silencing components, micropores are formed in the sidewalls of the silencing components, the silencing components are filled with silencing cotton, a prevention-type structure capable of reducing high-intermediate frequency noise and a resistance-type structure capable of reducing intermediate-low frequency noise are formed, the silencing frequency band is widened, the pressure loss is reduced, air flow regeneration noise is reduced, and a good silencing effect is achieved.
Owner:北京富特盘式电机有限公司

A Hole Forming Technology of Anchorage Hole Bottom Reaming Device

The invention provides a hole forming process of a hole bottom chambering device of an anchoring hole. The hole forming process comprises the following steps: the straight anchoring hole is struck; awater injecting guiding pipe (2) and a water pumping guiding pipe (3) are fixed into a rotary sleeve (1) through a fixing support (7), the bottoms of the water injecting guiding pipe (2) and the waterpumping guiding pipe (3) are made to stretch out of the rotary sleeve (1), and then the rotary sleeve (1) is placed into the straight anchoring hole; the water injecting guiding pipe (2) communicateswith an external high-pressure water pipe, and the water pumping guiding pipe (3) communicates with an external high-pressure water pump; the inner wall of the hole bottom of the anchoring hole is subjected to flow jet cutting through the water injecting guiding pipe (2), and meanwhile, the high-pressure water pump is adopted to pump mud at the hole bottom through the water pumping guiding pipe (3); after high-pressure flow jet hole cutting is completed, the high-pressure water pump is kept to continuously pump the mud at the hole bottom through the water pumping guiding pipe (3), and pumpingis stopped till the cement mud discharging amount of the high-pressure water pump is decreased; and the height of the water injecting guiding pipe (2) is adjusted to adjust the angle of a rotatable support (6), and the whole rotary sleeve (1) is taken out.
Owner:WUDA JUCHENG STRUCTURE CO LTD

Construction method of earthwork and support engineering for high slope

The invention discloses a high slope earthwork and support engineering construction method which comprises the following steps of: carrying out construction measurement, pay-off and positioning; clearing and excavating a temporary drainage ditch; excavating a first layer of earthwork of a current-class slope; finishing a side slope of the current-class slope; drilling on the current-class slope according to a preset anchor cable installation position to form an anchor cable mounting hole; manufacturing and installing an anchor cable on the current-class slope; grouting the anchor cable mounting hole on the current-class slope; excavating a lower layer of earthwork of the current-class slope; constructing a waist rail on the current-class slope; carrying out prestressed anchor cable tensioning and locking on the current-class slope; sealing and anchoring the current-class slope; repeating the construction step of the current-class slope and completing the construction of a subsequent-class slope; and monitoring the side slope. Due to the adoption of the high slope earthwork and support engineering construction method disclosed by the invention, the high slope earthwork and support engineering construction method capable of effectively ensuring the stability of the side slope after the side slope is excavated is implemented. The high slope earthwork and support engineering construction method has the characteristics that after construction, a rock-soil body has stable structure; the process is simple and convenient; the high slope earthwork and support engineering construction method is safe to construct; the investment of large-scale mechanical equipment is reduced; and the cost is saved.
Owner:CHINA CONSTR EIGHT ENG DIV CORP LTD

A Fan Muffling Device and Its Application to the Transformer Cooler Fan

ActiveCN106286414BIncrease the sound absorption frequency bandSmall pressure lossPump componentsPumpsTransformerIntermediate frequency
The invention provides a silencing device used for a transformer cooler draught fan. The silencing device comprises a silencing wind tunnel, a first silencing component, a second silencing component and a silencing material. The first silencing component is arranged in the silencing wind tunnel, the second silencing component is arranged in the first silencing component, windward parts of the first silencing component and the second silencing component form a taper structure, each of the first silencing component and the second silencing component is provided with several micropores and is filled with the silencing material. According to the invention, two layers of silencing components being of taper structures are arranged creatively, the silencing wind tunnel is arranged on the periphery of the silencing components, micropores are formed in the sidewalls of the silencing components, the silencing components are filled with silencing cotton, a prevention-type structure capable of reducing high-intermediate frequency noise and a resistance-type structure capable of reducing intermediate-low frequency noise are formed, the silencing frequency band is widened, the pressure loss is reduced, air flow regeneration noise is reduced, and a good silencing effect is achieved.
Owner:北京富特盘式电机有限公司

