Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

36results about How to "Strong anti-rutting ability" patented technology

Multicomponent system for improving modulus of asphalt mixture, and application method and modified asphalt thereof

InactiveCN103788667AImproved high temperature stabilityGuaranteed high strengthBuilding insulationsWaste tiresPliability
The invention relates to a multicomponent system for improving the modulus of asphalt mixture, and an application method and modified asphalt thereof, wherein the multicomponent system comprises the following active ingredients in parts by weight: 1-2 parts of calcium sulfate, 1-2 parts of animal and plant oil, and 5-7 parts of waste tire rubber powder. The application method comprises the following steps: taking a part of animal and plant oil in a closed tank, covering the waste tire rubber powder on the surface of animal and plant oil, sealing a test tank, and closely heating at 100-140DEG C; infiltrating the calcium sulfate whiskers with the remaining animal and plant oil, and stirring to be evenly mixed; transferring the mixture in the test tank into hot asphalt which is at 130-140DEG C, continuously stirring for 40-90min, removing a heat source, continuously stirring until the temperature is reduced to 110-120DEG C, adding the mixture of calcium sulfate whiskers and animal and plant oil, and continuously stirring until the temperature is reduced to 95-100DEG C. The modified asphalt has multiple characteristics of being high in strength, strong in track resistance capability, good in low-temperature flexibility and asphalt compatibility, economic and environmentally friendly and the like.
Owner:SHANGHAI PUDONG ROAD & BRIDGE CONSTR +3

SBS modified emulsified asphalt based on high solid content SBS emulsion

The invention discloses SBS modified emulsified asphalt based on high solid content SBS emulsion. The SBS modified emulsified asphalt based on the high solid content SBS emulsion is prepared from thefollowing components in parts by weight: 55 to 60 parts of matrix asphalt, 5 to 7 parts of high solid content SBS emulsion, 40 to 45 parts of water and 2 to 3 parts of an emulsifying agent. Accordingto the SBS modified emulsified asphalt based on the high solid content SBS emulsion, cyclohexane which is environmentally friendly and can enhance the stability of a system is selected as a solvent for dissolving SBS; a compound emulsifier with high surfactivity is preferred, so that the obtained SBS emulsion is high in stability and high in solid content; the modified emulsified asphalt is prepared by utilizing the SBS emulsion, and the characteristics of high solid content of evaporation residue, high softening point and the like can be shown; the obtained modified emulsified asphalt is applied to preventive maintenance of a road, and the advantages of high toughness and elasticity, low noise, strong rutting resistance and the like can be shown; therefore, the SBS modified emulsified asphalt based on the high solid content SBS emulsion is suitable to be popularized and applied.
Owner:WUHAN MUNICIPAL CONSTR GROUP

Easy compact asphalt mixing material and preparation method of easy compact asphalt mixing material

The invention discloses an easy compact asphalt mixing material and temperature and time control parameters in the preparation process of the easy compact asphalt mixing material. The easy compact asphalt mixing material comprises 100 parts of ore materials, 5.8 to 6.4 parts of modified asphalt, 0.2 to 0.3 parts of polyester fibers and 0.3 parts of easy compact agents, wherein the ore materials comprise the following ingredients in weight proportioning: 50 percent to 60 percent of 8-11mm macadam, 10 percent to 15 percent of 5-8mm macadam, 25 percent to 35 percent of manufactured sand and 3 percent to 8 percent of limestone ore powder. The ore materials are heated to 150 DEG C to 160 DEG C and is then subjected to dry stirring with polyester fibers for 5 to 10s, the modified asphalt is heated to 165 DEG C to 175 DEG C, the easy compact agents start to be sprayed after the modified asphalt is sprayed for 3s, the total time for spraying the asphalt and the easy compact agents is controlled to be within 13s, the ore powder is added after the wet stirring for 6s, the total time of the stirring and the mixing is not lower than 60s, the cylinder discharge temperature is controlled to 135 to 155 DEG C, and the easy compact asphalt mixing material is obtained. The mixing material is easy to compact, the rutting resistance capability is high, the construction temperature is reduced to 30 to 50 DEG C, heating energy sources are saved by about 22 percent, the emission of asphalt smoke and greenhouse gas such as CO2 is reduced, the effects of energy saving, emission reduction and environment protection are obvious, meanwhile, the construction quality is improved, the effective construction time is prolonged, and the work period is shortened.
Owner:中石化胜利建设工程有限公司

