Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

128results about How to "Guarantee the quality of operation" patented technology

Mobile robot path planning method based on improvement of ant colony algorithm and particle swarm optimization

The invention discloses a mobile robot path planning method based on an improvement of an ant colony algorithm and particle swarm optimization. The method mainly solves the problems that in the prior art, the operating speed of an algorithm is low, and frequency of turning of an optimized path is high. The planning method includes the steps that modeling is carried out on a work environment of a robot; the particle swarm optimization is utilized to quickly carry out path planning, pheromones more than those around an obtained path are scattered on the obtained path, and guiding is provided for an ant colony; an ant colony algorithm optimized by the principle of inertia is adopted, and optimization is conducted on the basis of the particle swarm optimization; the motion path of the robot is output according to an optimization result. According to the planning method, comprehensive consideration is given to stability and robustness of the algorithm, iterations can be effectively reduced, searching efficiency is improved, the path length is shortened, the frequency of turning is reduced, path quality is substantially improved, and the planning method accords with an artificial planning intention and is suitable for autonomous navigation of various mobile robots in a static environment.
Owner:GUILIN UNIV OF ELECTRONIC TECH

Device and method based on BIM (Building Information Modeling) and operation and maintenance information interaction in intelligent building management

The invention provides a device and method based on BIM (Building Information Modeling) and operation and maintenance information interaction in intelligent building management. The device comprises asource data layer, a data storage layer, an external access layer, a platform application layer and a mobile and WeChat terminal, wherein the source data layer is used for extracting information, including the BIM, a GIS (Geographic Information System) model, an equipment standing book, equipment dynamic data and the like; the data storage layer is used for storing and matching models, information and data; the external access layer is used for extracting and accessing intelligent subsystem information; the platform application layer is used for BIM data interaction management and receiving and releasing an instruction; and the mobile and WeChat terminal is used for the mobile office of field management personnel. By use of the method, the "intensive construction, resource sharing and standard management" of the whole BIM operation and maintenance platform can be realized, on a premise of non-repetitive construction, the practical situation of a project is combined, big data, cloud computation, a BIM technology and an IOT (Internet Of Things) technology are used to comprehensively integrate each subsystem, data information and service resource on the basis of a uniform platform, and the operation and maintenance management level and the integrated service ability of a building are improved.
Owner:HUNAN CONSTR ENG GRP COR

Intelligent heat exchange station

InactiveCN103335359AResolve Coupling EffectsEliminate water imbalanceLighting and heating apparatusSpace heating and ventilation detailsEngineeringHeating power
The invention discloses an intelligent heat exchange station. The intelligent heat exchange station comprises a monitoring center, a control unit and a heat supply network second-level heat exchange station, wherein a plurality of adjusting monitoring devices are arranged in connecting pipelines of the heat supply network second-level heat exchange station, the adjusting monitoring devices are connected with the control unit, and the control unit collects data of the adjusting monitoring devices in the heat supply network second-level heat exchange station, carries out processing on the data, sends the data to the monitoring center in a wired or wireless mode, and carries out cooperation monitoring with the monitoring center or independent monitoring. According to the intelligent heat exchange station, a large number of physical quantities are monitored and are collected in real time through the control unit and the monitoring center, real-time collection and processing are carried out on parameters through a PLC, the running state and the running quality of a heat supply system can be mastered in a macroscopic mode, operating parameters of the heat supply system can be ensured, full-automatic adjustment is carried out on water power working conditions and heating power working conditions of a heat supply network, influence of coupling of heat exchange stations is eliminated, water supply imbalance of the heat supply network is eliminated, and the heat supply effect is balanced.
Owner:ZHEJIANG UNIV KUNSHAN INNOVATION INST

Computing power resource allocation method and device, equipment and storage medium

The embodiment of the invention discloses a computing power resource allocation method and device, equipment and a storage medium, containers corresponding to different business configurations, a computing power resource quota corresponding to each container configuration converts a first instance into an instance task when the submitted first instance is obtained for a target business, and according to a corresponding relationship between the business and the container, the target container corresponding to the target computing is determined. Iif it is determined that no available computing power resource exists in the target container according to the computing power resource quota corresponding to the target container, the instance task corresponding to the first instance is controlledto enter a task queue of the target container. When it is monitored that the available computing power resources appear in the target container, the target instance task is scheduled from the task queue to be put into operation. Since different services are isolated through the container, examples of the same service share the computing power resources of the same container, even if priority preemption occurs during scheduling, the priority preemption is only constrained in the container, the problem of computing power resource preemption among different services is avoided, and the user experience is improved.
Owner:TENCENT TECH (SHENZHEN) CO LTD

