The invention discloses a blast construction method of an orientation window in the demolition blasting process of a
brick chimney. The orientation window is in a
right triangle ABC shape.
Lofting marking is carried out through a
total station. The orientation window comprises triangular-orientation-window vertexes A, B and C and sides AB, AC and BC of the triangle. Protective
layers are reserved at the portions, close to the sides, in the triangle ABC, the portion, left after the protective
layers are reserved, of the triangle ABC of the wall of the
chimney is in a triangle A'B'C' shape, hole distributing and hole drilling are carried out in the triangle A'B'C' of the outer wall of the
chimney through an air drilling
machine, and drilled holes include the blast holes and the guide hollow holes; and explosive charging blasting is carried out on the blast holes, bricks blasted to be loose are removed through a portable
machine, the protective
layers are removed through an air pick or other machines, and the bottom face and the slope of the triangular orientation window ABC are ground through tools such as a light
cutting machine. The blast construction method has the beneficial effects that labor intensity is small, the construction progress is rapid, the construction period is shortened,
mechanical abrasion is small, labor cost is low, comprehensive construction cost is low, the orientation window is accurately constructed, and it is guaranteed that the reserved portion, except for the orientation window, of the wall of the chimney is complete in structure, free of overexcavation and insufficient excavation and the like.