Detector for burying depth of antiseepage film of dam and using method of detector

The invention discloses a detector for the burying depth of an antiseepage film of a dam and a using method of the detector. The detector comprises a penetration rod, the penetration rod is inserted into a bore hole at one side of the antiseepage film via a fixing device, the bottom of the penetration rod is provided with a measuring electrode and a resistivity measuring instrument, the measuringelectrode and the resistivity measuring instrument are connected with a control display via a first lead in the penetration probe, the fixing device is installed in an orifice at one side of the antiseepage film, the penetration rod is inserted into the bore hole at one side of the antiseepage film slowly in segments via the fixing device, change of the current density with the depth in the control display is observed, and after a peak of the current density, the scale, corresponding to the current density peak, in the penetration rod body is read, and serves as the burying depth of the antiseepage film. After that dam soil is electrified, the current density peak in the bottom of the antiseepage film is detected, a measuring result is high in accuracy, the aperture of the bore hole formedby the detector in the dam is small, and damage on the dam itself is low.
Owner:HOHAI UNIV

Method for treating landslide projects through combining chemical electroosmosis method with micro anti-slide piles

The invention relates to a method for treating landslide projects through combining a chemical electroosmosis method with micro anti-slide piles. The method comprises the following steps of: arranging metal electrodes and pouring different chemical solutions in boreholes and forming electroosmosis and chemical reaction under the action of a direct current field so as to enhance the shear strengthof potential failure surfaces of sliding zones; and then casting concrete in the boreholes and forming a micro reinforced concrete anti-slide pile system so as to provide a slide-resisting force. Themethod for treating the landslide projects through combining the chemical electroosmosis method with the micro anti-slide piles has the advantages and effects that: through carrying out electroosmosis reinforcement on the soft soil layers of potential landslide zones by using the chemical electroosmosis method, the coefficient of the shear strength of the potential landslide zones is remarkably increased, and the processing cost for the anti-slide piles or other treatment methods is effectively reduced; the bore diameter of the boreholes required by the micro anti-slide piles is small and themicro anti-slide piles are formed in identical boreholes to those for the chemical electroosmosis method through sequentially constructing, thus the difficulty and the cost for boring are low; and the shear strength and the slide-resisting force for landslide sliding zones are effectively enhanced. The method provided by the invention has the characteristics of simple construction technology, strong operability, convenience for quality control, obvious economic benefit and remarkable effect for treating landslides.
Owner:HOHAI UNIV

A three-dimensional in-situ stress determination method based on borehole wall displacement measurement

The invention discloses a method for determining the three-dimensional ground stress based on the displacement measurement of the borehole wall. The measuring points are arranged in the hole section in a quincunx-shaped arrangement, and the angle between different test points between the drilling axes; C. The displacement test equipment is approached to the test point in the radial direction and pierces the mud layer of the hole wall, and the core drill bit is used along the Carry out circular cutting around the displacement measuring equipment in the radial direction, and transmit it to the ground in real time through the cable, and the stress relief is completed; D. After the strain relief operation is completed, the drilled core is broken by the core bit and stored on the ground; E. After the test work of all test points is completed, the side wall coring device is recovered and the core is taken out to obtain the three-dimensional ground stress of the test point. The method is easy to operate and easy to operate. The displacement components in different directions are obtained, and the relationship between the displacement of the hole wall and the far field stress is established to obtain the ground stress component at the measuring point.
Owner:INST OF ROCK & SOIL MECHANICS CHINESE ACAD OF SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products