Video resource mirror image loading broadcasting method and system based on internet live streaming rooms

The invention discloses a video resource mirror image loading broadcasting method and system based on internet live streaming rooms, and relates to the field of video resource broadcasting in network live streaming rooms. The method includes the following steps: a front desk server performing mirror image indication on a designated internet live streaming room, a Flash server buffering the video resource in the mirror image internet live streaming room; if the front desk server monitoring that if a user ID logs out the mirror image internet live streaming room, the front desk server delivering a floating window that is established to the list interface of the internet live streaming room of a client to which the user ID belongs; the Flash server loading the buffered video resource to the floating window; if the floating window is clicked, the client automatically loads the video resource in the floating window to a corresponding network live streaming room. According to the invention, the method and the system enable users to watch video resources of the mirror image live streaming room that is logged outthrough the floating window; the user can re-enter the internet live streaming room by clicking the floating window. The method and the system have simple operation and are easy to promote.
Owner:WUHAN DOUYU NETWORK TECH CO LTD

Water treatment technology building method of circulating water system

The invention relates to a water treatment technology building method when a circulating water system is designed by a designer and a professional engineer. The water treatment technology building method of the circulating water system comprises the steps of: confirming the water quality parameter of the circulating water system; confirming the water quality parameter of make-up water; confirming a make-up water treatment technology of the circulating water system and selecting equipment; selecting the water treatment technology and the equipment of the circulating water system; and selecting a daily monitoring technology and equipment of the circulating water system. The water treatment technology building method of the circulating water system comprehensively considers the influence of each parameter which influences the circulating water system, comprehensively considers the complex relation and the mutual influence force of each factor, and confirms the standardized index which is suitable for each water quality parameter of the make-up water and circulating water of different circulating water systems, so that the most reasonable configuration of the circulating water system can be realized by the optimum treatment technology and the optimum equipment when the circulating water system is designed and operated.
Owner:北京科净源科技股份有限公司

Four-dimensional multi-angle evaluation system for enterprise process management

The invention discloses a four-dimensional multi-angle evaluation system for enterprise process management, relates to the technical field of information, and belongs to the technical field of aided decision-making and comprehensive evaluation. The four-dimensional multi-angle evaluation system comprises three functional modules, respectively being a four-dimensional process database, a process quality standardization database and a multi-angle process evaluation module; the evaluation system performs an evaluation process including the steps of: customizing a process quality standardization system and storing event information of the four-dimensional process database, and a random multi-angle process capability evaluation method is adopted. The key point of the four-dimensional multi-angle evaluation system is to construct a four-dimensional process data model of enterprise production management events; according to the four-dimensional multi-angle evaluation system, true and objective evaluation from multiple directions of the enterprise production management process is thoroughly achieved, all data for analyzing comes from actual events in an enterprise production management process, and the more scientific and comprehensive multi-angle process capability evaluation method is adopted. The four-dimensional multi-angle evaluation system is reasonable in design and strong in practicability, and can provide important references and actual bases for optimization and reorganization operation of an enterprise business process.
Owner:北京中电拓方科技股份有限公司

Method for testing first startup of first machines of pumped storage power stations

The invention discloses a method for testing first startup of first machines of pumped storage power stations. The method includes testing working conditions of water pumps of units; testing power generation working conditions of the units; testing working condition transformation; testing accidental shutdown. The guide vane opening is 17 degrees during tests for the working conditions of the water pumps of the units; guide vanes can quickly pass small guide vane opening zones of 0-5 degrees at the starting speeds of 2 degrees/second when pressures generated by the water pumps reach zero-flow lift and input power, load limiters of speed regulators are switched on by 100%, and accordingly the guide vanes can be opened to reach set opening of 17 degrees for the working conditions of the water pumps; closing law for the guide vanes includes closing total stroke of the guide vanes within 15 s if power sources are suddenly cut off in tests for working condition transformation and tests for accidental shutdown; closing law for water inlet ball valves includes that the valves are closed to reach opening of 20% from the original opening of 100% for the duration of 24.8 s in first sections and are closed to reach opening of 0 from the original opening of 20% for the duration of 37.2 s in second sections. The method has the advantages that economic benefits can be increased, the integral units are difficult to break down and are under good running conditions, the method is short in test cycle and high in work efficiency, and the service lives can be prolonged.
Owner:STATE GRID CORP OF CHINA +2