Preparation method of mixed pitch used for road building

The invention provides a preparation method of mixed pitch used for road building. The method comprises: a first step of preparing materials, namely a step of preparing 15-30% by weight of coal pitch, 42-51% of petroleum pitch and 28-34% of slurry; a second step of mixing, namely a step of heating the coal pitch, the petroleum pitch and the slurry to melt the materials, and uniformly stirring at 150-180 DEG C; a third step of shearing, namely, a step of subjecting the mixture obtained from the second step to high-speed shearing at 150-180 DEG C by utilization of a shearing emulsifying machine; and a fourth step of curing, namely, a step of maintaining the temperature of the mixture obtained in the third step at 150-180 DEG C and stirring. The mixed pitch allows the coal pitch and the petroleum pitch to be mixed more uniformly, thus largely reliving segregation. The mixed pitch is high in adhesive force, anti-ageing, and high in rutting resistance.
Owner:北京予知环境工程有限公司

Drainage asphalt pavement structure and construction method thereof

The invention discloses a drainage asphalt pavement structure and a construction method thereof. The drainage asphalt pavement structure sequentially comprises a soil base, a water-resisting layer, adrainage cushion layer, a reinforced gravel base layer, an assembly type interlocking water storage layer, a permeable transition layer, a permeable stress absorption layer and a drainage asphalt pavement layer from bottom to top. The reinforced gravel base layer is formed by combining honeycomb geocells and gravels; the assembly type interlocking water storage layer is formed by combining an assembly type concrete structure and a rubble layer; and the drainage asphalt surface layer adopts PAC-10 or PAC-13 and is formed by mixing, paving and rolling high-viscosity modified asphalt, 0.2-0.6% ofRC-GUARD<R> modified polypropylene monofilament fibers, coarse aggregate, fine aggregate, filler, 0.15-0.2% of an anti-stripping agent and 0.25-0.4% of an anti-rutting agent. The problems that the existing drainage asphalt pavement is easy to peel, loosen and block, and the pavement structure is low in water storage, water retention and durability are effectively solved, and the drainage asphaltpavement structure can be widely applied to parking lots, squares, park roads and light load roadways.
Owner:SICHUAN ROAD & BRIDGE GRP

Permeable anti-cracking road structure and construction method thereof

The invention discloses a water-permeable anti-cracking road structure and a construction method thereof. The water-permeable anti-cracking road structure sequentially comprises a water-permeable abrasion layer surface layer, a geocell open graded broken stone water-permeable cement concrete upper base layer, a geocell medium-coarse sand lower base layer, a geocell plain soil subbase layer and a roadbed from top to bottom. The pocket constraint effect of the geocell enables the soil composite elasticity modulus of the geocell to be increased exponentially, and meanwhile, the lateral deformation of the roadbed and the generation and development of cracks can be powerfully limited; and the thick plate effect generated by overlapping the three geocell structure layers guarantees that the roadbed has enough bending rigidity so as to reduce differential settlement of the road surface. The road structure belongs to a permeable pavement, has the advantages of environmental friendliness, modular design, convenience and quickness in construction, low construction cost and the like, can effectively avoid pavement cracks, high-temperature ruts and other diseases, and greatly enhances the driving safety and driving comfort in rainy days. The road structure and the method are suitable for various urban roads, grade highways, sports fields, squares, runways and other projects.
Owner:HUNAN UNIV OF SCI & ENG

Process for quickly repairing semi-rigid substrate damage of asphalt pavement

The invention discloses a process for quickly repairing semi-rigid substrate damage of an asphalt pavement, which comprises the following steps: milling and planing an asphalt topping and a loose substrate at normal temperature, leveling a roadbed, spreading gravels having a thickness of 10-20cm, spreading large stone asphalt mixtures of 25-40cm at twice, paving glass fiber grids, spreading coarse graded asphalt, cooling before opening to traffic for 2-3 days, and finally spreading topping asphalt concrete, thus finishing the quick repair of the semi-rigid substrate damage of an asphalt pavement. The invention can resist high plastic and shear deformation and bear heavy-duty traffic action, has fine rutting resistance, improves the high-temperature stability and water stability of the asphalt pavement, and has fine drainability; the on-site construction process is simple and feasible, and the operation time is short; the reflection crack resistance and pavement deformation resistance of the pavement are improved; the bonding property with the asphalt topping is fine, and the pavement structure can be stressed more evenly, thereby having high lasting quality; and by increasing large stone aggregate and reducing powdered ore, the construction cost is lowered.
Owner:杭州市市政设施监管中心 +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products