Power converter component importance evaluation method based on complex network

The invention relates to a power converter component importance evaluation method based on a complex network. The power converter component importance evaluation method based on the complex network comprises the steps that (1) an actual topology of a power converter is abstracted to form a complex network model, nodes in the complex network model serve as electronic components of the power converter, and edges of the complex network model serve as wires used for connecting the electronic components; (2) a component importance evaluation matrix is built according to the complex network model, and the component importance evaluation matrix uses proximity of the nodes to represent global importance of the nodes, and uses node degree values and contribution values of adjacent nodes to represent local importance of the nodes; (3) the importance of the electronic components is obtained from the component importance evaluation matrix. The power converter component importance evaluation method based on the complex network solves the problem that a traditional importance evaluation method cannot be easily and directly applied to the power converter, key components of the power converter can be effectively identified, the reliability design of the key components is directed, operation quality of the power converter is ensured, and the power converter component importance evaluation method based on the complex network is low in complexity and facilitates application.
Owner:SOUTH CHINA UNIV OF TECH

Operation resource allocation method and device, computer equipment and readable storage medium

PendingCN111724037ALower distribution costsReduce distribution errorForecastingResourcesThe InternetResource allocation
The invention discloses an operation resource allocation method and device, computer equipment and a readable storage medium. The invention relates to the technical field of the Internet, which constructs an operation resource allocation model, adopts the operation resource allocation model to perform resource allocation on the store to be allocated, reallocates operation resources subsequently, allocates the resources regularly according to actual conditions, reduces cost and allocation errors, ensures operation quality, and improves operation efficiency and user viscosity. The method comprises the steps of obtaining historical operation information of a to-be-distributed store; constructing an operation resource allocation model based on the historical operation information of the to-be-allocated store; extracting a first target operation resource from the at least one to-be-allocated operation resource, and allocating the first target operation resource to the to-be-allocated store;recording the operation duration of the first target operation resource allocated to the to-be-allocated store; and when the operation duration reaches the duration threshold, controlling the to-be-allocated store to perform operation resource allocation again.
Owner:KOUBEI SHANGHAI INFORMATION TECH CO LTD

Vehicle-mounted light full-winding fiber reinforced aluminum lining high-pressure hydrogen storage cylinder

The invention discloses a vehicle-mounted light full-winding fiber reinforced aluminum lining high-pressure hydrogen storage cylinder. The hydrogen storage cylinder comprises a variable-thickness seamless aluminum alloy lining (100), a reinforcing sleeve (200) mounted on a shoulder-connected bottle mouth (104) of the variable-thickness seamless aluminum alloy lining (100), carbon fiber winding layers (300) mounted on the outer surface of the variable-thickness seamless aluminum alloy lining (100) and the outer surface of the reinforcing sleeve (200), and glass fiber impact resisting layers (400) mounted on the outer surfaces of the carbon fiber winding layers (300) and the outer surface of the reinforcing sleeve (200); and a sleeve straight thread (201) on the inner surface of the reinforcing sleeve (200) made of aluminum alloys is in threaded connection with a bottle mouth straight thread (105) on the outer surface of the shoulder-connected bottle mouth (104). The hydrogen storage cylinder is compact in structure, light in weight, high in volume-weight ratio, high in working pressure and many in fatigue cycles, can improve the bottle mouth structure and the safety performance, andguarantees the operation quality.
Owner:SPECIAL EQUIP SAFETY SUPERVISION INSPECTION INST OF JIANGSU PROVINCE

Machining device of graphite heater

The invention discloses a machining device of a graphite heater. The machining device comprises a tool feeding mechanism and a slewing workbench which are matched in use, wherein the tool feeding mechanism comprises a rack and a lifting platform; a vertical column is arranged on the rack; the lifting platform is arranged on the vertical column in a sliding manner; a transverse sliding rail is arranged on the lifting platform; the machining device also comprises a speed reducer and a primary motor which is connected on the upper end of the speed reducer and is connected with the speed reducer; a rear side shell of the speed reducer is arranged on the transverse sliding rail in a sliding manner; the machining device further comprises a tool feeding screw rod the inner end of which is connected with the shell of the speed reducer and at the outer end of which a tool feeding hand wheel is arranged; the outer end of the output shaft of the speed reducer is connected with a tool head; the machining device further comprises a screw rod which longitudinally penetrates through the lifting platform and is in screw thread fit with the lifting platform; and a worm gear is connected on the upper end of the screw rod. According to the machining device of the graphite heater, a bar tool is driven to stably feed and lift within a relative large range, the requirement that longitudinal heating grooves are formed in the cylindrical graphite heater is met; and an operator can intuitively observe the machining track of a milling cutter, thus the operation quality is guaranteed and the defective rate is lowered.
Owner:烟台美尔森石墨有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products